Amended Pages to Monthly Operating Rept for Nov 1987
ML17303A729
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/30/1987
From: Coleville J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17303A728 List:
References
NUDOCS 8801140067
Download: ML17303A729 (6)


Text

NR~MONTHLY OPERATING REPORT DOCKET NO. 50-530 UNIT NAME PVNGS-3 DATE 12/20/87 COMPLETED BY J.M. Colville TELEPHONE 602-393-2679 OPERATING STATUS Unit Name. Palo Verde Nuclear Generating Station~ Unit 3

2. Reporting Period: November 1987 3~ Licensed Thermal Power (NMt): 3800 4~ Nameplate Rating (Gross MMe): 1403 5~ Design Electrical Rating (Net MWe): 1270
6. Naximum Dependable Capacity (Gross NMe): 1303 7~ Naximum Dependable Capacity (Net MMe): -

1221

8. If Changes Occur Xn Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons.

9. Power Level to Mhich Restricted, Xf Any (Net NVe): 'ONE
10. Reasons For Restrictions, If Any.

This Month Yr.-to-Date Cumulative 11- Hours in Reporting Pex io 720 5304 5304 12 Number of Hours Reactor Mas Critical, 171.1 268.9 268.9 Reactor Reserve Shutdown

'3.

Hours

14. Hours Generator On-Line 14. 14.1
15. Unit Reserve Shutdown Hours
16. Gxoss Thermal Energy Generated (MMH) 51802 51802 1802 17 Gross Electrical Energy Generated (MMH) 1200 1200 1200 Net Electrical Energy

'8.

Generated (MMH) 0 0

19. Unit, Service Factor
20. Unit Availability Factor
21. Un'it Capacity Factor (Using MDC Net) 0 22 Unit Capacity Factor (Using DER Net) 0 0
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Du ration of Each):
25. If Shutdown At End of Report Period, Estimated Date of Startup.
26. Units in Test Status (Prior To Commercial Operation):

Forecast Achieved XNXTXAL CRITICALITY 07/87 10/25/87 INITIAL ELECTRICITY 07/87 11/28/87 CONMERCIAL OPERATION 09/87 8801140067 880108I PDR ADOCK 05000529 R" PD~

/r

/C

'll d

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-529 UNXT NAME PVNGS-2 DATE 12/20/87 COMPLETED BY J.M. Colville TELEPHONE 602-393-2679 OPERATING STATUS H

1 ~ Unit Name. Palo Verde Nuclear Generating StationL Unit 2 2~ Reporting Period: November 1987 3~ Licensed Thermal Power (MVt): 3800 4~ Nameplate Rating (Gross N'hie): 1403

5. Design Electrical Rating (Net MMe): 1270
6. Maximum Dependable Capacity (Gross NMe): 1303 7 Naximum Dependable Capacity (Net NMe): 1221
8. If Changes Occur In Capacity Rat.ings (Items Number Since Last. Report, Give Reasons:

3 Through 7) l

9. Power Level to Which Restricted, If Any (Net MMe): NONE
10. Reasons For Restrictions, Xf Any'.

This Month Yr.-to-Date Cumulative 11 Hours in Reporting Period 720 8016 10512

2.

Number'f Hours React, or Vas Critical 657LS 6 L241.2 ~ 8 L531.1 w 13 Reactor Reserve Shutdown Hours 0 0

14. Hours Generator On-Line 644.1" 6 115.2 8 L382.2
15. Unit Reserve Shutdown Hours 0
16. Gross Thermal Energy

, Generated (MPH) 2 400 L712 ' 22 L 112 L841. 30L407L847

17. Gross Electrical Energy Generated (NMH) 843 900. 7 L746 100. 10L674L270
18. Net Electrical Energy Generated (NMH) 792L875. 7 L256 L846. 10L003L684
19. Unit Service Factor 89. Sr. 7CL3;C 79.7.'c
20. Unit Avai labilitY Factor 89.5~ 76. 3'c 79. 7'c 21 Unit Capacity Factor

'2 (Usin g NDC Net) 90.2e 74. 1'l: 77 9o~

~ ~ Unit Capacity Factor (Usin g DER Net) 86. 7r. 71 . 3.c 74. 9:<

23 ~ Unit Forced Outage Rate 5L2< 6. 44< ~

7L2<

24. Shutdowns Scheduled Over Next' Months (Type, Date, and Duration of Each): Scheduled Date for next Refueling Shutdown -2/21/88 Duration of refuelina shutdown approximately 68 days
25. 'If Shutdown At End of Report Period Estimated Date'of Startup.
26. Units in Test Status (Prior To Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 3/86 4/18/86 INITIAL ELECTRICITY 6/86 5/20/8S CONNERCXAL-OPERATION 11/86 9/19/8S

4 h

ff If I

I I

hi h

4 I

h I ~

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO: 5O-529

. P2WIU THLEPJ ION E: 6~9~579 Hethod of Cause and Corrective Duration Shutting System Component Action to No. Date Type .llours Reason Down Reactor LHR NO. Code Code Prevent Recurrence 15 11/21 S 40.6 B N/A N/A N/A Commenced planned shutdown for maintenance to repair failed Reactor Coolant Pump speed sensor for the Channel B and D Core Protection Calculators.

16 11/22 F 35.3 A, F 2-87-019 JD CPU Reactor trip with reactor power at 7X. Lo DNBR was first out due to auxiliary trip on Axial Shape Index.

4 I F-Forced 2 Method: Exhibit F Instructions Reason: for Preparation of Data h-Equi pleat Failure (Explain) 1-Manual S-Scheduled Entry Sheets for Liccnsce 0-Maintcnancc or Test 2-Manual Serala 3-Automatic Scram Event Rcport (LER) File-C-Refueling (NUREG 0161)

D-ReRulatory Restriction 4-Continuation from E-Opcrntor Training II License Examination Previous Month F-hdninlstrntive 5-Rcdnction of 20X 5 Exhibit II-Socle Source G-Opcratlonnl Error (Fxplnin) or Grcatcr in the

.II-Other (Explain) Past 24 llours

<-Ol hr r (I'.xnlnln)

4