Forwards Results of Auxiliary Feedwater Sys Pump 48 H Endurance Tests Required by Item II.E.1.1.B.2 of SER (NUREG-0857)
ML17303A297
Person / Time
Site: Palo Verde 
Issue date: 02/11/1987
From: Haynes J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0857, RTR-NUREG-857 ANPP-40082-JGH, TAC-60509, NUDOCS 8702200067
Download: ML17303A297 (79)


Text

REGULATORY "

ORMATION DISTRIBUTION SYS

~ (RIDS) 7.

ACCESSION NBR: 8702200067 DOC. DATE: 87/02/1'1'"

NOTARIZED:

NO DOCKET ¹ FACIL:STN-50-530 Pal'o Verde Nuclear Station.

Unit 3> Arizona Pub li 05000530 AUTH. NAME AUTHOR AFFILIATlON a

HAYNES'. Q.

Arizona Nuclear Power Prospect (formerly Arizona Public Serv RECIP. NAME RECIPIENT AFFILIATION KNIQHTON, Q. W.

PWR Prospect Directorate 7

SUBJECT:

Forwards results of auxiliary feedwater sos pump 48 4

endurance tests required bg Item II. E. 1. 1. B. 2 of SER (NUREQ-0857).

DXSTRIBUTION CODE:

B001D COPIES RECEIVED: LTR ENCL SI.ZE:

TITLE: Licensing Submittal:

PSAR/FSAR. Amdts 5 Related Correspondence NOTES: Standardized plant. M. Davisi NRR: }Cg.

05000530 RECIPIENT ID CODE/NAME PWR-B EB PWR-B FOB PWR-B PD7 PD

= PWR-B PEICSB INTERNAL:,ACRS 41 ELD/HDS3 IE/DEPER/EPB 36 NRR BWR ADTS ROE> M. L REQ ILE 01

',EXTERNAL: BNL(AMDTS ONLY)

LPDR 03 NSIC 05 COPIES LTTR ENCL 1

1 1

1 1

6 6

0 1

1 1

0 1

1 1

1 1

1 1

1 1

RECIP XENT ID CODE/NAME PWR-B PEXCSB PWR-B PD7 L*

LICITR*>E 04 PWR-B RSB ADM/LFMB IE FILE IE/DGAVT/GAB 21 NRR PWR-B ADTS-NRR/DHFT/MTB RM/DDAMI/MIB DMB/DSS (AMDTS)

NRC PDR 02

'PNL CRUELER COP IES LTTR ENCL 2

2 1

1 2

2 1

1 0

1 1

0 1

1 0

1 1

1 1

1 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 34 ENCL 29

'lp fl,k)

~ li)>> ll, lt

~ >>

VF 3 ~,L, d>>J 'j j.-,l'fk~ X 'jk-'>>

fv '>>

'1,I <<7.

P a "l

>>.k W'3 "ll',>>>>,

<<4<< j II ',

llr I

<<I 11 C ll (k

f<<

k>>tfv F'>>~h Ig<<',j" F>> fl i>>

n

~ f)

I I>

It ~

k>> <<lff lli k h-v"

<)TiJ I, 4.

v ~

~ Ivl r

>>f I<<I

< <<..l

~ k Ii C Ik )

p '>>

V ~

~ >>

~ F v

kk Ik

Arizona Nuclear Power Project P.o. BOX 52034

~

PHOENIX. ARIZONA 85072-2034 February ll, 1987 ANPP-40082-JGH/PGN/98.05 Director of Nuclear Reactor Regulation Attention:

Mr. George W. Knighton, Project Director PWR Project Directorate 87 Division of Pressurized Water Reactor Licensing B U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 3 Docket No.

STN 50-530 Auxiliary Feedwater Pump 48-Hour Endurance Test File: 87-G-056-026

Reference:

Safety Evaluation Report related to the operation of Palo Verde Nuclear Generating Station, Units 1, 2 and 3 (NUREG-0857) dated No'vember, 1981.

Dear Mr. Knighton:

As required by Section 22.2 (II.E.1.1) of the above reference, please find attach-ed the results of the auxiliary feedwater system (AFWS) pump 48-hour endurance tests.

If you have any questions or require additional information, please contact Mr. W. F. Quinn of my sta'ff.

Very truly yours, c/a J.

G. Haynes Vice President Nuclear Production JGH/PGN/rw Attachment cc:

0.

