ATTACHMENT REPORT ON THE STEAM GENERATOR TUBE LEAK AT PVNGS UNIT 1 Revision 0
February 1987
0
Table of Contents Pa e Number Io Introductionooeooo
~..ooooo..woo...o.oo.oooo....oo..woo.o..oo.o 3
A.
Purpose of Report...............--.---......
3 B.
Description of Event. ~.........--
~ ~.. ~.... ~....... ".. 3 C.
Description of the System 80 Steam Generator.............
4 D.
Development of Inspection Plan...........................
5 II. Results of Steam Generator Inspections........................12 A.
Steam Generator Tube Wear............................ "..12 B.
Dented Steam Generator Tubes.. "..-""."."..""-....12 C.
Indications of Potential Loose Parts.....................13 D.
Sludge Accumulation...."...." "".......".."....."..14 E.
No Tube Explansion................................. "....15 F.
Foreign Residue in Steam Generator Tubes.................15 III. Evaluation of Inspection Findings.....
~.......................28 A.
Steam Generator Tube Wear................................28 B.
Dented Steam Generator Tubes.............................31 C.
Indications of Potential Loose Parts.....................36 D.
Sludge Accumulation......................................38 E.
No Tube Explansion.......................................38 F.
Foreign Residue in Steam Generator Tubes.................40 IVo Summary.......ooooo.ooooooooooooo.ao..oooo..ooooo.o.oo.
~ ~ ooo ~.46
2.
I f
1 j J(
Jl
>I IIlt l
I.
Introduction A.
Purpose of Report This report describes the steam generator tube leak event and describes the inspections which were conducted on the PVNGS Units 1 and 2
Additionally, the report provides an evaluation 'of each of the significant inspection findings.
these evaluations, which are described on.a summary level in this report, provide the basis for ANPP's determination that power operation of PVNGS Units 1 and 2 may be safely resumed.
B.
Description of Event On 'January 17,
- 1987, an indication of primary to secondary leakage was received in the PVNGS Unit 1 control room.
The indication was in the form of a
high radiation alarm from the steam generator blowdown system radiation monitor associated with steam generator 81.
Subsequent to receipt of the
- alarm, the control room staff performed a
Reactor Coolant System (RCS) inventory balance calculation and determined that the primary to secondary leak rate was approximately 0.2 gpm.
Additionally, the RCS inventory balance calculations for the previous three days had indicated a trend of slowly increasing unidentified RCS leakage.
The primary to secondary leak was closely monitored by mass balance and secondary radiochemical techniques and the leak increased to approximately 0.4 gpm by the morning of January 18, 1987.
At this time, due to the increasing leakage
- trend, ANPP decided to shutdown the unit.
It should be noted that the leakage requirements of Technical Specification 3.4.5.2 were not exceeded prior to shutdown of the reactor.
C.
Description of the System 80 Steam Generator The System 80 steam generators (Figure 1) are of the recirculating U-tube design.
The tube supports employ the CE eggcrate design which provides maximum open flow area.
The ma)or difference between the System 80 steam generators and earlier CE steam generators is the incorporation of an integral economizer (Figure 2).
The economizer uses the lower portion of the cold leg half of the tube bundle to preheat incoming feedwater to saturation conditions, resulting in a more efficient heat transfer process.
The integral economizer is an axial flow design.
Feedwater is introduced into a water box (Figure 3) that forms a halfming around the cold leg aide of the tube bundle.
Discharging uniformly around the half-circumference through ports in the bottom of the water box, feedwater flows radially inward across the tube sheet beneath the flow distribution plate.
The flow distribution plate is designed to achieve uniform axial mass velocity over the cross section of the economizer.
The.economizer is formed by mounting a
2-5/8 inch thick divider plate in the tube lane (Figure 3) between the hot and cold leg sides of the tube bundle (Figure 4).
The divider plate is attached to the steam generator shell and the center support cylinder and extends up past the third tube support.
The divider plate completely isolates the cold and hot leg sides in the lower portion of the steam generator.
At the top of the economizer section (economizer section extends to the top of the divider plate as shown in Figure 4),
the saturated feedwater from the economizer section mixes with recirculating water introduced through a 16-inch entrance window extending 180'round the cold leg side half-circumference (Figure 2).
Recirculating water on the hot leg side is introduced into the tube bundle below a flow distribution plate, which forces flow radially inward across the tube sheet to achieve uniform axial velocity
4
through the distribution'late.
Axial flow through the flow distribution plate occurs through the 0.025 inch diametral clearance annulus formed by drilled holes in the flow distribution plate and the tubes passing through the plate.
There are no holes in the flow distribution plate without a corresponding tube gassing through it.
The steam generator tubes are 0.75 inch outside diameter with 0.042 inch thick walls.
The steam generator tubes are made of Inconel 600.
The eggcrate tube supports and the flow distribution plates are made of ferritic stainless steel.
D.
Development of Inspection Plan PVNGS Unit 1 was shutdown on January 18,
- 1987, and over the next several
- days, the RCS was cooled down to cold shutdown conditions in preparation for inspection of the steam generators.
ANPP elected to perform the Technical Specification required initial inservice eddy current inspection of the PVNGS Unit 1
The initial inspection plan included approximately 3,000 tubes in each of the PVNGS Unit 1 steam generators.
It should be noted that the selected inspection plan was very conservative and was well in excess of the Technical Specification required 3X sample (3X corresponds to 331 tubes).
On January 24,
- 1987, the primary manway was removed for visual inspection of steam generator 81.
The secondary side of steam generator 81 was in wet layup.
When the primary manway was removed, dripping water was observed on the cold leg side and indications were that the leaking tube was near the outer periphery of the tube bundle near the divider plate.
Eddy current testing (ECT) on January 27, 1987 confirmed the leak to be adjacent to the first eggcrate support on the row 3,
column 2
tube.
Continued ECT inspections discovered additional tubes with wear indications in the P
cold leg corners (tube bundle periphery by the cold leg&ot leg divider plate) of the steam generators.
At this time, ANPP decided
to increase the inspection scope to include additional tubes in the cold leg corner regions.
The final Unit 1 inspection pattern is indicated by the shaded regions of Figure 5.
At the time of the steam, generator tube leak in PVNGS Unit 1, Unit 2 was in cold shutdown for a surveillance testing outage.
Following evaluation of the initial eddy current inspection results from the Unit 1 steam generators, ANPP decided to also inspect the areas of interest in the Unit 2
The Unit 2 initial" inspection pattern involved approximately 40 tubes per steam generator in the cold leg corner regions.
Due to the random nature of the wear indications in the steam generators, the inspection area was expanded to 'approximately 80 tubes per steam generator to clearly bound the affected region.
The final inspection areas for the Unit 2 steam generators are shown by the outlined areas of the cold leg corners in Figures 8 and 9.
The eddy current examinations were performed using the standard bobb'in coil Zetec MIS-18 Digital Data Acquisition and Analysis System.
The MES-18 utilizes 4 channel multi-frequency (10 KHz to 1 MHz) differential and absolute coil techniques.
The 100Z preservice examinations of the PVNGS Units 1
and 2
steam generators were performed using the Zetec MIS-12 analog system.
The inspection system used during the most recent steam generator inspections is significantly more sensitive than the previous system.
I J
t j
~
~
4 Figure 1
STEAM/ WATER S EPARATORS STEAM DRVERS 000 0 0 0 AUXILIARY FEEDMfATER INLH TUBE BUNDLE SHROUD DOVINCOMER ANNULUS FLOIf DISTRIBUTION PLATES CENTER SUPPORT CYLINDER MAINFEEDWATER INLET INTEGRALECONOMIZER STEAM GENERATOR AX1ALFLOMf Figure 1
0
~
~
Figure' ECONOMIZER ELEVATION VIEW TUBE BUNDLE SHROUD CENTER SUPPORT CYLINDER
. "EGGCRATE" TU BE SUPPORT RECIRXLAT>ON
~ IIlATER ENTRAfCE WIMQA y FEEDmtATER BOX FLOVl DISTRI BUTION PLATE Figure 2
I
FfEDWATER NOZZLE FEEDIfATER DISTRIBUTION BOX 0
.0 0
0 0
0 0
0 0
1 0
0 0
0 0 0' 0
0 0
0 0
0 0
O 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
~
0 0
0 0
0 0
0 0
0 o
0 0
o
(
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
4 0
0 0
0 0 0,0 0
0 0
0 0
0 0
0 0
0 4
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0 0'0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
C$
0 0
0 0
0 0
0 0
0 4
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0' 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 4
0 0
0 0
0 0
0 0
0 0
0 0
4 0
0 0
0 0
0 0
0 0
0 0
0 4
0 0
0 0
0 0
0 0
0 9o'LOW DISTRIBUTION PLATE DIVIDER PLATE E CONOMI ZE R P LAN VI E Vl Figure 3
0 I
0
ECONOMIZER REGION DIVIDER PLATE I ~
I I
I I
I I
I I
I I
~ ~
o s
4 0 0
~ 'I e+ s l
~
~
~ l 0
~
~
q
% t 0 1
~ +
+
0 0 +
~ 1
~
+ \\
~
a a \\ \\
~~ s
~
y 4 0
0 4 ey O
y 4
~
O 4
y 4 y 0 gl o 4 e
~
0 a
y
~
+ g '+
'0 4
+
~ +
~
s a
~ 1
~
w o
~
4 1 o~
~
s o~~~
s s
o 4
'+
\\ 0 S 1 y a 0
a y
0
~
o 0 g a e
~
0 g 1 \\
0 0 \\ 0 0 ECONOMIZER REGION
Il
~-
Fx e
5 Steam Generator Inspection Pattern For Unit 1 (Shaded Regions)
I 160 150 140 130
~ h
~
~
~>>
120 110 100 90 80 70 50 10
)0
!0 0
~ '
~pl:
t'>>>>~
g'Ce V
V T 1
~
V C 'II'-'
~ W
'h r'>>Q h
~
h r x 'h>>Ih'
~\\
.>>>>h'v 4 >>%~M
~v%
g MPg v
'LO.
