AQ.CELZRATED D3 BUTION gag()gg~p~()g A
REGULAT INFORMATION DISTRIBUTION STEM (RIDS)
ACCESSION NBR:8807120444 DOC.DATE: 88/07/06 NOTARIZED:
NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION VAN BRUNT,E.E.
Arizona Nuclear Power Project (formerly Arizona Public Serv RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards addi info re proposed Tech Specs change revising Surveillance Requirement 4.5.2.h.
DISTRIBUTION CODE:
A001D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal: General Distribution NOTES:Standardized plant.
Standardized plant.
Standardized plant.
RECIPIENT ID CODE/NAME PD5 LA LICITRA,E INTERNAL: ACRS NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/RSB 8E NRR/PMAS/ILRB12 OGC 15-B-18 RES/DE/EIB EXTERNAL: LPDR NSIC NOTES:
COPIES LTTR ENCL 1
0 1
1 6
6 1
1 1
1 1
1 1
1 1
0 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD5 PD DAVISiM ARM/DAF/LFMB NRR/DEST/CEB 8H NRR/DEST/MTB 9H NRR/DOEA/TSB 11 NUD-
~B RACT G FILE 01 NRC PDR COPIES LTTR ENCL 5
5 1
1 1
0 1
1 1
1 1
1 1
1 1
1 1
1 05000528 05000529'5000530 h
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 30 ENCL 27
Arizona Nuclear Power Project P.O. BOX 52034
~
PHOENIX. ARIZONA85072-2034 161-01155-EEVB/BJA July 6, 1988 Docket Nos.
STN 50-528/529/530 Document Control Desk U.
S. -Nuclear Regulatory Commission Mail Station Pl-137 Washington, D.C.
20555
References:
(1)
Letter from E.
A.
- Licitra, NRC, to E.
E. Van Brunt, Jr.,
- ANPP, dated May 3,
1988.
Subject:
Proposed Technical Specification
- Change, LPSI Flow Requirements for Palo Verde.
(2)
Letter from E.
E. Van Brunt, Jr.,
Subject:
Proposed Technical Specification Change LPSI Flow Requirements.
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 and 3
LPSI Flow Requirements File:
88-A-056-026; 88-F-005-419.05 By Reference (2),
we submitted a proposed change to the Palo Verde Technical Specifications.
The proposed change will revise Surveillance Requirement 4.5.2.h concerning the Low Pressure Safety Injection (LPSI) subsystem.
Specifically, the proposed revision will change the total injection loop flow from 4900 + 100 gpm to 4800
+
200 gpm.
Additionally, the injection leg maximum deviation will be changed from 100 gpm to 200 gpm.
Your preliminary review of the requested change is documented in Reference (1).
In Reference (1), you stated that the change request did not provide sufficient justification to allow you to complete your evaluation of the proposed change.
Additionally, you stated that the request needs to address whether the proposed reduction in flow rate affects the assumptions used in the ECCS analysis of record.
In response to your preliminary evaluation, we have prepared additional information on this subject.
The additional information is provided in the attachment to this letter.
This information supplements that which we have provided previously in Reference (2) and the information responds to your request that we address the ECCS analysis assumptions.
8807120444 880706 PDR ADOCK 05000528 P
PNU
t
Document Control Desk Page 2
161-01155-HEVB/BJA July 6, 1988 If you have any additional questions on this
- matter, please call Mr. A. C. Rogers at (602) 371-4041.
Very truly yours, CU~ n~
E.
E. Van Brunt, Jr.
Executive Vice President Project Director EEVB/BJA/dl!9 Attachment cc:
G.
W. Knighton M. J. Davis T. J. Polich J.
B. Martin A. C. Gehr (all w/a)
~j I
I'I l'
ATTACHMENT ADDITIONALINFORMATION ON PROPOSED TECHNICAL SPECIFICATION CHANGE The large break LOCA analysis of record was provided in a letter dated October 3, 1985.
This ECCS analysis was for the limiting large break LOCA (i.e.,
double ended guillotine break of a RCP discharge line) and is valid for cycles 1 and 2 at PVNGS.
For the analysis of record, a LPSI flow rate of approximately 4214 gpm was assumed.
Note that this flow rate is for a single LPSI pump injecting into a depressurized (i.e.,
0 psig)
The current Technical Specification flow requirements are conservatively higher than the assumed flowrates
~
The Technical Specification required flow accounts for factors such as instrument inaccuracy and pump degradation.
The proposed Technical Specification change will incorporate the following changes to Surveillance Requirement 4.5.2.h for the LPSI subsystem:
i)
The total injection flow for each injection loop is changed from 4900
+
100 gpm to 4800 + 200 gpm.
The change lowers the nominal flowrate by 100 gpm and increases the flow tolerance to +200 gpm.
ii)
The tolerance for the individual injection leg flow balances is changed from 100 gpm to 200 gpm (i.e., the flowrate for each injection leg of an injection loop shall be within 200 gpm of each other).
When these changes and the normal conservatisms are accounted for, a safety analysis assumed flowrate of 3744 gpm results.
Again, this flowrate is for a
single LPSI pump injecting into a depressurized RCS.
The net result of the proposed changes is a reduction of 470 gpm in the assumed value,
- However, the conclusions from the ECCS analysis of record remain valid when the reduced LSPI flow rates are assumed.
The adequacy of the combined safety injection flow can be evaluated.
The acceptance criteria for the evaluation is that the total safety injection flow must be capable of maintaining a full reactor vessel downcomer annulus following discharge of the Safety Injection Tanks (SITs).
Any flow in excess of that required to maintain a full downcomer annulus is assumed
'to be spillage and is not required to assure adequate core cooling.
The amount of safety injection flow required to maintain a full downcomer annulus has been calculated and is shown in Figure 1.
Also shown in Figure 1 are the total safety injection flows assuming:
- 1) the existing Technical Specification flow requirements, and 2) the proposed LSPI flow requirements.
The effect of the proposed change is to reduce the amount spillage assumed in the analysis.
The reactor vessel downcomer annulus is kept full.
Therefore, the conclusions from the analysis of record remain valid.
t 0
(a g ~
I
~4 10 g(
MINIMUM MPSI/LPSI FLOW OF ANALYSIS OF RECORO Figure I D
Q Q
0 hl 8
I 0
h.
Z 0
I-0 bJ z
hl h.'INIMUM HPSI/LPSI FLOW WITH PROPOSED LPSI TECH SPEC SI FLON REOUIRED TO MAINTAIN FULL OONNCOMER, 20 40 60 80 100 120 TIM:AFTER RUPTURE, SECONDS
l
~
Ml V
Vy t