M.

E. E.

E. A.

R. P.

A. C.

De Michele Van Brunt, Jr.

Licitra Zimmerman Gehr 8702200067 870211'DR ADOCK 05000530 PDR go~

I

Essenti'al Steam Turbine Driven Auxiliary Feedwater Pump 48 Hour Endurance Test 3M-AFA-POl As required by ITEM II.E.1.1.B.2 of NUREG 0857, a

48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> endurance test was.

performed on AFA-P01 to verify the pump's ability to provide continuous operation for a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period.

NUREG 0857 further required a cooldown after pump operation to allow bearing temperatures to cool to within 10'F of ambient and a subsequent one hour run.

Acceptance Criteria for operability of AFA-P01 included not exceeding bearing/bearing oil temperature and bearing cap vibration limits while operating within specified environmental temperatures.

Testing was performed in accordance with 91HF-3AF01.

The 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> run commenced November 2,

1986, and continuing until November 5, 1986.

The test was initiated and terminated by manual'peration'f the Control Room handswitch.

Pump bearing/bearing oil temperatures were monitored using the Plant Monitoring System computer display of the following plant instrumentation (see attached graphs for all recorded data):

INSTRUMENT (PMS)

PARAMETER LIMIT MAXIMUMOBSERVED TEMPERATURE

'AFN-TE-59 (AFT59)

AFA-P01 Turbine Outboard Bearing, Temperature 200'F max 154'F AFN-TE-60 (AFT60)

AFA-POl Turbine Inboard Bearing Temperature 200'F'ax 132'F AFN-TE-83 (AFT83)

AFA-P01 Pump Inboard Bearing Temperature 200'F max 156'F AFN-TE-84 (AFT84)

AFA-P01 Pump Outboard Bearing Temperature 200'F max 129'F AFN-TE-85 (AFT85)

AFA-P01 Pump Thrust Bearing Temperature 200'F max 138 F

Pump inboard and outboard bearing cap vibration was monitored using an IRD model 810 portable vibration analyzer and probe.

The following maximum values were observed and are compared to the upper limit (see attached graphs for all recorded data):

PARAMETER AFA-P01 Pump Inboard Bearing Cap Vibration AFA-P01 Pump Outboard Bearing Cap Vibration LIMIT

'5 mils max 5 mils. max MAXIMUMOBSERVED VIBRATION 2.3 mils 3.0 mils Page 1 of 2

4 4 0

4 P

Essential Steam Turbine Driven Auxiliary Feedwater Pump 48 Hour Endurance Test 3M-AFA-P01 AFA-POl Pump Room environmental conditions were monitored with a VAISALA HUMICAP Model HM131.

The following maximum values were observed and are compared to the specified limits (see attached graphs for all recorded data):

PARAMETER AFA-POl Pump Room Temperature LIMIT 104'F max (NOTE)

OBSERVED VALUE 80.8'F Maximum AFA-POl Pump Room Relative Humidity 20-90%

RH 45.0-57.4%

NOTE:

Temperatures up to 120'F.are allowable for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> with a restoration to 104'F over the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

A review of all data recorded during the above endurance testing shows that upper limits on bearing/bearing oil temperatures, bearing cap vibration and pump room temperature were not exceeded.

Page 2 of 2

li 0

II

3H-RFA-P81 STEAN TURBINE DRIVEN ESSENTIAL AUXILIARYFEEDMATER PUMP 48 HOUR ENDURANCE RUN - BEARING TENPERRTURES (DEGREES F)

RUN TINE AFN-TE-59 TURB OB AFN-TE-68 TURB IB AFN-. TE-83 AFN-TE"84 PUNP IB

'PUNP OB RFN-TE-85 THRUST PRESTART.

5 NIN 15 MIN 38 NIN 1

HR Z

HR 3

HR 4

HR 5

HR 6

HR 7

HR 8

HR

,9 HR'8 HR 11 HR 12 HR 13 HR 14 HR 15 HR 16 HR 17 HR 18 HR 19 HR Z8 HR 21 HR 22 HR 23 HR 24 HR 25 HR 26 HR 27 HR 28 HR 29.

HR.

