>SS7 Docket Nos.:
50-528, 50-529 and 50-530 Mr. E.
E.
Van Brunt, Jr.
Executive Vice President Arizona Nuclear Power Project Post Office Box 52034 Phoenix, Arizona 85072-2034
Dear Mr. Van Brunt:
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION TO GENERIC LETTER 83-28, ITEM 2.1, Distribution PD5 Plant File GMHolahan JLee EALicitra/MJDavis AToalston/OGC-Bethesda EJordan JPartlow ACRS (10)
- PALO VERDE RESPONSE PART 2 AND ITEM 2.2 In order to complete our review of your responses to Item 2.1, Part 2 and Item 2.2 of Generic Letter 83-28, we require additional information.
The specific information needed is identified in the enclosure.
We ask that you provide the requested information and that within two weeks of receipt of this letter, you inform us of the date when the information will be provided.
If you have any questions regarding this request, please let me know.
The reporting and/or recordkeeping requirements of this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
Sincerely, 0;icinai signed by:
E. A. Licitra E. A. Licitra, Senior Project Manager Project Directorate V
Division of Reactor Projects - III, IV, V and Special Projects
Enclosure:
As stated cc:
See next page
- See previous conc nce
- DRSP/PDV DR
- PDV EALicitra:cd GW n ghton 6/30/87 7/
i /87 OFFICIAL RECORD COPY popo'>>>>~~~~
~
os~a pgp pDQCN, 0>
pgR P
P l(
F
~
~
K
Mr.
E.
E.
Van Brunt, Jr.
Arizona Nuclear Power Project Palo Verde CC:
Arthur C. Gehr, Esq.
Snell
& Wilmer 3100 Valley Center
- Phoenix, Arizona 85073 Mr. James M. Flenner, Chief Counsel Arizona Corporation Commission 1200 West Washington
- Phoenix, Arizona 85007 Charles R. Kocher, Esq. Assistant Council James A. Boeletto, Esq.
Southern California Edison Company P.
0.
Box 800
- Rosemead, Cali fornia 91770 Mr. Mark Ginsberg Energy Director Office of Economic Planning and Development 1700 West Washington - 5th Floor
- Phoenix, Arizona 85007 Kenneth Berlin, Esq.
Winston & Strawn Suite 500 2550 M Street, NW Washington, DC 20037 Ms.
Lynne Bernabei Government Accountability Project of the Institute for Policy Studies 1901 gue Street, NW Washington, DC 20009 Mr.
Ron Rayner P.
0.
Box 1509
- Goodyear, AZ 85338 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.
7910 Woodmont Avenue Suite 1310
- Bethesda, Maryland 20814 Mr. Wayne Shirley Assistant Attorney General Bataan Mi":,orial Building Santa Fe, New Mexico 87503 Mr.
Roy Zimmerman U.S.
Nuclear Regulatory Commission P.
0.
Box 239 Arlington, Arizona 85322 Ms. Patricia Lee Hourihan 6413 S. 26th Street
- Phoenix, Arizona 85040 Regional Administrator, Region V
U.
S.
Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, Californi a 94596
Enclosure Re vest for Additional Information Pa o
er e Units 1, 2 an 3
enenc etter l.
Item 2. 1, Part 2 - Vender Interfaces Your response does not specifically identify CE "Infobulletins" or that return receipts are required for those bulletins.
Provide additional information which addresses whether you receive such bulletins and if return receipts are required.
2.
Item 2.2. 1.3 - Use of the Equipment Classification Listing Your response has not confirmed that cr iteria and procedures exist which govern the use of the information handling system to determine that an activity is safety-related and what procedures apply to safety-related components for maintenance, surveillance, parts replacement and other activities defined in the introduction to 10 CFR 50, Appendix B.
Provide additional information which addresses such criteria and procedures.
3.
Item 2.2.1.4 - Management Controls Your response has not confirmed how management determines that the management controls utilized to verify that the procedures for preparation, validation and routing utilization of the information system have been followed.
Provide additional information which addresses how management makes this determination.