NR~MONTHLY OPERATING REPORT DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE 50-530 PVNGS-3 12/20/87 J.M. Colville 602-393-2679 OPERATING STATUS 2.
3 ~
4 ~
5 ~
6.
7 ~8.
9.
10.
Unit Name.
Palo Verde Nuclear Generating Station~ Unit 3 Reporting Period:
November 1987 Licensed Thermal Power (NMt): 3800 Nameplate Rating (Gross MMe): 1403 Design Electrical Rating (Net MWe):
1270 Naximum Dependable Capacity (Gross NMe): 1303 Naximum Dependable Capacity (Net MMe):
1221 If Changes Occur Xn Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons.
Power Level to Mhich Restricted, Xf Any (Net NVe): 'ONE Reasons For Restrictions, If Any.
This Month Yr.-to-Date Cumulative 11-12
'3.
14.
15.
16.
17
'8.
19.
20.
21.
22 23.
24.
Hours in Reporting Pex io Number of Hours Reactor Mas Critical, Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gxoss Thermal Energy Generated (MMH)
Gross Electrical Energy Generated (MMH)
Net Electrical Energy Generated (MMH)
Unit, Service Factor Unit Availability Factor Un'it Capacity Factor (Using MDC Net)
Unit Capacity Factor (Using DER Net)
Unit Forced Outage Rate Shutdowns Scheduled Over of Each):
720 5304 171.1 268.9 14.
51802 51802 1200 1200 0
0 0
0 Next 6 Months (Type, Date, 5304 268.9 14.1 1802 1200 0
ration and Du
- 25. If Shutdown At End of Report Period, Estimated Date of Startup.
26.
Units in Test Status (Prior To Commercial Operation):
XNXTXAL CRITICALITY INITIAL ELECTRICITY CONMERCIAL OPERATION Forecast 07/87 07/87 09/87 Achieved 10/25/87 11/28/87 8801140067 880108I PDR ADOCK 05000529 R"
PD~
/r
/C
'll d
NRC MONTHLY OPERATING REPORT DOCKET NO.
UNXT NAME DATE COMPLETED BY TELEPHONE 50-529 PVNGS-2 12/20/87 J.M. Colville 602-393-2679 OPERATING STATUS 1 ~
2 ~
3 ~
4 ~
5.
6.
7 8.
9.
10.
H Unit Name.
Palo Verde Nuclear Generating StationL Unit 2 Reporting Period:
November 1987 Licensed Thermal Power (MVt): 3800 Nameplate Rating (Gross N'hie):
1403 Design Electrical Rating (Net MMe):
1270 Maximum Dependable Capacity (Gross NMe): 1303 Naximum Dependable Capacity (Net NMe):
1221 If Changes Occur In Capacity Rat.ings (Items Number 3 Through 7)
Since Last. Report, Give Reasons:
l Power Level to Which Restricted, If Any (Net MMe):
NONE Reasons For Restrictions, Xf Any'.
This Month Yr.-to-Date Cumulative 11
2.
13 14.
15.
16.
17.
Hours in Reporting Period Number'f Hours React, or Vas Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy
, Generated (MPH)
Gross Electrical Energy 720 657LS 0
644.1" 2 400 712 '
L 8016 6 241.2 L
~
6 115.2 22 112 841.
L L
10512 8 531.1 L
w 0
8 382.2 L
0 30L407L847 Generated (NMH) 18.
Net Electrical Energy 843 900.
7 746 100.
L 10L674L270 19.
20.
21
'2
~
23 ~
24.
25.
792L875.
- 89. Sr.
89.5~
L L
7 256 846.
79.7.'c
- 76. 3'c 77 9o~
of Each):
Scheduled Date for next Refueling Shutdown -2/21/88 Duration of refuelina shutdown approximately 68 days
'If Shutdown At End of Report Period Estimated Date'of Startup.
Generated (NMH) 10L003L684 Unit Service Factor 7CL3;C Unit Availabilit Factor Y
- 79. 7'c Unit Capacity Factor (Usin NDC Net) g 90.2e
- 74. 1'l:
~ Unit Capacity Factor (Usin DER Net) g
- 86. 7r.
71. 3.c
- 74. 9:<
Unit Forced Outage Rate 5L2<
- 6. 44<
~
7L2<
Shutdowns Scheduled Over Next' Months (Type, Date, and Duration 26.
Units in Test Status (Prior To Commercial Operation):
INITIALCRITICALITY INITIAL ELECTRICITY CONNERCXAL-OPERATION Forecast 3/86 6/86 11/86 Achieved 4/18/86 5/20/8S 9/19/8S
4 h
ff If I
I I
hi I
h 4
h I
~
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO: 5O-529
. P2WIU THLEPJ IONE: 6~9~579 Hethod of Duration Shutting System Component No.
Date Type
.llours Reason Down Reactor LHR NO.
Code Code Cause and Corrective Action to Prevent Recurrence 15 11/21 S
40.6 B
N/A N/A N/A Commenced planned shutdown for maintenance to repair failed Reactor Coolant Pump speed sensor for the Channel B and D Core Protection Calculators.
16 11/22 F
35.3 A, F 2-87-019 JD CPU Reactor trip with reactor power at 7X.
Lo DNBR was first out due to auxiliary trip on Axial Shape Index.
I F-Forced S-Scheduled 2 Reason:
h-Equi pleat Failure (Explain) 0-Maintcnancc or Test C-Refueling D-ReRulatory Restriction E-Opcrntor Training II License Examination F-hdninlstrntive G-Opcratlonnl Error (Fxplnin)
.II-Other (Explain)
Method:
1-Manual 2-Manual Serala 3-Automatic Scram 4-Continuation from Previous Month 5-Rcdnction of 20X or Grcatcr in the Past 24 llours
<-Ol hr r (I'.xnlnln) 4 Exhibit F Instructions for Preparation of Data Entry Sheets for Liccnsce Event Rcport (LER) File-(NUREG 0161) 5 Exhibit II-Socle Source