38 HR 31 HR 32 HR 33 HR 34 HR 35 HR 36 HR 37 MR 38 HR 39 HR 48 MR'1 HR.

42 HR 43 HR 44 HR 4S HR 46 HR 47 HR 48 HR 9Z 96 129 1'39'58 152 152 152 1S3.

153 153 152 152 lSZ 151 151 158 151

'151 151 151 151 151 151 152 15Z 15Z 152 153 153 153 152 152 15Z 152 152 152 152 152 154 154 154 154 153 15Z 152 153 153 151 152'53 152 92 186 117 126 138 138 138 1-38 138-138 138 138 138 138'29 1Z9 129 138 138 138

'1'38 138 138 131 1'3l 138 138 138 131 131 131 138 138 131 138 138 138 131 131 131.

131 131 131 131

'131

'131 131 131 138 138 131 131

'87 115 131 144 158 158 151'58 151 151 151 152 152 lSZ 152'52 152 153 153 153 154 154 154 155 154 154'54 154 154 154 154 154 154 154 154 154 154 155 155 154 155 154 154 155 154 155 155 156 154 155 156 156 87 185 115 127'29 128 128 128 128 128 128:

128 127 128 127 127 128 127 127 128 128 128 128 128 128 128 128 128 128 128 1Z8 128 128 129 128 128 128 129 129 1Z9 129 129 129 1Z9 1Z9 128 129 129 iZ9 128 128 128 87 95 1'l 3 122'27 132 133 13Z 133 133 133'33 134 134 134 134 134 135 135 135 136 135 136 136 136'36 136 1'36

'137 137 137 136 136 135 135 1'35 136 136 136 137 137 137 136 137 137 137 137 138 138 138 138 138 POST ENDURANCE TEST 1

HOUR RUN PRESTRRT 5 MIN' HR 131'36 151 128 129 132 91 148 151 93 122 128 91

'114 133-

41 lg e~P I I i

4

.i l4jIJ l

t fefij)IC

, 1PII Il

'4 kc

~

ll4)

K 44 F i ii pe I, J

fl t~, ll 4

nfl II acf e

K 0

I e

, -ft 4 ='I ~

g m K

~ r

'I

~ $

Prf PP IKP r",

peH

3M-AFA-POI STEAM TURBINE ORIVEN ESSENTIAL AUXILIARYFEEDWATER PUMP AFN-TE-59 TURBINE OUTBOARO BEARING TEMPERATURE 180 170 160 1SO 140 13D PU ID 120 I

110 UJ I

100 80 80 70 60 0

2 4

6 8

1D 12 14 16 18 20 22 24 26 28 3D 32 34 36 38 40 42 44 46 48 0

1 TIHE (HOURS) 1 HOUR RUN AFTER CODLOONN

0 0

3M-AFA-PDI STEAM TURBINE ORIVEN ESSENTIAL AUXILIARYFEEOWATER PUMP AFN-TE-6D TURBINE INBDARO BEARING TEMPERATURE 180 170 160 150 140 130 CI 120 PI 110 C,

100 90 80 70 60 0

2 4

6 8

10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0

1 T1HE (HOURS)

-1~HOUR RUN AFTER 'COOLOOWN

lt 0

0

3H-AFA-PDI STEAH TURBINE DRIVEN ESSENTIAL AUXILIARYFEEOWATER PUHP AFN-TE-B3 PUHP INBOARD BEARING TEHPERATURE 180 170 C

160 15D 140

-S

. ))- )

130 120 P-11D 100 90 80 70 60 0

2 4

6 8

1D 12 14 16 18 2D 22 24 26 28 30 32 34 36 38 4D 42 44 46 48 0

1 TINE OIOURS) 1 HOUR RUN AFTER-CODLDOWN

0

~li

3M-AFA-PDI STEAM TURBINE DRIVEN ESSENTIAL AUXILIARYFEEDWATER PUMP AFN-TE-B4 PUMP OUTBDARD BEARING TEMPERATURE 18D 170

=4)

)

S =

16D 150

=o o

o

-t)~=4 o:-

140 o

o=

~

. o.-

I o.:....'o -, -

o==t

=.

o-

. o==o==o~.) ~-

, =

=

O

o

'o

--o e 130 t)-

o o

t -

o

=e o.::- o 120 5

I w

110 o=

.= *==

. = o=-

-o t-o o

100 90 80 o-o

=t o

o I)

C:

.~

70 60 o

c 0

2 4

6 8

10 12 14 16 18 2D 22 24 26 28 30 32 34 36 38 4D 42 44 46 48 D

1 T1ME (HOURS) 1 HOUR RUM AFTER CODLOOWN

4l II

0 3M-AFA-POI STEAM TURBINE ORIVEN ESSENTIAL AUXILIARYFEEOWATER PUMP AFN-TE-BS PUMP THRUST BEARING TEMPERATURE 180 170 160 j

'5Wt'"

~

150 140 130 120 5

110 100 h

80 80 70 60 0

2 4

6 8

10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0

1 TIHE OlOURS) 1 HOUR RUN hFTER COOLOOWN

0

3N-AFA-P81 STERN TURBINE DRIVEN ESSENTIAL AUXILIARYFEEDMATER"PUNP 48 'HOUR ENDURANCE RUN - BERRINS VIBRATION (Nils P'o,P)

'RUN TINE IB BRG OB BRS 5

NIN'5 NIN 38 NIN 1

HR 2,HR 3 HR 4

HR 5 HR 8 HR 7 HR 8

HR 8

HR 18 HR ll HR 12 HR 13 HR 14 HR 15 HR 18 HR 17 HR 18 HR 18 HR 28 HR 21 HR 2Z HR 23 HR 24 HR ZS HR ZB HR 27 HR 28 HR 28 HR 38 HR 31 HR 32 MR 33 HR 34 HR 35 HR 38 HR 37 HR 38 HR 38 HR 48 HR 41 HR 42 HR 43 HR 44 MR 45 HR 46 HR 47 HR, 48 HR Q. 26 8.27 S.ZB S.ZB 8.26 S.ZB 8.25 8.25 8'5 8.25 8.25 S.ZS 8.38 1.38 1 ~ 38 1.88 1.88 1.88 1.38 1.28 1'. 48

1. SS l.58 Z.38 Z.SS 2.18 l.. 88 1 ~ 58 1 ~ 58 1.68 1.58 1.58

. 58'68

.68

.68

.68

.68

.68

.SS'38

.88

.SS,

.48

.68

.88

.38

.38

.38 1 ~ 48 1.48

,8. 28 8.'28 S. 28

'8. Z6

8. Z4
8. Z3
8. Z3
8. 23
8. 23 8'. 23
8. 28
8. ZS
8. Z5 1.78 1.68 1.78 1.78 1.78 2.88 Z.'88 2.18 Z.18 Z.

88'.88 2.78 Z.BS Z'. 48

2. 38 Z.,38 Z. 28'.18 Z.18 Z.18 Z.38 2.48 2.48 Z.38 2.38 2.38 Z 28 Z.SS 2.38 2.28 2.28 2.48 Z.68 1.98 2.88

'Z. 88 2.88 2'8 POST ENDURANCE. TEST 1'OUR RUN 5 NIN 1

HR

8. 88 8.78 l..

48'.28

I,W

'464 4

(>,

e t

4 t 'Cr ~

44 4

I'Wt qa 4

4 It I

p )Eg 894 4 I 4 IIC 4

\\44

'4 IC (41

3M-AFA-POI TURBINE ORIVEN ESSENTIAL AUXILIARYFEEOWATER PUMP PUMP INBOARD BEARING VIBRATION 4.0 3.8 3.6

3. 4 3.2 3.0
2. 8 2.6 o

2.4 2.2 g

2.0 8

1.2 1.0 0.8 0.6

0. 4 0.2 0.0 48 TIHE (HOURS) 0 2

4 6

8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 0 I 1

HOUR RUN AFTER COOLDOWH

II

3M-AFA-POI TURBINE DRIVEN ESSENTIAL AUXILIARYFEEDWATER PUMP PUMP OUTBOARD BEARING VIBRATION 4.0 3.8 44.

3.6

3. 4 3.2 tf I!

3.0

2. 8 2.6 o

2.4 2.2 0

2.

1.8 I-1.6 1.4 1.2 1.0 0,8 0.6 0.4 0.2 0.0 0

2 4

6 8

10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 TIHE (HOURS) 0 1

1 HOUR RUN AFTER COOLOOWH

0 0

0

3M-AFA-P81 STEAM TURBINE DRIVEN ESSENTIAL AUXILIARYFEEDMATER PUMP 48 HOUR ENDURANCE RUN - ENVIRONMENTAL'ATA(X RH/Degrees F)

RUN TIME HUMIDITY'EMPERATURE.

