Text
ACCELERATED
DISI'RIBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
'CESSION NBR:8804190162
DOC.DATE
88/04/01
NOTARIZED: NO
DOCKET
FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi
05000528
STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi
05000529
STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi
05000530
AUTH.NAME
AUTHOR AFFILIATION
KIRSCH,D.F.
Region 5, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
VAN BRUNT,E.E.
Arizona Nuclear Power Project (formerly Arizona Public Serv
SUBJECT:
Forwards Insp Repts 50-528/88-02,50-529/88-02
& 50-530/88-02
on 880117-0305.Enforcement
action subj of separate ltr.
I
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
D
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:Standardized
plant.
Standardized
plant.
Standardized
plant.
RECIPIENT
ID CODE/NAME
PD5
DAVIS,M
INTERNAL: ACRS
DEDRO
NRR/DLPQ/PEB 11
NRR/DOEA DIR ll
NRR/DREP/RPB
10
NRR/PMAS/ILRB12
OGC 15-B-18
RES/DRPS
DIR
EXTERNAL: LPDR
NOTES
COPIES
LTTR ENCL
1
1
2
2
2
2
1
1
1
1
1
1
2
2
1
1
1
1
1
'
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
LICITRA,E
NRR MORISSEAU,D
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
0
IEBE
,J
EG
LE
02
RGN5
FILE
01
NRC PDR
COPIES
LTTR ENCL
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
S
05000528
05000529 j
05000530'
D
S
A
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
27
ENCL
27
AP~
- i 1988
EA 88-62
Docket Nos.
50-528
50-529
50-530
Arizona Nuclear
Power Project
P.
0.
Box 52034
Phoenix,
85072-2034
Attention:
Mr.
E.
E.
Van Brunt Jr.,
Executive Vice President
Gentlemen:
Subject:
NRC Inspection of Palo Verde Uqits 1,
2 and 3.
This refers to the inspection
conducted
by Messrs.
T. Polich, J. Ball,
G. Fiorelli, and J. Melfi, of this office, on January
17 through March 5,
1988, of activities authorized
by
NRC License
Nos.
and to the discussion of our findings held with members of your staff at the
conclusion of the inspection.
Areas
examined during this inspection are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
Based
on the results of this inspection, it appears
that several
of your
activities were not conducted
in full compliance with NRC requirements.
Although these violations were identified by your staff, in each
case multiple
opportunities existed for your staff to take action to prevent the violation
prior to the violation occurring.
The recent
increased
frequency of these
type events
appears
to be indicative of your personnel
not fully understanding
the level of attention to detail
expected
by your managers.
Enforcement
action concerning
these violations will be the subject of separate
correspondence.
Your attention is also directed to paragraphs
7 and 10 of the enclosed
report.
As discussed
at our management
meeting
on February
29, 1988,
we are concerned
with the poor foreign material
exclusion practices
which led up to the stuck
control element
assembly
event.
Our concern
has since incr eased
in learning
that the failure of a multi-stud tensioner caster,
which resulted in the
release
of numerous ball bearings to the containment floor, was not brought to
your attention at the time of the caster failure, or during your initial
review of the stuck control element
assembly.
Paragraph
10 describes
our observation that operations
personnel
in the Unit 2
control
room were not resetting 'cleared annunciators
in a timely manner.
This
SS04i90i62
SS040i
ADOCK 05000528
9
-2-
I
1988
practice
has apparently
developed 'in part due to the relatively large
number
of inappropriately lighted annunciators.
As we have discussed
in several
meetings,
the reduction of these
inappropriately lighted annunciators
appears
to be an important step
towards ensuring
a prompt, thorough
response
to valid
alarms.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be pleased
to discuss
them with you.
Sincerely,
Dehhis F:"Kirsch, Director
Division of Reactor Safety
and 'Projects
Enclosure:
Inspection
Report Nos. 50-528/88-02,
50-529/88-02
and 50-530/88-02.
cc w/enclosure:
J.
G. Haynes,
Vice President,
Nuclear Production
W. F. Quinn, Manager,
Licensing
T.
D. Shriver, Manager,
Compliance
L. G. Papworth, Director, Quality Assurance
L. Souza,
Manager, Quality Audits 5 Monitoring
J. Kirby, Director, Site Services
Arthur C. Gehr,
Esq.
Ms. J. Morrison
Ms. L. Bernabei,
GAP
T. Hogan,
ACC
bcc w/enclosure:
docket file
G.
Cook
B. Faulkenberry
J. Martin
Resident
Inspector
Project Inspector
D. Persinko,
J.
Lieberman,
L. Chandler,
F. Mirgalia,
bcc w/o enclosure
B:
LFMB
M. Smith
-3-
'REGION V/noack S~
JBall
GFiorelli
2/ I /88
3/
) /88
TPol ich
1/ I/88
JMel fs
g/ r/88
~g~
SRichards
g/ i/88
REQUEST
Y ] REQUEST
PY ]
VEST COPY ]
R
UEST
COPY ]
R
VEST
COPY ]
YES /
NO
YES /
0
ES /
NO
/
NO
S /
NO
RPate
qhG
OKi As
h
8/ l /88
3'/
( /88
EST
COPY ]
UEST
COPY ]
ES /
NO
YES /
NO
S
TO
]
ES /
NO