Text
APPENDIX A Arizona Nuclear Power Project P.
0.
Box 52034
- Phoenix, Arizona 85072-2034 NOTICE OF VIOLATION Docket Nos.
50-528/50-530 License Nos.
NPF-41/NPF-74 During an inspection conducted on Hay 22, through July 4, 1988, violations of NRC requirements were identified.
In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR 2, Appendix C, the following violations were identified.
Item A is associated with License No.
Item B is associated with License No.
Technical Specification 6.8. 1 states, in part, "Written procedures shall be established, implemented, and maintained covering the activities referenced below:
The applicable procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978...."
Regulatory Guide 1.33, Revision 2, February 1978 recommends "Procedures for
- Startup, Operation, and Shutdown of Safety-Related PWR Systems".
ANPP Procedure 410P-1EC02, entitled "Essential Chilled Water Train "B" (EC)", Revision 6, Section 7.0, "Chemical Addition to Essential Chilled Mater Train "B" "dated May ll, 1988, states in part that subsequent to the addition of chemicals to the system in step 7.3. 17, "close chemical addition tank outlet valve EC-V101".
Contrary to the above, on June 14, 1988, Unit 1 valve EC-V101 was found to be in the open position following the addition of chemicals to the system on June 10, 1988.
This is a Severity Level IV Violation (Supplement I).
2.
ANPP Procedure 430P-3EMOl, entitled "Essential Cooling Water System (EW)
Train A", Revision 2, Section 11.0, "Chemical Addition to Train A" dated November 10, 1986, states in part that subsequent to the addition of chemicals to the system in steps ll.3. 8 and ll.3. 9, close chemical addition tank outlet valve EW-V051 and inlet valve EM-V005, respectively.
Contrary to the above, on June 13, 1988, Unit 3 valves EW-V051 and EW-V005 were found to be in the open position following the addition of chemicals to the system on June 7, 1988.
This is a Severity Level IV Violation (Supplement I).
8S08220228 SS0805 PDR ADOCK 0500052S O
Pursuant to the provisions of 10 CFR 2.201, Arizona Nuclear Power Project is hereby required to submit a written statement or explanation to the U.S.
Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, DC 20555 with a copy to the Regional Administrator, Region V, within 30 days of the date of the letter transmitting this Notice.
This reply should be clearly marked as a "Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation if admitted, (2) the corrective steps that have been taken and the results
- achieved, (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.
If an adequate reply is not received within the time specified in this Notice, an order may be issued to show cause why the license should not be modified, suspended, or revoked or why such other action as may be proper should not be taken.
Consideration may be given to extending the response time for good cause shown.
FOR THE NUCLEAR REG LATORY COMMISSION Fog-Robert J.
- Pate, Chief Reactor Safety Branch Dated at Walnut Creek, California this g~'ay of Ap+<,%1988