Forwards Insp Repts 50-528/88-02,50-529/88-02 & 50-530/88-02 on 880117-0305.Enforcement Action Re Violations Will Be Subj of Separate Ltr
ML17303B037
Person / Time
Site: Palo Verde  
Issue date: 04/01/1988
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17303B038 List:
References
NUDOCS 8804190162
Download: ML17303B037 (6)


See also: IR 05000528/1988002

Text

ACCELERATED

DISI'RIBUTION

DEMONSTRATION

SYSTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

'CESSION NBR:8804190162

DOC.DATE

88/04/01

NOTARIZED: NO

DOCKET

FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi

05000528

STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi

05000529

STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi

05000530

AUTH.NAME

AUTHOR AFFILIATION

KIRSCH,D.F.

Region 5, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

VAN BRUNT,E.E.

Arizona Nuclear Power Project (formerly Arizona Public Serv

SUBJECT:

Forwards Insp Repts 50-528/88-02,50-529/88-02

& 50-530/88-02

on 880117-0305.Enforcement

action subj of separate ltr.

I

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE:

D

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:Standardized

plant.

Standardized

plant.

Standardized

plant.

RECIPIENT

ID CODE/NAME

PD5

PD

DAVIS,M

INTERNAL: ACRS

DEDRO

NRR/DLPQ/PEB 11

NRR/DOEA DIR ll

NRR/DREP/RPB

10

NRR/PMAS/ILRB12

OGC 15-B-18

RES/DRPS

DIR

EXTERNAL: LPDR

NSIC

NOTES

COPIES

LTTR ENCL

1

1

2

2

2

2

1

1

1

1

1

1

2

2

1

1

1

1

1

'

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

LICITRA,E

AEOD

NRR MORISSEAU,D

NRR/DLPQ/QAB 10

NRR/DREP/EPB

10

NRR/DRIS DIR 9A

0

IEBE

,J

EG

LE

02

RGN5

FILE

01

NRC PDR

COPIES

LTTR ENCL

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

S

05000528

05000529 j

05000530'

D

S

A

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

27

ENCL

27

AP~

- i 1988

EA 88-62

Docket Nos.

50-528

50-529

50-530

Arizona Nuclear

Power Project

P.

0.

Box 52034

Phoenix,

Arizona

85072-2034

Attention:

Mr.

E.

E.

Van Brunt Jr.,

Executive Vice President

Gentlemen:

Subject:

NRC Inspection of Palo Verde Uqits 1,

2 and 3.

This refers to the inspection

conducted

by Messrs.

T. Polich, J. Ball,

G. Fiorelli, and J. Melfi, of this office, on January

17 through March 5,

1988, of activities authorized

by

NRC License

Nos.

NPF-41,

NPF-51 and NPF-74,

and to the discussion of our findings held with members of your staff at the

conclusion of the inspection.

Areas

examined during this inspection are described

in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

Based

on the results of this inspection, it appears

that several

of your

activities were not conducted

in full compliance with NRC requirements.

Although these violations were identified by your staff, in each

case multiple

opportunities existed for your staff to take action to prevent the violation

prior to the violation occurring.

The recent

increased

frequency of these

type events

appears

to be indicative of your personnel

not fully understanding

the level of attention to detail

expected

by your managers.

Enforcement

action concerning

these violations will be the subject of separate

correspondence.

Your attention is also directed to paragraphs

7 and 10 of the enclosed

report.

As discussed

at our management

meeting

on February

29, 1988,

we are concerned

with the poor foreign material

exclusion practices

which led up to the stuck

control element

assembly

event.

Our concern

has since incr eased

in learning

that the failure of a multi-stud tensioner caster,

which resulted in the

release

of numerous ball bearings to the containment floor, was not brought to

your attention at the time of the caster failure, or during your initial

review of the stuck control element

assembly.

Paragraph

10 describes

our observation that operations

personnel

in the Unit 2

control

room were not resetting 'cleared annunciators

in a timely manner.

This

SS04i90i62

SS040i

PDR

ADOCK 05000528

9

DCD

-2-

I

1988

practice

has apparently

developed 'in part due to the relatively large

number

of inappropriately lighted annunciators.

As we have discussed

in several

meetings,

the reduction of these

inappropriately lighted annunciators

appears

to be an important step

towards ensuring

a prompt, thorough

response

to valid

alarms.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Dehhis F:"Kirsch, Director

Division of Reactor Safety

and 'Projects

Enclosure:

Inspection

Report Nos. 50-528/88-02,

50-529/88-02

and 50-530/88-02.

cc w/enclosure:

J.

G. Haynes,

Vice President,

Nuclear Production

W. F. Quinn, Manager,

Licensing

T.

D. Shriver, Manager,

Compliance

L. G. Papworth, Director, Quality Assurance

L. Souza,

Manager, Quality Audits 5 Monitoring

J. Kirby, Director, Site Services

Arthur C. Gehr,

Esq.

Ms. J. Morrison

Ms. L. Bernabei,

GAP

T. Hogan,

ACC

bcc w/enclosure:

docket file

G.

Cook

B. Faulkenberry

J. Martin

Resident

Inspector

Project Inspector

D. Persinko,

NRR

J.

Lieberman,

OE

L. Chandler,

OGC

F. Mirgalia,

NRR

bcc w/o enclosure

B:

LFMB

M. Smith

-3-

'REGION V/noack S~

JBall

GFiorelli

2/ I /88

3/

) /88

TPol ich

1/ I/88

JMel fs

g/ r/88

~g~

SRichards

g/ i/88

REQUEST

Y ] REQUEST

PY ]

VEST COPY ]

R

UEST

COPY ]

R

VEST

COPY ]

YES /

NO

YES /

0

ES /

NO

/

NO

S /

NO

RPate

qhG

OKi As

h

8/ l /88

3'/

( /88

EST

COPY ]

UEST

COPY ]

ES /

NO

YES /

NO

S

TO

PDR

]

ES /

NO