20 30.
40 50 60.
70 80 90 100 iip
%20 130 540 '50 560 170 g80 Fi:gure 5
0 I
0
! 4 I
I
II.
Results of Steam Generator Ins ections The PVNGS Units 1 and 2 steam generators were inspected by use of eddy current testing techniques during the months of January and February 1987.
This section of the report summarizes the results of these inspections.
The eddy current inspection results consist of the following types of indications.
A.
'Steam Generator Tube Wear Indications of tube wall thinning were found on several tubes (Table
- 1) of steam generators 1 and 2 in both Units 1 and 2.
These worn tubes are confined to a particular region of the steam generator (Figures 6 through 9).
The region where tube wear has been observed is referred to as the cold leg corner region.
The cold leg corner region is located on the outer periphery of the tube bundle adjacent to the economizer divider plate on the cold leg side of the steam generator.
There are two cold leg corner regions in each steam generator.
The indications of worn tubes are located at the second through sixth tube supports (first through fifth eggcrate supports) on the cold leg side of the steam generator.
Table 1 Summary of the Number of Worn Tubes Range of Wear Depth (X Throu h Wall)
Unit 1 SG 81 SG 82 SG 81 Unit 2 SG 82 C20 20-39 40-59 60-79 80-100 TOTALS 1
5 4
2 1
13 4
1 3
1 0
9 7
4 9
9 1
30 4
2 13 2
0 21 B.
Dented Steam Generator Tubes In steam generator
$/1 of PVNGS Unit 1, the tubes on the cold leg side in,row 1 at columns 48 through 64 (a total of 9 tubes as shown on Figure 10), exhibited indications caused by
)
deformation of the tube at the top surface of the flow distribution plate (first tube support).
Deformation of the tube at column 58 prevented passage of the 0.540 inch outside diameter eddy current probe.
Therefore, no eddy current data was available for this tube.
The other tubes that showed indications of denting were eddy current tested.
There were no indications of wear or loss of tube wall for any of the inspected dented tubes.
Fiberoptic inspection of the internal diameter of three tubes (row 1 columns 56, 58 and
- 60) verified the eddy current results and determined that the eddy current indications were slight indentations of approximately 1/16 to 1/8 inches.
In addition to the indentation, one tube also exhibited an even slighter indentation around a partial circumference of the tube.
The fiberoptic instrument, which has an outside diameter of 0.50 inches, was able to pass through the tube at row 1
column 58.
- However, the eddy current test
- probe, which has an outside diameter of 0.540 inches, was not able to pass through the tube at row 1 column 58.
C.
Indications of Potential Loose Parts The use of a multi-frequency eddy current probe allows for the detection of potential loose parts or other anomalies when using the lower frequency range of the eddy current probe.
As reported by our eddy current inspection team, potential loose part indications were found at the locations described in Table 2 and shown in Figures ll and 12.
J' I
l
,f 1
1
'([,
'ljI
Table 2 Unit 1 Potential Loose Parts Indications Steam Generator Number Tube Number Row 1,
Row 1,
Row 1,
Row 1,
Row 1,
Row 1,
Row 1,
Row 1y Row 1,
Column 48 Column 50 Column 52 Column 54 Column 56 Column 58 Column 60 Column 62 Column 64 Row 26, Column 113 Row 25, Column 114 Row 125, Column 100 Row 127, Column 100 Row 129, Column 100 Row 39, Column 4 D.
Sludge Accumulation The eddy current inspection revealed signs of sludge accumulation in the Unit 1 steam generators in small areas of the tube sheet.
The deepest accumulation of sludge is approximately 1-inch thick.
The sludge thickness rapidly decreases in depth as you move away from the area of the deepest accumulation.
The affected area encompasses approximately 35 tubes on the cold leg side of the steam generator as shown in the attached tube map of Unit 1 steam generator 81 (Figure 13).
Unit 1 steam generator 82 indicated small areas of sludge, on both the hot and cold leg sides of the steam generator, of depth less than 0.8 inches and encompassing approximately six tubes (Figures 14 and 15).
/t
't l
ltj I
E.
No Tube Explansion (NTE)
The tubes in the System 80 steam generators are explosively expanded
("explanded") into the 23.5 inch thick tube sheet.
CESSAR Section.5.4.2'4.1 described the expansion of the tubes into the tube sheet.
The purpose of explansion is to preclude the entry.of impurities to the crevice that would otherwise exist between the steam generator tubes and the tube sheet.
Such impurities could concentrate and potentially, over a
sufficient length of time, cause degradation of the affected steam generator tube's.
Explansion is not required to meet the primary coolant pressure boundry integrity requirements.
Pressure boundry integrity is assured by a tube-to-tube sheet weld located on the primary side of the tube sheet.
In Unit 1, there were 16 tubes in steam generator 81 and 14 tubes in steam generator 82 with indications that the tubes were not fully explanded into the tube sheet.
The indications of non-explanded tubes were randomly scattered across the tube sheet area on both steam generators.
The inspection equipment used during the preservice baseline examination was not sensitive enough (i.e.,
single frequency analog system) to identify nonmxplanded tubes.
F.
Foreign Residue in Steam Generator Tubes During the course of the eddy current inspection of Unit 1
steam generator 81, the eddy current probe became obstructed/restricted while probing certain peripheral tubes (Figure 16).
The eddy current probe, which started from the cold leg side, passed up the cold leg side and began to traverse the long horizontal portion of the U-tubes.
The
- probe, at various lengths depending on which tube was being
- probed, then began to encounter a resistance to its travel at various starting points.
The resistance would cause the ECT machines to stop f
I
pushing at some point, in the tube, either in the horizontal run or in the hot leg side of the tube.
At no time did the probe come to an abrupt halt.
- Rather, the probe would gradually slow down until the probe would not push any farther in the tube.
When this was reported, a decision was made to bound this phenomenon (i.e.,
determine the extent of tubes which may have deposits).
As the eddy current inspection team returned to this area for bounding these indications, the inspections were successful in probing the full tube length with a 0.610 inch outside diameter
- probe, cold leg to hot leg, with no further resistance.
The probe did pick up some material which was retrieved and sent to Battelle Northwest Laboratories for analysis.
The results of the laboratory analysis are discussed in Section III.F of this report.
After finding no further tubes in this area exhibiting this problem, the eddy current inspections returned to the task of completing the required steam generator tube inspection.
I'
~
t f
re 6 0
Unit 1, Steam Generator Nl Tube 1fear I'I fli C
0 Iij ill oovooo pooopoooo+ct ohio po~~o 0 oo 0
0 po 00(70QQQ~Q 0 c>OCQ(e>
(P(>of) 0 QR@P g~c>000(>$
o 00 0
ooCo oo QO 0
00 0000~
0 oo o o
ooo 0
0 0
0
< '0 opoc>,o@OC p
op 0~00 o o oC 000 000 C
o c~c,opo 0
0 000 p
!1 ip
'popCQOCQQ(c!QQQQOO 00000Q00>RC c>
0 o Epoop c>00(>C>QCVAROOO O
ll oo do
@0 (0>(p>o+~o()cP(0>CCQW@p~
0 d>drA~Ag 3
l r~>
H I! j
'4jpp Qpg o
5 o
000 R
%!0 p
0 309
>QC~QQ Qo 0
0 00 O
44 r
d' OO OOO PO" ~0 ~~O 3O OOO ogg o
00~~0
~@co>Q o
ops~
0 oo eb go 0
oo 0@5
)pro 0000>0000000~0 0(O>0 0(~)p>@0000@
C CC Wo o
00 0
0 0
"OP~ o
>@0 Qoooo oooo~
cggPQQ o 00 Op 3p 0 00 Ooppl/0000 0$
~II
/,>l N!I 0
c(>0 00 CQO o
000 Co OOOO ooopo ooo K~g~o o, p
p3 g C 0 0 o CCQo@C(OC(0~A>~Q o 0 0 0 0(>0000 0 30 00 0 g 0
0 as oo o
CUE q,rr
~~(~~rdCC>P~
c>> 0 ~ov PQ 000 Co 00000 QQP0000 0
Qo OOO O
0 O O O
0~
)-:!~!!~~p o
oporto o
0 o o o goo(~('0 oo 0
QQCQQ COOOd>
A o
rpoo
/( lrd C
000(>00000 000000 00 0~00 QO O Oo>0 p
0 0 Op 0 0 00 QCO@0
@0~00
@0 ooo oppoo
(>@QQO(>O OOOO O(>00 0
0 oooo 0 000
'00 pg 0
0 o-o oo 0
0 o
0 0~
0 O
0 O O jPQOO C
(I(5" o >0+
+OC OC V@00 0
C cC ooo Qp o
ooo o c>CC oo o OQO 000
'C.
00 00 0
o ooo oo OOOO OOO 0
0 00(>000&~
~
( ~
0
)C' jP 0~~000~>qv ooopoo 0
0 0
0 0 0 0 pop 000 0(>
Op
~~
)==:,(
d'
~rdd NN~ dk '0!!d'dry cQ@d'0 0o Pooo&opoogmc>p~o~o OOO
>0~'O Qo om
~I@~P
'I.....,,-...-
C op@oooo 00 ooop~c~Pcc~(PQ(!QpooCQC000000(>opopopop 000P)poqppo>o(>~00c>00(>
"0 oo~
(~coo 0 000 Opo 0
~'"~~VP4~c+kwA"I d4
.L.
