ML17303A377
| ML17303A377 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 03/18/1987 |
| From: | Pate R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17303A378 | List: |
| References | |
| NUDOCS 8704070348 | |
| Download: ML17303A377 (6) | |
See also: IR 05000529/1987008
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR+8704070348
DDC ~ DATEe 87/03/18
NOTARIZEDe
NO
DOCKET
FACIL:STN 50
529 Palo
Verde Nuclear
Station<
Unit 2i Arizona Publi
05000529
~
~
~
~
~
STN 50-530
Palo
Verde Nuclear Station~
Unit 3i Arizona publi
05000530
AUTH+NAME
AUTHDR AFFILIATION
PATEqR ~ J ~
Reaion
Si
Off ice of Director
RECIP.NaME
RECTPIENT
AFF ILIATION
VAN BRUVTiE,E.
Ar izona Nuclear
Power Project
(formerly Ar izona Public
Serv
SUBJECT:
For wards
Insp Repts
50 529/87
08
8 50-530/87
09
on
870223" 26 ~ No
v i o 1 a t i ons noted,
DISTRIBUTION CODE:
IE010
COPIES
RECEIyED:LTR
ENCL
SIZEo
TITLE: General
(50 Dkt)"1nso Rent/Notice
of Violation Response
NOTES! St andardi zed
r
1 ant. M. Dav i s> NRR; 1Cy,
Standardized
olant ~ MD DavisiNRR: 1Cy ~
05000529
05000530
RECIPIENT
lD CODE/NAME
PD5
LA
LICITRA~E
INTERNAL: ACRS
L IEBERMAiV
ROEgM ~ L
NRR/DOEA DIR
NRR/DR IS
DIR
OGC/HDS1
RES SPEISi T
EXTERNAL: LPDR
NOTESt
CDPIES
LTTR ENCL
1
0
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
PD5
DAVIS'
n YLIE
DEDRO
IE/DI/ORPB
NRR/ADT
NRR/DREP/EPB
N
S/ILRB
R
RGN5
F ILE
0 1
NRC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
TOTAL NUMBER
OF
COPIES
REQUIRED:
LTTR
25
ENCL
24
I
t
l
'
Docket Nos.
50-529
and 50-530
Arizona Nuclear
Power Project
P.
0.
Box 52034
Phoenix,
85072-2034
Attention:
Nr.
E.
E.
Van Brunt, Jr.
Executive Vice President
Gentlemen:
Subject:
NRC Inspection of Palo Verde Units
2 and
3
This refers to the unannounced
inspection
conducted
by Nr.
C.
Ramsey of this
office, on February 23-26,
1987, of activities authorized
by
NRC License
No.
NPF-51 and
NRC Construction
Permit
No.
CPPR-143,
and to the discussion of
findings held with members of your staff at the conclusion of the inspection.
Areas
examined during this inspection
are described
in the enclosed
inspection
report.
Within these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records,
inter'views with
personnel,
and observations
by the inspectors.
The primary focus of this
inspection
was
on Unit 3 operational
readiness
for startup with proper
functioning fire protection features protecting safe
shutdown trains.
No= violations with NRC requirements
were identified within the
scope of this
inspection.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be glad to
discuss
them with you.
0l/6cM Gl5N A
Robert J.
Pate,
Chief
Reactor Safety Branch
Enclosure:
Inspection
Report
Nos.
50-529/87-.08
and 50-530/87-09
g18
870+0
DOCy 05000
Ogq8 870
0
@DR
gD
pD
G
1I
I
Arizona Nuclear
Power Project
gp.p 18 f987
cc w/enclosure:
J.
G.
Haynes,
J.
R.
Bynum,
W.
F. quinn,
T.
D. Shriver,
W.
E. Ide,
C.
N.
Russo,
J. Morrison,
PVIF
L. Bernabei,
GAP
T.
Hogan,
ACC
A.
C. Gehr, fsq., Snell
8
Wi lmer
bcc w/enclosure:
Resident
Inspector
Project Inspector
RSB/Document Control
Desk (RIDS) (IE01)
G.
Cook
B. Faulkenberry
J. Martin
docket file
bcc w/o enclosure:
LFMB
M. Smith
REGION V
CRamsey/dot
3/'8'/87
SRichards
3/, v/87
RPa
e
3////87
R
UEST
COPY
VEST
COPY ]
EST
COPY
S /
NO
(YES /
NO
YES /
NO
D TO
]
ES /
NO
]
t
T
I
(
e