ML17304A253

From kanterella
Jump to navigation Jump to search
Forwards Suppl 1 to Palo Verde Nuclear Generating Station Unit 3 Startup Rept, Covering Open Items at Time of Startup Rept Submission.Suppl 2,addressing CPC & Core Operating Limit Support Sys Verifications Will Be Submitted by 881006
ML17304A253
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 07/01/1988
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17304A254 List:
References
161-01148-EEVB, 161-1148-EEVB, NUDOCS 8807130046
Download: ML17304A253 (4)


Text

ACCE1ERATED DIST IBUTION DEMONSTRATION SYSTEM REOODATO ZNFOReZRTZON DZSTRZBOTZON +TEM (RZDS)

ACCESSION NBR:8807130046 DOC.DATE: 88/07/01 NOTARiZED:

NO DOCKET FACIL:STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION VAN BRUNT,E.E.

Arizona Nuclear Power Project (formerly Arizona Public Serv RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards Suppl 1 to "Palo Verde Nuclear Generating Station Unit 3 Startup Rept." Suppl 2 will be submitted by 881006.

DISTRIBUTION CODE:

ZE26D COPIES RECEIVED:LTR

(

ENCL /

SIZE:

/+0 TITLE: Startup Report/Refueling Report (per Tech Specs)

NOTES:Standardized plant.

RECIPIENT ID CODE/NAME PD5 LA LICITRAFE INTERNAL: ACRS NRR CHATTERTON EG 02 RG FILE 01 EXTERNAL: LPDR NSIC NOTES:

COPIES LTTR ENCL 1

0 2

2 5

5 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD5 PD DAVISFM ARM TECH ADV NUDOCS-ABSTRACT RES/DRPS DEPY RGN2/DRSS/EPRPB NRC PDR COPIES LTTR ENCL 1

1 2

2 1

1 1

1 1

1 1

1 1

1 05000530 SI h

S D

D e

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 22 ENCL 21 J

It

~i

,/

Arizona Nuclear Power Project P.O. 8OX 52034

~

PHOENIX. ARIZONA85072-2034 Docket No.

STN 50-530 161-01148-EEVB/PGN July 1, 1988 Document Control Desk U.S. Nuclear Regulatory Commission Mail Station Pl-137 Washington, D.C.

20555

Reference:

Letter from E. E.

Van Brunt, Jr.,

ANPP, dated April 6, 1988 (161-00926).

Subject:

Unit 3 Startup Report.

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 3 Startup Report Supplement 1

File:

88-001-404; 88-G-056-026 Attached please find thirty-six (36) copies of Supplement 1

to the Startup Report (referenced above) prepared and submitted pursuant to Specificatibn 6.9.1.3 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station Unit 3 Operating License.

Supplement 1 covers the items that were open at the time the Startup Report was submitted, which are the Main and Emergency Feedwater Systems Test and the CPC Verification and COLSS Verification.

Supplement 2 to the Startup Report will be submitted by October 6,

1988, and will address the CPC Verification and COLSS Verification.

The results of the Main and Emergency Feedwater Systems Test will be addressed in a

separate submittal at the time the test is performed.

If you have any questions, please contact me.

PD

~~00+6 88070f R

ADOCK- 050005+0 PNU EEVB/PGN/pvk Attachment Very truly yours a I~

E.

E. Van Brunt, Jr.

Executive Vice President Prospect Director cc:

G.

W. Knighton (all w/a)

M. J. Davis J.

B. Martin (2 copies)

T. J. Polich A. C. Gehr INPO Records Center

0