0 0 QKP ooc> 0 0 0$
0 poyPQ Co~cPQ 0 o 0 00 O
O 000(
0 00 Oppm~
Kd'0 0 0 00
~0~~9'" O~d'd ~~O~Ompp 00 OOOO 00 C
0 op popo(>0 005 000 c>0~
o o
y 0
pop 0
O QO OOOOQ O
OO 0
Figure 6
0
Figure 7
Unit 1, Steam Generator N2 Tube Wear gc 0 Op ro 0 0 0
oo 0 Op
~g~@gg i~@~@.
Y'~~o o 00 0
o
~0 0~00000 00 oC@
ooW~P o
ooma'0~$0~000 ocIa po o
~o oo 0 g 0
000 l4 Op
~$0 0 0 00~ O4~000 o ""
o r
o ooo oo o
0 0
0 00 Oooo c
opoop op 0
00 Co 03@00 0
Oco 0
oo o
0~
0+
j,A...
qo
'tllb II!l N
0 0
o Ro oopo~o ciao o ooo~
00 <COO 0
0 0
0
~~~
I-=
- =Ii CIOO CP~
CC 00+0%~
0+0 ~00~000 o o
o oo o
o p~pooocbcPOOO Op CCOO 0 0
> o Ppcloo og
%~Ql'j (
0 000 0
00 0
co 0
p ooo S5 o g 0
@0 Qpp
- q, po 0
Oo oooo o~~8~0 400CC clop"o@"0 Po@0 0
3000ooo 0
CC 00 0~4000 Oog 0 oo
@0 oo Qc++~~%'
0 Opo 0
op 0+
0 00 Op oC 0000OO OoOOO Oo OOOO O
Oopp OgPO 00 OpCCpppoo 0
'Y:
ov ooo cpcc
~o
@40 4
o o
P~
4P e.
Oo.o o oocpppoo~pcC 0~
oo 00000 0
07 0
0, 0
o 4 0 Pp 0
0 0
0 000 cloooo o 0 OCC 0 o
OC 00 0
~08~~0 OOOO 00 I
I I
I I
0 Op
~oo poppy l~
I==.l ccrc>~
coop o
c~P0 0
0 0 000
'Coo OOO opo opoO 0
0
~g
&%0+0 o 0+000 OCCO&o 00 OO OOOO
~~p pp 0
ppp ~00 ~
P
~p%
p gQ 0 0 0 0 0 0 0 0 0 0 0 000 cPcPo 0 0 0 0 0 0 0 0 ~
p 0
0 0
0~$
o
.L.
0
~
~
~
~
~
~
~
~
t
~
Figure 7
)
I I(
t I
I I
0 Figure 8
Unit 2, Steam Generator Ni Tube Near and Inspection Plan Rl I!!H ~~""@ h.~j WW~, "~c"'
00 o
00'Cp 0
"00 o o"o 00 Po I I IIII'c 0
4000 g ococ'0 OC
~cn~~~c~
0000 00~00 00~0 0 OCC Co OCPO 00000~
oooo oooo 0~4 00000 Ilool 40 0
0 0 0 doOoO OP oO O O30 g 000
'f o 00000 0000000 0
I!M~
0 pop+0 o
0 o o
00 o ooo oCooo@c+c,34 0>>
00 0 0 o oopopoo oooo oo ooo ooo 0
~c ~<)II 0
p 400040llooC o40000 o 0$ ;C 0
iQQI00000 000 00400>>
%~A, o OOA o o ooo o3o 0
CPPPP jif~
0 PPPPP~TTfj II:!I 000~>>>>000000000 0000000000I 0000<
o 00 po 0000 oo o OOG 0ooo o
%0~4 000 ooo 8004 00 00
)0000 o
Co 0000 4
000 0 0000000 0
00 00 o
oo o
o o
0 0
op o
0 oo o
0~000 040+@~~0000 oooo A
ooCoo p
gv~
y opo po 0
pp 0
0 4
0 00 o
0 o
o o
po 0
PV OOPOPPOO O Oo
~00 CCO O
OOO o~opC Cg 004~
oooodo%0@044 Covo 00 o ooo o o o ovooo C o o o 0
0 0 0 0 0
oo o opcloo o 0
40 00 000 cc040 c
00 0
0 0
0 00+4%~
Oppo pooI 00 0+0 0 0 0 0~00000 Ilo o+
0 oo0 op po0 0
'N "c!q<
w@>>>>a:
0
~5 pk" ~
0 Qs~@:
.@%4 o
ooo o
o 00 oCooo oo CIOO ooppo ppo 30$
o 4@00 0 o
0 popo I=z 000 o
opooo o I
0 belli c:~~~
op o 0 00+00~ 0 o P 0 0
!=~
I~NNI i
~~/
o $00000 OOCOCO0I0O ooooo oopoo oooo 3
0 4
oo o
o 00 0
oo o
00o+
0~000000000@
o4000000~oooPo+o+Ilooo ooo o 04o oo 00 vo 0
vcIV Opop 0
0 po 8pocI pvo 0C vpo~cwp pop 0
o o
o 004 04po~o o 00 oo o 0
0 ogpo 0
0000404~~
dooooooo 3
C o o
0000 Coo+
o o oooop opooooovo ooo oo ovoC oc~PO
!I
~ ~
-Opc 0 C
0 0 0 0000 000004 q vopv~croooO'CI oo p 00000 0
I I'I I
I~d&
~0~~0000 00~~
o 0~
oporto~
~ov o
o 0 400000440~00 0%~%004popovo~opopPP cIo op 00440 000 opop& 0 O
po 0
Op p0 000 0 0 0 pocI000 0000 p
0 0
00 0 C
0 0
0 0 op Coooo o
po o o 0o 0~0 o o oCo ooo o 0+00 o o ooo ~0 o
3 o
o o o
00 o
op 00 o
00 0
popo o
. =.-~e oC@CCCPQ opo o
o 0
oo ov 4
Ppoogo Pc&P~oCq 0 o Coo 000 OOOOCIO 0 0 0 pp 00 4
'0 o o 0
~ ~eoooo 00 0 e~ oop ~ 0 op30 4~0 b+0+04pp o ocL o o I
L 00048000 0 00o3 000+44440403000VIICO 0004 opv p~8i'::
~
~
~
~
~
~
~
~
Figure 8
l
O gure 9
Unit 2, Steam Generator
¹2 Tube Near and Inspection Plan
'IEZI tl) j
~ 1 II g
0 0 opo (Ppmopb 0 qpoo oyypo o3000(boog@0<<Poo 4 i5@cb opooo 00 Opooo 0 00 00 4(P0000 00000~ 0 000400 ~ I b
C o
ooC b
o o cPo 3oooo~
I I
I 0
OpopoCoovg7040 opcP00000040000 pe pa 0 @ap o oo 40
~ ocPo~obogp 0
Pop oo o
gI po
~oo~000$030g 440(30(P 00~
000 4
I'+gI$%
Q@S I4$WA~(~a~P oooo o 4
Co o
8 og opoooocP+0~0(Pq b<4000 ping ob bocb030g(Cgo ocPcg o
o 0 ooC cP o400 0 o o3o cP0 po
'~~+o,~~~'g OOI0000 ooCoo (PC 0
0 I~I o
00 04ooo~
0 0 0
5+~!@.
8' po 0 (Po 84 0
0 0 30000 cP 0 oo 00 0 000 0
0 f/+
o
'0 0 0 0 (Pop%@
4(b do(P OP~oooo ooo o o o 0 pvo(P000~0 0 oqopocbop(booopo+
3 o+~o
'o 0404oo o oooC 04000 0
00~00 p 0
0~op
~0000 b00000000%000' cP cPcP ob o o o 000 0
000 0030000400(P 0
(p 0 booo<o)ogcg 0 cb(P0 0 Co 0
ooo o
ooo 004'Ppboa~o,g o
o 3ooo o
0 ooo~boo vo 0
0 Co~o
~04~((04 04 ~000~0 Cooo 04(P p op g4 0 0
op 040 cP0 0
lt I
@d'dc
%1 C
j~dP~oo oC 0~000 cg oa&o~oo~
Q d~q,+'I'd&IC~~d~
Po 00 OOO O OO OO O Oo O
0 0
0 0
0 0
Co <<8I000 00 cPooo ooogocboooo I
)PP(P00 ~oo OCOo 00CNPO ooo o o o o o
~
cP 0
INt~,
~..
I-~ I 0(ICCC qp ooo~
cpo oooC o o o 0
0 p
0 0 0000 0040 043 0 0 (A 0
PogCog>@~
o o04(b40 Cooo4%~
~d 0
o ooooppo cg 0+
0 0
0 g
boooooo oq o Cg
~00 004oo o oo oo 00 qo@g 0
00 00 0 (P
o oo Co 0
0 0
qo o
0 p
0 0
0 0
0 0
CP o
4 0
CPpqp 0
o o opo o o Opo ooo 00 o
Cp cP goop 00@0~00~~0 4
0~000 00 000 CP I
0~4 0
Oopp 0
0
,WPOOV 0 00 I
P 0 0
0(b c
0000 o 0
oo o o 0
0 Cvv oooo o ImI'~c'0'~~4$ (Q>~~
'PP':g j
~o vo oo
~ d+0 0~00 o
(P3 cPo.o" ovov "0
o o
o o
o I oo Coo o 000~ 04~0~0 0
~PEÃ.--.4M'wM P 0 0
0 0
0 oo 00(P o
~~04 o
go~ocbo o o popo Co 0 o oCo40 0340~040o op opqpo qopg 0 0
~pb 0 oo 00%~oo 0 o
~cP~
304oo o
o~(Popo 0
0 0
(P po 0 0040o oCooo cPcPoooCooppooo4 oooosoo'o op pcP 0
ooo o ooo
.L.
