ML17304A261
| ML17304A261 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 06/29/1988 |
| From: | Pate R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17304A262 | List: |
| References | |
| NUDOCS 8807190135 | |
| Download: ML17304A261 (5) | |
See also: IR 05000529/1988018
Text
ACCELERATED
DISTRIBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ESSION NBR:8807190135
DOC.DATE: 88/06/29
NOTARIZED: NO
DOCKET
ACIL:STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi
05000529
AUTH.NAME
AUTHOR AFFILIATION
PATE,R.J.
Region 5, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
VAN BRUNT,E.E.
Arizona Nuclear Power Project (formerly Arizona Public Serv
SUBJECT:
Forwards Insp Rept 50-529/88-18
on 880523-0610.No violations
noted.
DISTRIBUTION CODE:
IEOID
COPIES
RECEIVED: LTR J
ENCL
/
SIZE: 2 +4
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:Standardized
plant.
RECIPIENT
ID CODE/NAME
PD5
DAVIS,M
INTERNAL: ACRS
DEDRO
NRR/DLPQ/PEB ll
NRR/DOEA DIR ll
NRR/DREP/RPB
10
NRR/PMAS/ILRB12
OE LIEBERMAN,J
G FI
02
GN
LE
01
EXTERNAL: LPDR
NOTES
COPIES
LTTR ENCL
1
1
2
2
2
2
1.
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
LICITRA,E
NRR MORISSEAU,D
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NUDOCS-ABSTRACT
OGC 15-B-18
RES/DRPS
DEPY
NRC PDR
COPIES
LTTR ENCL
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1'
1
1
1
05000529
S
A
'D
D
D
D
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
28
ENCL
28
Docket No.
50-529
Arizona Nuclear
Power Project
P.
0.
Box 52034
Phoenix,
85072-2034
Attention:
Mr.
E.
E.
Van Brunt, Jr.
Executive Vice President
Gentlemen:
SUBJECT:
NRC INSPECTION OF
PALO VERDE UNIT 2 ILRT
This refers to the routine inspection
conducted
by Mr.
C. Clark of this office
on May 23-June
10,
1988, of activities authorized
by NRC License
No.
and to the discussion
of our findings held with members of your staff at the
conclusion of the inspection.
Areas
examined during this inspection
are described
in the enclosed
inspectfon
report.
Within these
areas,
the inspection consisted of selective
examination
of procedures
and representative
records,
interviews with personnel,
and
observations
by the inspector.
No violations of NRC requirements
were identified within the scope of this
inspection.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be glad to
discuss
them with you.
Sincerely,
Or()i'no.l Si'jn ed
Robert J.
Pate,
Chief
Reactor Safety Branch
Encl osur e:
~ .:
Inspection Report
No. 50-529/88-18
cc w/copy of enclosure:
J.
G.
Haynes,
Vice President,
Nuclear Production
W.
F. guinn, Director, Nuclear Safety
8 Licensing
R.
Papworth, Director, guality Assurance
L. Souza,
Manager, guality Audits 8 Monitoring
T.
D. Shriver,
Manager,
Compliance
C.
N.
Russo,
Manager,
gA Audits/Monitoring
Lynne Bernabei,
(GAP)
Timothy Hogan, Chief Counsel,
Arizona Corp.
Commission
A.
C. Gehr,
Esq.,
Snell
& Wilmer
8807190i35
880629
ADOCK 05000529
-2-
bcc w/copy of enclosure:
Docket File
Project Inspector
Resident
Inspector
G.
Cook,
RV
B. Faulkenberry,
RV
J. Martin,
RV
T. Foley,
bcc w/o enclosure:
M. Smith
J. Zollicoffer
REGION V
CClark/Joan
6/A/88
gQQ
SRichards
6/2~/88
RJPate
6/pl /88
VEST COPY
3
EST
COPY
3
YES /
NO
ES /
NO
EST
COPY
g
E
/
NO
TO
YE
/
NO