PRESTART 15 MIN 1

HR 8 HR 16 HR 24 HR 3Z HR 48, HR 48 HR

54. 8 57.8 58.5 57.4
55. 8
55. 1
55. 8 45.8 49.4
88. 8

'88. 8

88. 3 75.Z 78.8 76.1 75.8 76.8
75. Z

IL I ~l I li k' I

I 3

3M-AFA-POI TURBINE ORIVEN ESSENTIAL AUXILIARYFEEOWATER PUMP PUMP ROOM RELATIVE HUMIOITY 100 90 80 70 60 D

50 4J0 I

40 30 20 10 0

2 4

6 8

10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0

1 TIME (HOURS) 1 HOUR RUN AFTER COOLOOWN

iO

3M-AFA-POI TURBINE ORIVEN ESSENTIAL AUXILIARYFEEOWATER PUMP PUMP ROOM TEMPERATURE 100 90 80 70 V)

UJ UJ UJ ID 60 50 UJ 5l Ex'0 I~

30 20 10 0

2 4

6 8

10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0

1 TIHE (HOURS) 1 HOUR RUN AFTER COOLOOWN

iO

~O

Essential Motor Driven Auxiliary Feedwater Pump 48 Hour Endurance Test 3M-AFB-P01 As required by ITEM II.E.l.l.B.2 of NUREG 0857, a

48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> endurance test was performed on AFB-P01 to verify the pump's ability to provide continuous operation for a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period.

NUREG 0857 further required a cooldown after pump operation to allow bearing temperatures to cool to within 10'F of ambient and a subsequent one hour run.

Acceptance Criteria for operability of AFB-POl included not exceeding bearing/bearing oil temperature and bearing cap vibration limits while operating within specified environmental temperatures.

Testing was performed in accordance with 91PE-3AF01.

The 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> run commenced on October 2,

1986, and continuing until October 5,

1986.

The test 'as initiated and terminated by manual operation of the Control Room handswitch.

Pump bearing/bearing oil temperatures were monitored using the Plant Monitoring System computer display of the following plant instrumentation (see attached graphs for all'ecorded data):

INSTRUMENT (PMS)

PARAMETER LIMIT MAXIMUMOBSERVED TEMPERATURE AFB-TE-80 (AFT80)

AFB-POl Motor Outboard Bearing Temperature 190'F max 140 F AFB-TE-82 (AFT82)

AFB-P01 Motor Inboard Bearing Temperature 190'F max, 147'F AFB-TE-86 (AFT86)

AFB-P01 Pump Outboard'earing Temperature 200'F max 117'F AFB-TE-87 (AFT87)

AFB-POl Pump Inboard Bearing Temperature 200'F max 163'F AFB-TE-88 (AFT88)

AFB-POl Pump Thrust Bearing Temperature 200'F,max 147'F Pump inboard and outboard bearing cap vibration was monitored using an IRD model 810 portable vibration analyzer and probe.

The following maximum values were observed and are compared to the upper limit (see attached graphs for all recorded data):

PARAMETER AFB-P01 Inboard Bearing Cap Vibration AFB-P01 Outboard Bearing Cap Vibration LIMIT 5.0 mils max 5.0 mils max MAXIMUMOBSERVED VIBRATION 0.9 mils 1.5 mils Page 1 of 2

V It i~

Essential Motor Driven Auxiliary Feedwater Pump 48 Hour Endurance Test 3M-AFB-P01 AFB-'P01 Pump Room environmental conditions were monitored with a

dial thermometer for temperature and a

psychrometer for relative humidity.

The following maximum values were observed and are compared to the specified limits (see attached graphs for all recorded data):

PARAMETER AFB-P01 Pump Room Temperature LIMIT 104'F max (NOTE)

OBSERVED VALUE 79'F WB Maximum 87'F DB Maximum AFB-POl Pump Room Relative Humidity 20-90%

RH 54-70%

NOTE:

Temperatures up to 120'F are allowable for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> with a restoration to 104'F over the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

A review of all data recorded during the above endurance testing shows that upper limits on bearing/bearing oil temperatures, bearing cap vibration and pump room temperature were not exceeded.