~
~
~
~
d
~
~
~
~
0 v
0 o
0 o(N opp Figure 9
I 0
re 10 Unit I, Steam Generator Ni Dented Tubes i/li ji gp pp 000(o0(0000 gpoopp pOgog 0 pop~00 0
P 00 c
O 0
0 0 O
OOP o
Oooo 3cPo f 0
p 0
0 0
P Ogggg 0)
'oporto o O 000 000 5<.
3~000l(0 0
0 0
cP0 0
0 0¹0$0000~0 4
0 o
cP o
A Op 000 0
rPO ogog ¹0 0~
O 0(\\((g0Q0 g) 0000~0000O00(PPoop op g~o~ogf&p(00 goo(jpo~Q 000 c(30 op 0$0000 Q0(co 03(P0O 000 ~
0 O OO Og 0 O
OO o ooo O
ooooogCO 0
cPp 0
0~
(P000 ogo&~~ogoog oo oo
(~p4 P,f I
00 0~000&04((00040030po(Ppg~oo 0
0 0
0 1
~c f~
00 0 popo 0~0000(coo cP op 0Q gOop 0(O000 00 o Qo W
0000'-O o
o
~ 1 0
p I==-
I~)
~~
I.
11
~A ~: I+k~+s, Wc(L~¹~"Q~M~~k~(~~~'w¹W:'.
04 o
m CPCPO o o
C 5~
c,o 0 c(0(Pgo O~gg(L.
o o o 0 0~%
~
uil I
a@/(lg(( ~~
0000+ 00
@@PPQOO~OOOgOOOpp 000~% 000 POOQOOOOOM000$
0 0
ti
,QP~
o 00 0
A
~~4 0 OOO o op ooogg PPO cPog o (Popopp Sg(PQ OO(PO(gp 000 0
0 00 0
1 0+0 0 0 000 0
..0 o 0
g30 (40 o
cPooog" OOM~pgpoooooo
~g Qp ~
0~~'CW'gg
()Ojgppp0 00 I
I I
I pO
~~dg@
( ~
0 op O3 0 pp pOpO 0(0p0 Op 0 0 popo 0 poop Op p 0(O
>'-'~~ e4~~~-'SIC 5:~~4 po 0
0 ocP0 0 0(Pgo&p 00 000 00 0 00000 cPoop(0 c
oo
> cPOO~
oo j >cipo P
0
~00 0 po00(P~QCCgp@op oo 0
o
~o o 3000 3 30(P@~
O'C P'0~
0 o% OC o 00~+gogoooo~o~o go Pp p0 0 op po o)op o 00 op o 0 5P op CK~OQQC 000 opcP0000 0 000000 00popggogog~+~
0 o
oooo o o ooo 0@30 a(7( 'o o o oo oo o o 0 Oooooo o o C
0 Op Op 0
Q Q O
0 00 pp 00 00 0 000~0000000 000 0%@0 go/Of ppgg~y 00 gjw>
0 0 00 0
0 (C@ 0 0(P o(po/~
0 0 04%popeo 0 gglijgg) o cPo Fieure 10
figure 11 Unit 1, Steam Generator Nl Potential Loose Parts Indications ffflfllfif jtjL lfL'll It',==
j'!
l CfC sgv~Wg~.)ij 000 0
r oe~ o ooqog9o9oogC¹ 3 oooCov o ~ovooC 8%F8¹ LJ ff ogov vvooog cPo'bvo
!R C
+00000 po P
0 cP j
Lk i
~e%w N)~.
~"ovgCoooboOC p"-QCpgoo o ov qoO opcgPg ooooocP 0 CP 0 bvoCgg@$
cb(Igvv0 MPrP (P'0 0
0 Cp 00 0
vvp 0 0
c'R~lgai:M~,(C o o C% 0 b (Po o80oCoCo 0
0 o
gogo 0
~ Pg5g',
@~gg~g 0+CQC pOpO C'o0 0(bg o~
(p8 C@08 0
0 o 0 0(bCQ gpo ogopo(PpoCopopo
¹Qo 8
o~o 0~
CQOQQCpgppg~oo QCQ~ b ooo 0
oq o oooCoov Ao>8000 o
0 oo 0
o po I
(P 0
0C 800 '~~4++~@~
4poo o"oocPoCooo 0(bpo 0
o Cfb
(~COopgv 0
Opovpopopoop o
o
-o o CC 0
op Qo o¹QCpb (bp b oppgoc pv 0 ogo
~op 0%(bgpggp cP C
0 o Q Q4~o~o 8
oob (lv(
ANNI(
d~4~~qp' Cw+C~ q,~F'(( %+@~@,Ad~&~
ooooo vvo vv o
o opb'pbpvp ooovo ooooo oo o
o Cvo Qgvov cPQP cboovgoC ov ooo bv ogog vl cP Qg ji
~b vo 0
0
- [L'i pv C o
0 00(bvo Cpo oooo(fop g."
ooooo o o 0 0
(
Ov po 0
0 lg )
(P pgopgvo 0(b(P/vopvgogogoQv~op vv~0 (cuing(vb Og Qp ooo v~oov~po(P 0
0 po 0
gog 808(POQ(bo po 00 0880 8opooooooooo ooo 0
o80 Qo vvop Qo ovo b opopovooo o
cgpgCg OQP 0 0 0 0 vg 0 Op v
OOOO pop C@
~(bog OQCPOO o po'b o o
oooo Co jf(
.!E 0
0 0
000 c(PQQQ
'bocjo oo cb ovppoo o
00 0
0 0
"C4jCQO C8C
¹Qvo 88 8¹0 0800
, <g~
4P 0
CPpppg Opgppopbpvp ~ ~ ~ ~ ~ ~ ~
o o oC o
o 0
Cogo 8bbpcb(b o 080&
0 cC o(PQQ¹ 0@
O 0+0 0 ov po o@00 (Popo Q(P CQQ go (880800 0
8000 000 0 0 og go 0
(P(PQQQQQQ+0 0
(P00%00 Co@00 oovgog o 000 n
o C:
,Clio (P(f po v
C f
4"W4ijf~Cec
@e 0
gPO
&000 0000(PcP 0 OC bCopovovo 0 0 (P000 000000000%8 ops
.L.
~
~
~
0
~
0
~
0
~
~
~
~
&'o(P000000o 0
~v- ~QP ooo 80 ~o-Cgg(kb ocb gogo
¹0 o o cgo 80"pvo C
g oogoo oooCoo o
cP ooo oo f ~~uoCQ(gbgo o o 0%b~~v cPo Figure ll
0 f
t 0
figure 12 Unit 1, Steam Generator
<<2 Potential Loose Parts Indications t Ililt!I
[',
11 Wlf II fI l
1[,
U VLMALLlil4%4
. I,jul, jjjlIP-"kg '-:,.
fl!Lll!
t,'l,l IllJ I o
o Pogoo+
0000 (NQ goo ooo 0
gop Qfp QCPQO~CQO o
o o
~0 oo op Qpoog 0~
005 4
0 0 0 00 0000 000(PCPQO opogpo Ij Oaoopo oO Ooqppo o opo o cP CPQ IL 00 of>o ppo 0 000 00 ocgo gooop 0 (PcPQQ cg(Po g gQ(P(P cPo~gogog 00 9~0(POQ(>g (C~oq o(Po o
cP ogo~oo(PO (P@ogooggb o o~oo~ofoo(Coop,ooc~Pogo op~op gpoo
+'000 0 00000 00 OQO 4@Ma~
age (P
o 000 gdl pop~op 0000 cP go 0 cP 0 ( 0 (0
0 000
~j 0(>
gg 0 Qgo(>(POQ 00 0(PQQ ogo~oo 0(
00(P o+(Cg o o goo' os>q(Pg o o-o~o cP o cPo opcPo o o o
pgo o(Po I:I
[fl tt>leap, 4", q>
0 00 00 op
,[Ietc,.Wnf 4 0
.f'o o o o(P oq oooo oo 0
c)11
'c 0
c op 0
0O0 0
p 0 P Po 0 go 000 0 op 0 op 00 0 0 googC o o ooo o
0 0
0 0 0 8'4~
@ d'f>ng If[I g
o o~jjo o Po, 0 o
o Oooo o
OplP WVP~
0 0 0 ogp 000000 0 000~<80 Ioo 0%~ oqgp opo o
o oo o
0
-'g.
Qgo o(Poogopop cP go 0
cog d0 000 Qqp 000(f oooop 0 0 gg o/ocpg<goy ~ 0 q> f(Cp 0 0
[PV4[lp 1
.~
@pMn 8 cpo gag(Pon oocpcp 00~0@
fA'...'I.
