June 16, 1988 Docket Nos.:
and 50-528, 50-529 50-530
'r.
E. E.
Van Brunt, Jr.
Executive Vice President Arizona Nuclear Power Project
- Post Office Box 52034 Phoenix, Arizona 85072-2034
Dear Mr. Van Brunt:
SUBJECT:
GENERIC LETTER 88-03, "STEAN BINDING OF AUXILIARY FEEDWATER PUMPS (TAC NOS.
- 67256, 67257 AND 67258)
On February 17, 1988, Generic Letter 88-03 was issued and requested all licensees of operating PWRs and holders of construction permits for PWRs to confirm that appropriate procedures are in place, and vill be maintained to minimize the occurrence of steam binding of the auxiliary feedwater (AFW pumps.
The procedures require monitoring fluid conditions within the AFW system each shift during times when the system is required to be operable, and recognizing steam binding and restoring the AFW system to operable status should steam.binding occur.
Your response, dated May 27, 1988, confirmed that you have in place, and will maintain, the necessary procedures.
Thus, your response to Generic Letter 88-03 is satisfactory and no further action is necessary.
Sincerely, ORIGINAL SIGNED BY MIC. AEL J.
DAVIS Michael J. Davis, Project Manager Project Directorate V
Division of Reactor Projects - III, IV, V and Special Projects 0
C DISTRIBUTION
--NRC 5:Local PDR PDV 'Reading DCrutchfield MJDavis D
P P
~
OGC EJordan JPartlow ACRS (10)
NAME :MJDavis:CW.
PGW DATE:6/
/88
- 6/
ton
/88 OFFICIAL,RECORD COPY 880b290280 o
5>8 I J
~ '
<l~
~P,it Rfctr,
~
(4 dp
~4 0
so s
ts C
O
.C
+n +a**+
UNITED STATES
.NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 June l6, 1988 Docket Nos..:
50-528, 50-529 and 50-530 Mr. E.
E.
Van Brunt, Jr.
Executive Vice President Arizona Nuclear.
Power 'Project Post Office Box 52034 Phoenix, Arizona 85072-2034
Dear Mr. Van Brunt:
SUBJECT:
'GENERIC LETTER 88-03, "STEAM BINDING OF AUXILIARY FEEDWATER PUMPS (TAC.NOS.
- 67256, 67257.
AND 67258)
On February 17, 1988, Generic Letter:88-03 was issued and requested all licensees of operating PWRs and hol'ders of construction permits for PWRs to confirm that appropriate procedures are, in. place, and will be maintained to minimize the occurrence of steam binding of the auxiliary feedwater (AFW pumps.
The procedures.
require monitorino f'luid conditions within the AFW system each shift.,during times when the system is required to be operab.1e, and recognizing steam binding and restoring the AFW system to operable status should steam binding occur.
'Your response, dated.May 27,
- 1988, confirmed that you have in place, and will
- maintain, the necessary.
procedures.
Thus, your response to Generic Letter 88-03 is satisfactory and no further action is necessary.,
S in cere ly, Michael J.
Davis Project Manager Project Directorate V
Division of Reactor Projects - III, IV, V and Special Projects:
il i>
V
Hr. E. E.,Van Brunt, Jr.
Arizona Nuclear Power Project Palo Verde CC:
Arthur C. Gehr, Esq.
Snell' Wilmer 3100 Valley Center Phoenix, Arizona 85073 Mr. James H. Flenner, Chief Counsel Arizona Corporation Commission 1200 West Washington
- Phoenix, Arizona 85007 Charles R. Kocher, Esq. Assistant Council James A. Boeletto, Esq.
Southern California Edison Company P., 0.
Box 800
- Rosemead, California 91770 Mr. Mark G'insberg Energy Director Office of Economic Planning and Development 1700 West Washington -,5th Floor Phoenix, Arizona 85007 Mr. Wayne, Shirley Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Mr. Tim Polich U.S. Nuclear Regulatory Commission P. 0.
Box 97 - Palo Verde
- Tonopah, Arizona 85354-0097'egional Administrator, Region V
U. S. Nuclear Regulatory Commission 1450 Maria Lane
,Suite 210 Walnut Creek, California
.94596 Ms. Lynn Bernabei
'Government Accountability Project of the Institute for Policy Studies 1901 gue.Street, NW Washington, DC 20009 Mr. Charles.'B.
Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.
7910 Woodmont Avenue Suite 1310
- Bethesda, Maryland 20814
4l C~
~.
Arizona Nuclear Power.Project Palo Verde CC:
Chairman Ar'izona Corporation Commission Post Office Box 6019 Phoenix, Arizona 85003 Arizona Radiation, Regulatory Agency ATTN:
Ms. Clara Palovic, Librarian 4814 South 40 Street Phoenix, Arizona 85040 Mr. Charles Tedford, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, Arizona 85040 Chairman Maricopa County Board of Supervisors 111 South Third Avenue
- Phoenix, Arizona 85003
ii 0
~a
June 9, l988 DISTRIBUTION Docket Pi1e PDR LPDR PD5 Mg JLee DOCKET NO(S).
