ML17303A521
| ML17303A521 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 07/29/1987 |
| From: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Haynes J ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| References | |
| NUDOCS 8708050288 | |
| Download: ML17303A521 (2) | |
Text
REGULATORY INFORMATION DISTRIBUTI
<~ SYSTEM (RIDS)
DOCKET 0 05000528 05000529 05000530
SUBJECT:
Advises that 870525 changes to operational GA program in FSAR Section i. 8 acceptable.
DISTRIBUTION CODE:
IE01D COPIES RECEIVED: LTR
~
ENCL ~
SIZE:
/
TITLE: ('eneral (50 Dkt)-Insp Rept/Notice of Violation Response ACCESSION NBR: 8708050288 DOC. DATE: 87/07/2'P 'OTARIZED:
NO FACIL:STN-50-528 Palo Verde Nuclear Stationi Unit li Arizona Publi STN-50-529 Palo Verde Nuclear Stationi Unit 2i Arizona Pub li STN-50-530 Palo Verde Nuclear Stations Unit 3i Arizona Publi AUTH. NAME AUTHOR AFFILIATION KIRSCHz D. F.
Region Si Office of Director REC IP. NAME RECIPIENT AFFILIATION HAYNES> J. Q.
Arizona Nuclear Poeer Prospect (formerly Arizona Public Serv NOTES: Standardized plant. M. Davisi NRR: iCg.
Standardi zed plant. M. Davisi NRR: iCg.
Standardi zed plant. M. Davisi NRR: iCg.
05000528 05000529 05000530 REC IP IENT ID CODE/NAME PD5 PD DAVIS' INTERNAL: ACRS DEDRO NRR/DOEA DIR NRR/DREP/RPB NRR/PMAS/ILRB QGC/HDS1 RES DEPY QI EXTERNAL:
LPDR NSIC COPIES LTTR ENCL 2
1 1
2 1
1 1
1 1
1 RECIPIENT ID CODE/NAME LICITRAiE AEOD NRR MORISSEAUi D NRR/DREP/EPB NRR/DRIS DIR OE O'I'EBER ANi J
('
LE R
FILE 01 NRC PDR CQF'IES LTTR ENCL 1
1 1
1 1
1 1
NOTES:
TOTAL NUMBER OF COPIES REQUIRED'TTR 25 ENCL ~5
July 29, 1987 Arizona Nuclear Power Project P. 0.
Box 52034 Phoenix, Arizona 85072-2034 Attention:
Mr. J.
G. Haynes, Vice President Nuclear Production
SUBJECT:
ACCEPTANCE OF CHANGES TO THE OPERATIONAL EQUALITY ASSURANCE PROGRAM FOR PALO VERDE We have reviewed the changes addressed in the proposed change of May 25, 1987 to the PVNGS FSAR Section 1.8 and find that it continues to meet the requirements of 10 CFR 50, Appendix B; therefore, the change is acceptable.
If there are changes to other operative gA commitments existing in docketed correspondence outside of the SAR gA program description you are obligated to notify this office.
Implementing such changes should be based on 10 CFR 50.54(a)(3).
Any questions you may have concerning this review should be directed to W. J.
Wagner of my staff on (415) 943-3731.
Sincerely,
/5/
CC:
J. Spraul, gAB E. Licitra, NRR G. Fiorelli, RV Section Chiefs Branch Chiefs Document Control Desk RV/jk Dennis F. Kirsch, Director Division of Reactor Safety and Projects R
E WAGNER 7/K/8 C
P S
P R
NO YES NO ES NO RICHARDS~ PATER+
7/P/87 7/2f/87 STCP YES 0
S D TO PDR YES NO KIRSCH~