0 0 N
0 QQ 0
0 0 0 0 0 0 oqcg 0 0 0 0 (PQ-0 0
0 oooqpcP pf>~0 po pop Qp 0
0 CP(Pg> pgp
/pop@00< o yo o o ogp 0 oCp po AHQ CPP~
og 0(P(> ooopoqoP IP(P'Appgppo 0 @0
(>~~(PO(P@
~0 000~00~0000 (Poop@+7(P~N>
Ipg cPp~(PQQW~qopg CgD op(p 0
l 0
00 Q
0 (Pgg>0 000 0
l o('o (Ppq' 0
0 cp 0
fp 0 ogo o~~o 0 0 0~<)
0 0 p~ogc44PQ oo oogcPo oo o ogooppoooo oooo OcP
~CPQ 0
0(PQ o
@~4~~44p g
0 g
l 0(Pgog(Cpp
@(PQ@000>
f>pgpoopo 0~pop(Ppofgogg 0
0 CPQQ~CPQV 00pgOOOpgpcpgopnoppppPOQ 00~00 g Of 0
QQCPQQP<>~000(C0$000~&go~o~ccpo@~ofaoqogogogopooMyog CPQQQ(P(PQQQQ 0000000000(PQ 0
0o
>MMgP ~g~g" K~w "Kff$~
cP@
g 1
opqpcgogpgoQ pgclp~gpq> 0 0 0 pg(PO 3~QO(0>g~b 0 (Cg qpopoQogo(P 0
~
~
0 0
~
0
~~ ~
0e I
~
~
~
~
Figure 12
0 I
I
re 13 Unit 1, Steam Generator
<<1 Cold Leg Side Sludge VV&e ti i
I J
J J
.3P, tI f 000 0 00 o4000 00 00 400o~o+
40 p@0 poo 0
o 0~000J Occ 0400 Ih.:
go Oo(c@0~0~000000 op(
00 0
@0 oo OOOCOCo o u~ +0+OP000 ooCoC ~
COCFo 003(CCo04o~ooo ooo Soopooo oooo OOCd 0 00 0 00 opo 0
I'oopo ooopo 0000
@0 3~400/~00 0040 0
0 0
00 oo OOONC~P 0
J JJ I )PP 3!l!,
00 04 poop 000 0
0400~0~00030(c oooCoC OCo 0
p@o 4~00)%
goo o
0 0
0 0
0 0 J op400 o PM 40043$
0000 000 o ogo o 4J0304 0 0 00 o 0~+0 3~o(,CCC0~0$
4'8 044
, ~I; C@Cg~~
j)!,.
0~0 IIO oopooP0~0000 30000 Il~~!
epp 0
00 0 0 0
$~~0400+b~ooC 0(p~o~op g> 0 0 0 3000000000 0 ciao+
400003 (PS@00 0
00 0~ 4 00000P0
$ 00O~P 000 OP" OO 000000 000 OC Opp(0 o ~~@
o 00 3'oo' AC/0 o 0+000 0
03 pppp ooo'o o
000((
OP~W+,00~
~30 oooo%
000 0
0 0
00@000 g)0 0
0 0@0 0 00 C@ppoo 0
o Coo yo o oo
~~~0 ppp
(~PO~@0$0~
0000 C~ppoo o
1 0
0 oC 0
I PO00000 000 0
cCp~.
00" 00 0% o 00 ooooooooopo 0
(4 000 o00 ~~
0 o OCCO@o o
~oo o 0%
co o
00 o
op 0
0
(.
0
.Cp QCCg8oo~
CC)~04',o SoCO Cog o ooo o
0 0
~
0 Co 0
o Coo 0
4 0~04 4 Co 0004p~o~oop~qooppoo c(O((p@~)~cP00000000000~cP~ooo 0
0 000 CO~)ooo I
I I
I
~ooopp Oeee
~eeeoe
~ ~
~eeee
~ ~
0 00 0
0 0 0 4000 oo 0 0
~e e e e e 04000 0~op%
000(
0000 0 00~00 0 cggpgpoCopop Cp oop o-op oopopo -~0 o ooo o Co 0000000000000-00 00-OPo oo0300"o po o 00040o40oooP
&000 0 (4(oooo oooCcPopooo~ppoogooog3 K%4 d'd'5&((~4W I
~
~
~
~
~
o o
~
o Figure 13
l
9 gure 14 Unit 1, Steam Generator N2 Cold Leg Side Sludge V ~ALLLLLVlJVLLLV
~LLLLV J
'jIQP.II':: ~!.
, 4 OCopoo
[I!
t!!
00 8gvo080 00 o 0 OOQ 00 000000 8~00
@0 o o o
Oo
~>W~,o PO8 0
oo o85 Scc& p yy'popo I=I C~1
~
1 C~l~
0 40 jjk.~
oooo
%cPO 0 0 oo8oo oo ooo o8o o
ooo ooo88 00~~008088000880 o
0~08&08 o
0 0 0
CQ )CC:
I 000 cP
'oc'o voo o~occooooo O~CPO@o opo o o 0
o ooo 0
cP Woo~0 o 08o C8
-,III'"
Ap h"jj 0
0 CC0~%0 Op
~0 c
op J,0080oooooocov o
oov ogoo@cP00 000 Cg 0
0 0
'-'qf 0 04~0~0~0800 cC&p0808000~%
800 o"o o o8oo ooooo oo 0 o 0
cP 0
0 ovopp cppp 0
-000-0-opo W00$CPopo 0 0 0
0 cPcP 0080cPpg>0 00 8
0 o, 00 rP 00 Ov o oo o
o%v oooo ooooopo"oo ooo o8oo o
o o op Op 0$ 0 op48088@88000 C ~ cCm
~$
~
wC LCImC q,ma 0
88 0
080 v 0
08 0
000 0%
Wpo po 00 0 0
cP000000 000 C 0 0 0 0 0
0 0
0 cc'o"W Poop p ~
00 jjc c,.
~..y po opo po 0 00 Ro 0 opopop 80 cP 0
0 0
gN~s 0~0 4~~o cPoo o ooo80 0 cc o o 0
. )0 0~~8 0
Kpooo~ooom~ooooo~o~ov o
~ $ P 000 ogpo 008po~ooocdo 0o8oo8 0
o8oo
~ 488'
." 4 ooo'o go o
o ~~
oooo 0
c4'P
~J I jh c~c 00 08~+~ 00 0 cPpopo 00000 0
80 4A 8 o~o 0
0 p
cP888~
008880 0880p
~
t
,~j 0
0 8
I o
opo p 00000 op 0 pop 0008opopop0~008 c8P8op080pooo 800 pop~0 op 0(PP'Occ 0
4e~A.
~008pc opo 0
wov
&OPovcPW(
cP0080+&00000 cPvocP0 cP 808cP 0
Opp 0
00 ooo " 0 o
o o 0 ocPo cPOO
~008cc~
~800 vpooooooooo 0 0o8p0
~00000 0 8
Iop
~
oov 0
I I
opvÃovy&goo o cPcP~cCopo cPvop00000808yP o PpcCoocPPocPP~80 Wfcp
"+
&""A+ d'N d'd'L.
080 o ov OQQQ OQQpQ Op@I QQQQQO QOQO~OQQ(,eQO 0QOQOQopcvPOP 0 0 W~o 0
0 8~0 vo 0~v08080 0 0 cP~~0 9000 0 0 0 0 0 0
voo 4
4, Figure 14
Q gure 15 Unit 1, Steam Generator It2 Hot Leg Side Sludge f!H,
)~K jf glJ1I PIC Ir,=
'jjk~5~@
C jIjj8 fj, yo oo oo oo o
o o
0
~pop pop o
o4oopooo o o ogogo ocCo oo oo4oo ooooog Ao Ngp AP 4
p 0
(i~~~
g.
CccW4I~@,
0 o~o 0
0 ooo o
o go ogpu~op go o 0 oo o
o o oo~
o o
8 ggoooo o 4o oo oogggoo cocoooo o ooooo 0 ooos&oo o
poop oo o o
po 0 O
Oo o
4 ogogo o ~ opoogo ogo os oo oooo o
o po 0
0 0
coo Ogpcpopgoo~
OOCCOCCC~CO o
op opo 0 opgog IIII
>V"
~
. ""~"s "~c"~cf>r oo op o
o4o o ooo oWcpo cp o4ooo o 0
ppppo ogopoo Pp o
QgRoooogo 0
o
~ooopooo
~gooo4go4gpo O4oooo o
~
~
ooo oooo Opo POOppg pO Oooooooo o gooogpo cc
'R.. NWlI.