STg 5g>>528/529/530 Yard Ee Eo Van Brunt~ Jr+
Executive. Vice Preaident Arizona Huc1ear Pover Pro/oct P
0 Box 52034 L
Pho~~ Arizona 85072-.2034
SUBJECT:
ARIZ'PUBLIC SERVICE COMAmr, PT AL PALO VERDE MUCLZAR GEHHRATXHG STATION~ IXTS 1~ 2 6 3 The following documents concerning our 'review of the subject facility are transmitted for your information'otice of Receipt of Application, dated Draft/Final Environmental Statement, dated Q Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report-, or Supplement No.
dated Environmental Assessment and Finding of No Significant Impact, dated
+ Notice of Consideration of'Issuance of Facility Operating License or Amendment to Facility Operating License, dated
+ Bi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No Sigifi H*d<<!1 i
.d d~l
('Pl Exemption, dated Construction Permit No. CPPR-,
'~d~ent No.
dated
+ Facility Operating License No.,
Amendment No.
dated Order Extending Construction Completion Date, dated Monthly Operating Report for transmitted by letter dated Annual/Semi-Annual Report-transmitted by letter: dated
Enclosures:
As stated cc:
Sea-next papa Office of Nuclear Reactor Regulation DRSP/PD5 JLee 6/9/88
4
'P P. P.
4 I<<
I.V F
t.
FPP I th P
~
I F
~g llE0y
~4
~o
~y I
0 C
Og Gp V/+~
gO
+a*++
UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 June 9, 1988 DOCKET NO(S).
STN 50-528/529/530 Mr. E. E. Van Brunt, Jr.
Executive Vice President Arizona Nuclear. Power Project P. 0. Box 52034 Phoenix, Arizona 85072-2034
SUBJECT:
ARIZONA PUBLIC SERVICE: COMP~,
ET AL PALO VERDE NUCLEAR GENERATING STATION, UNITS l, 2
& 3 The following documents concerning our review of the subject facility are transmitted for your information.
Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.
dated.
Environmental Assessment and Finding of No Significant Impact, dated Notice of Consideration of Issuance of Facility Operatinq License or Amendment to Facility Operating License, dated x
Bi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No B ii H*
4 C
id i
. d~f t/7 Exemption, dated I~ Construction Permit No.
CPPR-
, Amendment No.
dated Facility Operating License No.
, Amendment No.
dated Order Extending Construction Completion Date, dated Monthly Operating Report for transmitted by letter dated Annual/Semi-Annual Report-transmitted by letter dated
Enclosures:
As stated Office of Nuclear Reactor Regulation cc:
See next page
INI
(
Mr. E. E.
Van Brunt, Jr.
Arizona Nuclear Power Pro'ect Palo Verde CC:
Arthur C. Gehr, Esq.
Snell 5 Wilmer 3100 Valley Center Phoenix, Arizona 85073 Mr. James M. Flenner, Chief Counsel Arizona Corpora'tion Commission 1200 West Washington Phoenix, Arizona 85007 Charles R. Kocher, Esq. Assistant Council James A. Boeletto, Esq.
Souther n Ca 1 iforni a Edi son Company P. 0.
Box 800
- Rosemead, California 91770 Hr. Hark Ginsberg Energy Director Office of Economic Planning and Development 1700 West Washington - 5th Floor Phoenix, Arizona 85007 Mr. Wayne Shirley Assistant Attorney General Bataan Memorial Building Santa Fe,,
New Mexico 87503 Hr. Tim Polich U.S. Nuclear Regulatory Commission P. 0.
Box 97 - 'Palo Verde
- Tonopah, Arizona 85354-0097 1
Regional Administrator, Region V'.
S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Ms. Lynn Bernabei Government Accountability Project of the Institute for Policy Studies 1901 gue Street, XW Washington, DC 20009 Mr. Charles B. Brinkman, Manager
.Washington Nuclear Operations Combustion Engineering, Inc.
7910 Woodmont Avenue Suite 1310
- Bethesda, Maryland 20814
INI
~Hi U
Arizona Nuclear Power Project Palo Verde CC:
Chairman Arizona Corporation Commission Post Office Box 6019 Phoenix, Arizona 85003 Arizona Radiation Regulatory Agency ATTN:
Ms. Clara Palovic,.Librar~n 4814 South 40 Street Phoenix, Arizona 85040 Mr. Charles Tedford, Directo~
Arizona Radiation.Regulatory Agency 4814 South 40 Street Phoenix, Arizona 85040 Chairman Haricopa County Board of Supervisors ill South Third Avenue Phoenix,.Arizona 85003
III cH~
I-