Informs That Util 870820 Plan for Control Element Assembly Guide Tube Wear Insp Program Acceptable & Implementation of Program May Proceed.Rept Evaluating Final Insp Results Requested
ML17303A732
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/12/1988
From: Licitra E
Office of Nuclear Reactor Regulation
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
NUDOCS 8801190216
Download: ML17303A732 (4)


Text

g1 Docket No.:

50-529 iI Mr. E.

E.

Van Brunt, Jr.

Executive Vice President Arizona Nuclear Power Plant Post Office Box 52034 Phoenix, Arizona 85072-2034

Dear Mr. Van Brunt:

SUBJECT:

PALO VERDE, UNIT 2 - CEA GUIDE TUBE WEAR INSPECTION PROGRAM By letter dated August 20, 1987, you provided the details of the planned CEA Guide Tube Wear Inspection Program for Palo Verde Unit 2.

We have completed our review of the subject program.

Based on that review, we conclude that the sample size, selection method and test methodology presented in the program provide an acceptable basis for conducting such an inspection.

Therefor e, implementation of the program can proceed.

At the conclusion of the inspection, we request that you provide us with a report which includes your evaluation of the final results.

If you have any questions regarding this letter, please let me know.

Sincerely, original signed by cc:

See next page E. A. Licitra, Senior Project Manager Project Directorate V

Division of Reactor Projects - III, IV, V and Special Projects DISTRIBUTION HRC 5 LPDRs'DV Plant file JLee EALicitra MDavis SWU GHolahan EJordan JPar tlow ACRS (10)

UFC=:IHE

~

&WW W W

~

&WWO W W&l NAME :EALicitra:CW GW ton 0

WI

~ W DATE:01/I 88:01/ V 88 OFFICIAL RECORD COPY

~

~

~

~

880i i902i6'80ii>

PDR ADQCK 05000529 Q

PDR

l

Hr.

E.

E.

Van Brunt, Jr.

Arizona Nuclear Power Project Palo Verde CC; Arthur C. Gehr, Esq.

Snell f Milmer 3100 Valley Center Phoenix, Arizona 85073 Nr. James M. Flenner, Chief Counsel Arizona Corporation Commission 1200 West Washington Phoenix, Arizona 85007 Charles R. Kocher, Esq. Assistant Council James A. Boeletto, Esq.

Southern California Edison Company P. 0.

Box 800

Rosemead, California 91770 Nr. Nark Ginsberg Energy Director Office of Economic Planning and Development 1700 West Washington - 5th Floor Phoenix, Arizona 85007 Mr. Mayne Shirley Assistant Attorney General Bataan Hemorial Building Santa Fe, New Mexico 87503 Nr. Jay Ball U.S. Nuclear Regulatory Commission P. 0.

Box 97

Tonopah, Arizona 85354-0097 Regional Administrator, Region V

U. S. Nuclear Regulatory Commission 1450 Naria Lane Suite 210 Walnut Creek, California 94596 Kenneth Berlin, Esq.

Winston 5 Strawn Suite 500 2550 N Street, NM Washington, DC 20037 Ns.

Lynne Bernabei Government Accountability Project of the Institute for Policy Studies 1901 gue Street, NW Washington, DC 20009 Hr.

Ron Rayner P. 0.

Box 1509

Goodyear, AZ 85338 Nr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.

7910 Woodmont Avenue Suite 1310

Bethesda, Maryland 20814

/'

't l:

g