CPO o
oooo oooooo o ogc~p o oooooo o III,+<I~
pop o o op op op oopo4oo44ooooc oo o +@hkoaao oo4oogo o
op opo cd o o
og op o (PopPlgop p og pp p
CC po 0
ooo4ooo4g o 0 0
p o
op oo ~
opgcC 0
ooo o
oo4opoggogopogogopoggooooooo¹poo oop gal%(%>poRcRcg84 oo 0
oo 0
o o
o o
0 ooo pp ooo0 0
opp iaaf 0 oooo 0 gog po 0
o 0@
0 0
0 C
o o O4O ppg" 4 o% d cPcPcPo%%cPo4O o o o
~
~
~
~
40 o
oooo c
O 0
0 3oo oo o~o coo 4o o o &oooo ooo4~40
+~dP ocrop ppooo 0 0
,~..4-F oo oo oo oo oo o
o o poo oo oo oo o oo o o<
0 0
o 0
CP 0
o4 o~4 cPoo op cgcgcp4c4ogo po 0
0 o o
4O4ooooo+O~PO o
o o oo o ooo~~&oy4
'cgo4O
@ceo '4 ooo poo'o Figure 15
l 0
0 ure 16 Unit 1, Steam Generator ftl Foreign Material Locations T~~.y~jg 0
(tee~~
'NjI
(*
Jt
!II~
I~
IQ)i I',~
'~~j! '
d"-.'PooOI ogvgog~om004g,o4g o
goo0 0@
0 00 gg 0
0 0
ob4000 0
oocPocP ooooo o ocooo 4oo4 o
o 00040430~
o 0 0
cP o o 000 000 0 OdPO PV
.I
~ CPvoooobvovv~oo 0
oo oov (Poogv04opovoooooooo~voogo~coal 0oo o
0 0~
0 00(P go 000008gvog(po 40(Cvoo+o 4o4 (P o 8 cCcPO
~400gg~SoOo&doovo+Pg B~~
"400~4o0oooooogooovoo o oo4o4o o oo 3I,-~~
~~00000@000 oooo30 Q&~0@ogooo Ovo Oo 44 o
o oo 00000 00000@00 OOO 4P4g" 0
4 d
ddt~(+ d d
o4 0
oo d'((000~~0 0 000
-'~~~A
~~ljil
~3~~!'8P(
gvoo4(P0~04 040~~0/40 o
cP o
0 0
g cP "oo 0 ov~oYOO@QcPo os
'ov 3 ~OO~
0 V~OOOO o Q cP
~00(g(gv o o 000 o cPO o oo~~ ovo s,!I l0"'l cl 00 "o
00 oo 0
0~vVv(P
Oo 0
Ovgo 0
0 Ovjjo 00'0 000 goo~
00 0 0
0 000 og40go 0
0 0
00 00 cP 4(P 0
0 0
0 0
P(IO 0~0 og o
Oo oo o o~oo+~o 4 ~
0 00 0
~cA>~b0~
~Wg o o o@00(Poo4~cP o
oovgg 00 000
~00 0 0
0 Ov oo 00~~00 ~~~004000 gocPV o ogvoo o
o ooo 0
00 Ogod(PdwOrAgvo 00 (Pg 0 0 0
000
~(PPV 00 0 cPV+~0400 0
0 00 0(
~000$ 0 0 Oogv cP o
0 (Pvo c
80 4o~ov 00400000 o
00003mv O~Cg
~~000040 4P~b oooo v40000(PV+00+o 0
o
~0 (PO 00000 0
opoOo o
ooo 000 o
o g
opc 0
0 0
04l O
o oo o
vo oo o oooooooovdoo(v vv oo o4 o
0<
0 f 0
0 0@0
(((P4 0
Wd 0 I
I ov 0
0 ~C+IV 0 P v~
v oo c oo y~~.-
0 o
ogv v o o
ocp c'0( ~~~
ooooo 00 ovvd.oov"(PV o (Po~goC oo ocgPgogo
.Bpdvd& v~- ~o 0(PO 00 g 0
PV4 gv.
o o~~go
>~@~OOPo
~000000 o o o~g ooo
-o I P
g "~ "N~P ~ d'q,
-@g P dd4 "@~PE P" W(P0~0 0@
0 do~0 0 0 cP ov(P ~0%
o 0
~-)=(
o 4o0 (P
000 4
0 cPoo o+a~K~~g$ ~@~o,S,'og~,oW~~N0o30,8,oFPo~o~4o$
o oo
.L.
o o
0 0 ooo ooo 3g vo4ooo o oo o
ooogog40 0040 0'"
oo oo Figure 16
i l
III. Evaluation of Ins ection Findin s The eddy current'nspection results outlined in Section II were evaluated by ANPP personnel and by Combustion Engineering.
In
- addition, samples of the foreign material were analyzed by Battelle Northwest Laboratories.
The results of these analyses will be summarized in this section of the report.
A.
Steam Generator Tube Wear An evaluation of the eddy current test data determined the indications to be typical of that caused by tube-to-support wear resulting from tube vibration.
The cause of the tube vibration is postulated to be local high radial velocity flow streaming of entering recirculating fluid.
In the CE System 80 steam generators (Figure 1), the downcomer recirculating flow enters the cold leg side tube bundle above the integral economizer between the second and third tube supports (Figure 2).
At the intersection of the recirculating wate" entrance window and the tube
- lane, a
unique condition exists wherein the downcomer recirculating water can preferentially seek the low flow resistance open tube lane (Figure 17).
This results in high local radial cross flow velocities.
These velocities are believed to be of sufficient magnitude to cause tubes along the tube lane near the recirculating water entrance window to vibrate within the eggcrate supports, resulting in the observed tube wear.
This unique condition is isolated to the small number of tubes at the intersection of the, tube lane and the downcomer recirculating window.
The previous thermal hydraulic design analysis was performed using a
coarse mesh which does not model the tube lane/recirculating window configuration in detail.
The need for a finer mesh to achieve a detailed flow model of this region was not previously realized.
l l
I
Since, radial flow,is quickly converted to axial flow by becoming entrained with the upward flowing fluid from the economizer region and by the heat transfer
- process, the affected region extends only a limited distance down the tube lane.
The general case of cold leg side recirculating fluid entering the tube bundle away from the tube lane was analyzed and tested during the design process and found to be acceptable.
This was verified by eddy current inspection of the Unit 1 steam generators which showed no wear indications
'long the outer periphery of the tube bundle away from the tube lane.
Recirculating fluid on the hot leg side enters at the tube sheet as in all previous CE steam generators.
No indications of wear were found on the hot leg side.
Variances in the number of worn tubes between steam generators 1 and 2 and between Units 1
and 2 is believed to be due to variations in the as-built dimensions of tube supports and tube support alignments, causing some tubes to be held firmly and more rigidly than other tubes.
This variation has been demonstrated via examination of a prototypical sample of an eggcrate support as demonstrated to the NRC staff during a
meeting on February 9, 1987.
This condition can be further aggravated near the outer periphery where the eggcrates are welded to the shroud support bars (Figure 18), potentially resulting in slight distortion of individual eggcrate members.
The tighter held tubes are sufficiently stiff to resist vibration and, 'thus, exhibit no wear Therefore, both conditions, loosely held tubes and high radial cross flow velocity must exist -to cause this tube wear phenomenon.
The wear indications have similar wear scars to those experienced at other nuclear units with Combustion Engineering supplied steam generators such as San Onofre Units 2
and 3,
Waterford 3, and St. Lucie Unit 2.
At these plants, tube wear
>>29-
1
'l, J
('I j
occurred due to flow induced contact between the diagonal tube spacer strips
("batwings")
and the tubes.
To determine the safety significance of that condition, CE conducted leak/burst testing of tubes with wear patterns of the same nature as the wear patterns observed at San Onofre.
'The test results indicate that the wear characteristics are such that the tubes will develop
- small, but detectable, leaks that will remain stable during normal and postulated accident conditions.
Tests were also conducted on tubes with 0.042 inch thick tube walls in anticipation of finding a similar "batwing" problem on System 80 steam generators.
ANPP and CE consider these tests to be applicable to the PVNGS tube to eggcrate wear due to the similarity'n the wear mechanism and the wear scars.
As an additional note, the PVNGS Unit 1 steam generators were inspected in the "batwings" area of concern (tubes around the central stay cylinder) and no indications of tube wear were found.
Sine'e any leaks would be detected and monitored, appropriate
- actions, as required by Technical Specifications, would be taken to prevent development of a more significant condition.
Technical Specification 3.4.5.2 requires that when primary-to-secondary leakage through all steam generators exceeds 1
gpm and 720 gallons per day through one steam generator, the plant must be placed in hot standby within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in cold shutdown within the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
- Thus,
,this condition does not represent a significant safety hazard.
The root cause of this condition has been determined to be the unique condition at the intersection of the recirculating water entrance window and the tube lane where high radial flow velocities can exist.
This configuration was not analyzed or tested during the design process.
This condition did not exist in previous CE steam generators since only the System 80 design features cold leg side recirculating water entrance above the integral economizer.
j
(
f
Corrective Action ANPP has plugged and staked all tubes with any indication of wear in the local high velocity region in Units 1
and 2.
Those tubes with no wear to date are postulated to be sufficiently supported to preclude vibration and a
mechanism by which this condition could change has not been identified.
Therefore, these tubes will remain in service.
All unplugged tubes in Units 1
and 2 in the region of interest will be reinspected during the next refueling outage to confirm that wear has not initiated in these tubes.
Combustion Engineering will perform a
confirmatory flow analysis to more accurately model the recirculating water entrance to the open tube lane configuration.
This analysis will be provided to the NRC Staff after ANPP review and acceptance of the analysis.
It is expected this model will analytically predict local high radial flow velocities and thus confirm the postulated flow streaming phenomenon.
B.
Dented Steam Generator Tubes An evaluation was performed on row 1 tubes to determine the characteristics and probable cause of the deformation observed gust above the cold leg flow distribution plate.
In the process of verifying the
- location, magnitude, and characteristic shape of the deformation, a
variety of frequencies were used as follows:
550KHz Absolute this frequency was used to profile the inside diameter of the tube to determine the location, the relative magnitude, and the shape of the deformed region.
these frequencies were 'sed to eliminate the signal caused by deformation to determine if metal loss had occurred on the outside diameter of the tube.
No metal loss was noted.
0 0
20KHz Absolute this frequency was used to assist in the detection of foreign objects on the outside diameter of the of tube.
The review of the 20KHz data indicated the apparent presence of a foreign object at the same location as the higher of two dent indications at row 1 column 60 and row 1 column 62.
Both of these tubes had two indications of deformation.
Both tubes exhibited deformation at the top of the flow distribution plate and at several inches above the plate.'ll other tubes had deformation only at the top of the flow distribution plate.
An additional review of the 20 KHz absolute signal revealed that a foreign object appeared to be adjacent to the single indication of deformation at the top of the flow distribution plate in row 1
column 48 through column 56.
This indicates that the object appears to be at least 12 inches in length, is lying on the flow distribution
- plate, and may be bent upward at the location of row 1
column 60 and row 1 column 62.
The signal indicating the presence of the foreign object is similar to a signal that would be caused by a
bar of ferritic stainless steel.
No degradation such as would be caused by wear was evident on any of the dented tubes.
A laboratory
- mockup, which tested various materials next to the tube, was used to correlate the eddy current signals with those observed in the field.
In light of the limited affected region and the detection of a metallic foreign object adjacent to the nine dented tubes, it is hypothesized that the deformation was caused by the wedging action of a metal "bar" between the economizer divider plate and the row.1 tubes during power operation.
Since the flow distribution plate is made of 405 ferritic stainless steel, it has a lower coefficient of thermal expansion than the tube sheet.
The relative temperature of the plate (secondary
- side, subcooled below saturation temperature) is also less than the tube sheet (RCS cold leg temperature).
Therefore, the flow i
distribution plate tends to move away from the economizer divider plate during heatup and power loading.
The foreign object could then have worked into position above the flow distribution plate and wedged itself between the row 1 tubes and the divider plate.
As the unit unloads and cools
- down, the flow distribution plate tends to move toward the economizer divider plate approximately 1/8 inch.
Since the foreign object was trapped and
" presumably non-compressible, the tubes absorbed deformation of up to 1/8 inch.
A dent of 1/8 inch would not allow passage of a 0.540 inch ECT probe.
The tube could be dented at the elevation of the foreign object or at the top of the flow distribution plate by the reaction force, or by the combination of both.
A fiberoptics inspection of a dented tube tended to confirm the above hypothesis.
A slight straight edged indentation was found above and opposite to a smaller partial circumferential indication.
This would indicate a primary dent induced by a
"bar-like" object causing a reactive dent on the opposite side of a tube caused by the reaction force at the top edge of the drilled holes in the flow distribution plate.
While precise identification of the foreign object cannot be
- made, one possibility is that a bar was introduced into the steam generator as a
temporary shim during the installation and alignment of the lowest partial eggcrate tube support in the economizer region.
That operation was performed in a
horizontal position.
During assembly, it is necessary to "block-up" the partial eggcrate to obtain optical alignment with the tube sheet and the previously installed flow di.stribution plate.
Once alignment is achieved, support lugs, welded to the downcomer wrapper cylinder, secure the partial eggcrate support in position and all shimming stock should have been removed.
Conceivably, a
bar could have been overlooked and left in the steam generator.
When the unit was lifted into the vertical position for the first time at the pVNGS site, the bar could have dropped down or it might have I
~
P'
occurred when the tube bundle moved away slightly from the divider plate during heatup as explained previously.
Since nine successive tubes were dented and eddy current indications showed the presence of a
foreign
- object, the object is expected to be 12 to 14 inches long.
A means by which an object of this size could have been introduced into this region during maintenance or inspection has not been identified.
Therefore, it is concluded that an object left in the steam generator from the manufacturing process is the most probable source of the indications.
Due to the location of the foreign object on top of the flow distribution plate, there is no way to get an inspection probe to that area.
A possibility would be to remove the row 2
column 61 tube by cutting just below the lowest eggcrate to create an inspection route for a partial view of the object
, and dents.
Removal of a
dented tube is not recommended because it could get stuck in the flow distribution plate or in the tube sheet.
In addition, removal of a
tube from the flow di,stribution plate would leave a flow hole in the plate approximately one inch in diameter.
This unobstructed flow path would lead to higher local velocities in the area of the foreign object, and possibly lead to movement of the object.
- Thus, unless the object has a
high probability'f removal through the tube sheet, it would not be advisable to remove a
tube.
The flow distribution analysis, perfoimed during the design
- process, predicts velocities of approximately 1.5 ft/sec at
/
the location of the foreign object.
The flow direction is primarily vertically upward.
The velocity
- adjacent, to the divider plate at this radial position is likely significantly lower than 1.5 ft/sec.
Since the fluid source for this area is incoming feedwater and since the radial flow can escape upwards between the flow distribution plate and the economizer divider plate, the flow at the position of the foreign object is quite low.
The on-going flow distribution analysis review
,'I II
[
of the economizer divider plate region is expected to support this conclusion.
It should also be noted that there was no wear on the dented tubes.
A dent of 1/8 inch would produce a circumferential tensile strain of less than 8%
on the tube inside diameter.
The maximum tube inside diameter circumferential tensile strain of 8%
is well below the 14X strain threshold required for "coriou" cracking (the cracking of alloy 600 tubing in high temperature PWR primary water due to a
combination of high tensile stresses or strains and a
susceptible micro-structure).
Steam generator tubes which have become dented within drilled plates (usually due to the formation of non-protective magnetite) can take an irregular cross section as a
result of being constrained from expansion in all directions.
The irregular constrained cross section can produce high inside diameter circumferential tensile strains above 14X which could then lead to tube cracking.
Since the denting in PVNGS Unit 1 steam generator is above the flow distribution
'late, the irregular constrained cross section will not be formed and the high circumferential inside diameter tensile strains will not be produced.
Axial inside diameter strains have not produced tube cracking based on industry experience.
As
- such, denting of these tubes is not considered to be a
safety concern.
Corrective Action Since the foreign object is wedged in place and is in a
relatively low velocity flow field, relocation of the object is not considered credible.
Since the above hypothesis would indicate tube loading in a displacement controlled manner, the condition is not expected to worsen with time. Involved
0 0
1
procedures, such as tube pulling, do not seem warranted in light of ALQV. considerations and no further anticipated tube damage.
It is, ANPP's and CE's opinion that tube
- plugging, regardless of method, is not necessary.
Honi.toring selective dented tubes during a'uture planned eddy current inspection would confirm the non-progression of the tube dents with time.
The condition of the wedged foreign object bears no resemblance to the phenomena of damage due to impact of "loose parts" which has led to tube rupture in a
small number of operating steam generators.
In the loose part
- scenario, repeated impacting of a
loose
- part, accelerated by high velocity (as high as 15 feet per
- second, as referenced in NUREG&909) and high density flows, imparts cold work to one side of a tube which ovalizes the tube cross section plus it subsequently collapses due to external pressure.
The collapsed cross section then breaks under flow loading and beats against adjacent tubes which subsequently rupture due to gross metal loss.
None of these phenomena are applicable to the wedged foreign object.
There is no evidence to suggest a
generic aspect of the foreign object induced tube denting found in Unit 1.
Historically, CE has been successful in precluding the introduction of foreign material in previous units.
C.
Indications of Potential Loose Parts The indications present in Unit 1 steam generator 81 are in the tubes at row 26 column 113 and row 25 column 114 and are located just above the tube sheet.
The amplitude of the indications are too small to draw significant conclusions as to the origin of the indications.
l I
l f
I
(
Although the indications are too small to be well characterized, neither of the two tubes or any surrounding tubes show any sign of wear or tube wall degradation.
- Thus, the presence of these indications does not -represent a safety concern.
. The presence of a
foreign object cannot be verified by fiberoptic inspection on the secondary side of the steam generator.
Because the economizer divider plate is mounted in the tube lane, the,tubesheet access port is offset 15 degrees away from the tube lane.
- Thus, fiberoptic equipment cannot access the tube lane and visual inspection along the lane cannot be accomplished.
The indication in Unit 1
steam generator Ol at rows 125 through 129 column 100 and in steam geneiator 82 at row 39 column 4 have been determined to be variations in the tubes themselves, such as the result of a permeability change in the tube.
A multi-frequency mix of the eddy current signals indicates no tube wall degradation and no actual presence of foreign material.
Therefore, these indications do not represent a significant safety concern.
Corrective Action The indications of a loose part at the row 1
columns 48 through 64 location are discussed in Section III.B of this repo'rt.
Two of the three remaining areas have been determined to be other than loose parts.
The possible presence of a
small foreign object at the remaining location cannot be positively ruled out.
However, if one does exist, its size
'I and location is such that no damage has occurred and no corrective action is necessary.
These and other surrounding tubes will be monitored in a
subsequent eddy current inspection.
0
D.
Sludge Accumulation The very small amount of sludge found in the Unit 1
steam generators indicates that secondary chemistry control has been good.
The locations of the largest deposits of sludge indicate that the sludge is being swept across the tube sheet to the area of the blowdown ring.
This indicates that the blowdown system is operating as designed to prevent sludge accumulations from forming in the center regions of the tube bundle which have been a concern in previous steam generator designs.
The accumulation of sludge and its affects on the steam generator tubes is a
well documented occurrence in the industry.
The use of a recirculation-type steam generator coupled with an all volatile chemistry program has diminished tube thinning problems such that it is no longer a
problem.
The use of volatile chemistry control also reduces or eliminates the problem of chemical concentration since the high heat flux would only remove the volatile chemicals from the sludge.
Due to the inaccessability of the tube lane and tube sheet area on the System 80 steam generators, the sludge accumulation cannot be removed by use of sludge lancing equipment.
The sludge accumulation is monitored each time the steam generators undergo an eddy current inspection.
E.
No Tube Explansion (NTE)
The tubes in a
System 80 steam generator are explosively expanded into the 23.5 inch tube sheet.
Those tubes which exhibit NTE either had an undersized charge or the charge failed to detonate.
'] ll, l
I l
I
Localized corrosion of tubing material has led to steam generator tube leakage in some operating reactor plants where crevices exist.
Examination of tube defects
=that have resulted in leakage has shown that two mechanisms are primarily responsible.
The localized corrosion mechanisms are referred to as (1) stress assisted caustic
- cracking, and (2) local wastage.
Both of these types of corrosion have been related to steam generators that have operated" on phosphate chemistry.
The caustic stress corrosion type of failure is precluded by controlling the steam generator water chemistry
~ ~
within Technical Specification limits.
Localized wastage or beavering has been eliminated'by removing phosphates from the chemistry control program.
The tubes with indications of NTE, as stated
- before, are in random locations throughout the tube sheet in both steam generators.
ANPP ~ocr not consider it advisable to attempt a
field expansion o~
.hese joints since impurities may already exist in the crevice.
This possibility, and the additional stress to the tubing that would result from the expansion, would impose an increased risk to stress-induced corrosion (as well as non-stress induced corrosion) within the subsequently enclosed crevice.
This condition has occurred in other CE steam generators and has not resulted in unacceptable tube degradation.
This is due to the fact that tubes in CE steam generators are purchased with a
specified maximum tensile strength.
Additionally, the tubes do not undergo a hard step roll into the tube sheet as in the steam generators provided by other NSSS vendors.
These two conditions result in less residual stress in the
- tubes, making them less susceptible to stress corrosion cracking.
The potential risk of degradation to the affected steam generator tubes by not expanding the joints is considered acceptable.
This xs based on the successful operating history
over many years of recirculating steam generators with tube-to-tube sheet crevices that have invoked good chemistry control and impurity cleanup practices.
F.
Foreign Residue in Steam Generator Tubes Samples of the residue underwent chemical analysis by Battelle and ANPP.
Battelle performed X~ay flourescence spectrometry, light optical microscopy, scanning electron microscopy, pyrolysis/gas chromatography, infrared spectroscopy, and neutron activation analysis.
ANPP performed infrared spectroscopy, gamma isotopic analysis, boron analysis and low power light microscopy.
The steam generator tube deposits indicate that an organic material was introduced to the primary system.
During thermal decomposition of the organic material, it became affixed to approximately one hundred tubes.
The organic
- residue, along with crud and boric acid (precipitated during cooldown),
composed the steam generator tube deposits.
Chemical analysis results show a
strong correlation between the tube deposit constituents and herculite (a yellow sheeting material used to cover components to maintain cleanliness and to prevent the introduction of foreign objects into systems)
(yellow) ingredients.
It is likely that this material was present in the hot leg piping or in the steam generator plenum prior to Unit 1 fuel load.
A comparison of the tube deposits (less corrosion products) with the constituents of yellow herculite gave a
reasonable assurance that the material deposits were from yellow herculite.
This data also gave ANPP reasonable assurance that the material was limited to this region of the steam generator since the cadmium and barium (found in herculite) were not activated.
Therefore, the material was not transported through the core.
The potential safety significance of the deposits is that
.residue in the RCS can cau'se detrimental effects to the components.
The constituents
- sulfur, found in both tube deposits and their suspected
- parent, yellow herculite, are those which warrant the most concern in terms of materials degradation.
Chlorides have been associated with stress corrosion cracking of z1rcaloy and austenitic stainless steels at elevated temperatures.
Based on historical RCS chloride levels during plant operations, the specified limit of 0.15 ppm has never been exceeded.
- This, combined with the low operating oxygen
- levels, eliminates the probability of stress corrosion cracking.
- Lead, in significant proportions, can induce transgranular stress corrosion cracking in Inconel 600.
Assuming all available lead was bleached from the herculite, its concentration in the.
RCS would not be detectable.
These levels are not considered significant enough
.to induce corrosion.
Inconel 600 exhib1ts susceptibility to corrosion by sulfur in aqueous environments.
In secondary environments, var1ous toxic forms of sulfur can induce intergranular attack (IGA) and wastage (localized tube dissolution).
The degree of susceptib1lity is due in part to its metallurgical treatment.
Since sulfur appeared to be nonvolatile during elevated temperature decomposition of herculite, the majority remained affixed to tube surfaces probably in association with a heavy metal or the decomposed herculite.
Eddy current testing in the affected tubes showed no degradation.
The presence of non activated species such as cadmium and barium in steam generator tube depos1t indicates that the organic residue found affixed to ID tube surfaces was not transported through the RCS.
A comparison of chemical
0, e
analysis results between the tube deposit, aged herculite (a
herculite sample heated in an autoclave at 575'F to agglomerate) and virgin herculite showed that some species such as lead and chloride were readily discharged into the RCS, but were effectively removed by purification.
Continuous circulation of these would lead to their activation.
No evidence of this was found.
Pyrolysis of herculite leads to the evolution of gaseous products such as hydrogen
- dioxide, and carbon monoxide.
Their relative concentrations in the RCS however would be inconsequential.
Therefore, the transportable species were effectively.removed while a non violatile residue remained fixed on tube surfaces.
Corrective Action Based on videography results, affected tube surfaces are now relatively clean; a
b -reficial consequence of the ECT reinspection of the approximately 100 tubes.
No further cleanup of the steam generators is required.
CE has concurred that tube deposits and impurity releases resulting from the decomposition of the herculite had no adverse affects on steam generator and RCS materials integrity.
No RCS degradation is expected to occur.
A pebble-sized obstruction was discovered in Unit 1
/fl tube when a video probe, placed in a random tube to document the inside diameter tube deposits, encountered a
blockage.
The particle was an angular fragment with a
light-colored appearance.
It appeared as a solid 5/8" wide mass and showed little evidence of erosion.
It is believed to have been'ransported through the
- system, became
- wedged, and was then coated with a soft, powdery material.
t
It was concluded to be non~elated to the foreign residue in the steam generator tubes.
Efforts to remove the obstruction from the tube were successful.
- However, retrieval of the particle for analysis using a
vacuum device was unsuccessful.
It is believed that the object was pulverized in the vacuum.
This was the only case that any other material was found during the ECT examinations.
i if
'ii f
,Figure 17 I
I I
I
+os/ T/o 8/
~
~~
I r C<c D S/OE RZC/RCg4HT/N&
W)P//-.o E//7 R tfh/C E, 4vwDo vv SO p. LEY. 3 pos
~
roy/o~/phd j ~ Co REER
l
~
Jlf fl,
'i
Figure 18 Figure 18
~
~
Horizontal Eggcrate Support
r 0
0
ZV.
~Snmmar An evaluation of the cause of the steam generator tube leak in the PVNGS Unit 1
steam generator and subsequent eddy current evaluations in Unit 1
and Unit 2
has led to the following corrective action:
The tubes in PVNGS Units 1 and 2 that showed indications of wear due to flow induced vibration in the economizer section of the steam generator have been plugged and staked.
The stakes were installed on the cold leg side to prevent severing or collapse of the tube.
Each stake is 189 inches long, 1/2 inch diameter, braided stainless steel cable.
The final number of tubes that were plugged is shown in Table 3.
able 3
Summary ~i Tube Plugging Unit 2 Unit 2 Wep'r Indication Dent Indication Other*
22 6
6 51,
- Five other defects not associated with support wear and one precautionary plug in the corner region.
1he one precautionary plug was installed in a good tube above the patch plate in the cold leg corner region.
This precaution was taken due to ALARA considerations since plugs are difficult to install above the patch plate bolts.
In addition, six of the nine tubes with indications of dents in row 1 of Unit 1 steam generator 81 have been plugged and staked.
W
Removal of the identified part along the divider plate is not possible due to the inaccessability of the secondary side of the System 80 steam generators, both above the tubesheet and above the flow distribution plate.
Since the foreign object is
- wedged, is in a relatively low velocity area, and bears no resemblance to the phenomena of loose parts impacting damage which has led to tube rupture, there is no immediate need to remove the object.
The following actions have been identified as confirmatory actions:
An analysis will be made of the tube lane region to attempt to determine the local flow velocity in the.region of the observed tube wear.
Eddy current examinations will be conducted in Unit 1 during the first refueling outage in areas of concern such as the wear prone areas and in the tubes adjacent to the trapped part in steam generator 81.
An augmented Technical Specification eddy current inspection will be conducted in Unit 2 during the first refueling outage, with an inspection scope similar to the Unit 1 steam generator inspection just completed.
In conclusion, based on the results of the evaluation and the corrective measures which have been implemented, ANPP has determined that power operation of PVNGS Units 1
and 2
can be safely resumed.
ANPP is currently considering the following alternative corrective actions for the PVNGS Unit 3
ANPP will advise the NRC Staff of the chosen alternative at a later date.
II Il (If
IP Based on the Units 1 and 2 tube wear findings, preventatively plug a sufficient number and pattern of tubes to allow operation of Unit 3 to the first refueling outage with no tube leakage.
Determine the amount
'of time that Unit 3
can operate without preventative tube plugging and schedule a
planned outage accordingly.
Preventatively plug a limited number of tubes to allow operation of Unit 3 to a
planned outage prior
- to the first refueling outage.
/
As an additional note, the NRC Staff has requested a reference to how Unresolved Safety Issue (USI) A-4 was addressed for PVNGS.
The following discussion provides the ANPP response to this NRC Staff request.
CESSAR sections 5.4.2 and 10.3.4 discuss the design of the steam generators and secondary water chemistry, respectively-The NRC review of CESSAR as it relates to USI A-4 is documented in Appendix C of the CESSAR SER and in Appendix C of Supplement 1 to the CESSAR SER.
Additionally, the NRC has 'issued Generic Letter 852 which presented the NRC Staff's recommended actions for resolution of the USIs regarding steam generator tube integrity.
ANPP responded to Generic Letter 85&2 in a letter from E.
E.
Van Brunt, Jr.,
ANPP, to Hugh L.
- Thompson, NRC, dated June 21, 1985 (ANPP-32869).
Additionally, ANPP plans to revise the previous response to Generic Letter 85&2 to indicate the extent to which secondary side inspections of the steam generators can be conducted.
This revised response will be provided to the NRC within 30 days.
@f I