Page 2 of 2

fd i~

I(

3M-AFB-P81 MOTOR DRIVEN ESSENTIAL AUXILIARYFEEDWATER 48 HOUR ENDURANCE RUN BERRING TEMPERATURES

<DEGREES PUMP F)

RUN TIME RFB-TE-88 RFB-TE-82 MOTR OB MOTR IB RFB-TE-86 PUMP OB RFB-TE-87 PUMP IB RFB-TE-88 THRUST 0

PRESTART 5 MIN 15 MIN 38 MIN 45 MIN 1

HR 1.25 HR 1.5 HR 1.75 HR 2

HR 2.5 HR 3 HR 4 HR 5 HR 6 HR 7 HR 8 HR S

HR 18 HR il HR 12 HR 13 HR 14 HR 15 HR 16 HR 17 HR 18 HR 19 HR Z8 HR Zl HR ZZ HR 23 HR 24 HR 25 HR Z6 HR 27 HR 28 HR 29 HR 38 HR 31 HR 32 HR 33 HR 34 HR 35 HR 36 HR 37 HR 38 HR 39 HR 48 HR 41 HR 42 HR 43 HR 44 HR 45 HR 46 HR 47 HR 48 HR 88 185 125 128 134 134 135 136 136 136 136 136 1'36 136 136 136 136 136 136 136 136 136 136 136 136 136 136 135 136 136 136 136 136 136 136 136 136 136 136 136 136 136 136 136 136 136 136 136 136 136 136 136 136 136 136 1'36 136 88 117 134 137 148 141 141 141 141 141 141 141 141 141 141 141 141 141 141 141 141 148 148 148 148 148 148 148 148 148 148 148 148 148 148 141 148 141 141 148 148 141 148 148 141 141 141 148 141 141 141 141 141 141 141 141 141 84 181 187 188 112 114 112 113 112 112 112 113 112 1 1,1 1 1 8 1 1 8 1 1 8 1 1 8 1 89 18S 189'8S 189 189 189 188 188 188 189 188 188 188 188 189 188 189 188 188 188 188 188 189 189 189 188 188 188 189 18S 18S 189 118 188 188

18S, 1'l8 189 87 138 152 154 157 157 157 157 158 157 157 157 157 157 157 157 157 157 157 157 157 157 158 157 157 157 157 157 157 158 158 158 158 158 158 158 158 158 158 158 158'59 158 158 159 158 15S 158 15S 159 168 168 158 158 168 159 159 86 112 138 133 139 13S 1'48 141 141 141 142 142 142 142 142 142 142 142 14Z 142 14Z 142 142 142 142 142 142 142 14Z

,143 143 143 143 143 144 144 144 144 144 144 144 144 144'44 144 144 144.

144 144 1'44 145 145 144.

145 146 145 145 POST ENDURRNCE TEST 1

HOUR RUN 148 HR 147 117 147

¹r rt hFr I'

Il "

C.

I.

VJ J

¹ ih ret lf h

fi Ie fF'"'

)

$¹lP L li I

I fte

.J P I rt f'

I l t.

'P Vl I

~ I g FIP I e

F

¹;"'f

'fI R f

'I eg 3¹ ll V

¹

.'h p

Lk h

-J

  • e Pl' V

hv F,I

h 3M-AFB-POI MOTOR DRIVEN ESSENTIAL AUXILIARYFEEDWATER PUMP AFB-TE-BB PUMP THRUST BEARING TEMPERATURE 180 170

=<<

th

~ ~

h g

~

y I-

-4

=Ct-=4 I

tl 4

lh 160 150 h

e:

. W

=

c'. 'h It C

e'

".==

=-

- =

=

tl "I

140

~h -.

130 120 110 I

t

- a h

h 100 90 80 70 0

2 4

6 8

10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0

1 TINE (HOURS) 1 HOUR RUN AFTER COOLDOWN

~~

il

3M-AFB-POI MDTOR DRIVEN ESSENTIAL AUXILIARYFEEDWATER PUMP AFB-TE-B7 PUMP INBDARD BEARING TEMPERATURE 180 170 160 150 140 130 120 W

110 100 90 80 70 60 0

2 4

6 8

10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0

1 TIME SOURS) 1 HOUR RUN AFTER COOLOOWN

iO

3M-AFB-POI MOTOR DRIVEN ESSENTIAL AUXILIARYFEEDWATER PUMP AFB-TE-B6 PUMP OUTBOARD BEARING TEMPERATURE 180 170 160 Il II 150 140 130 120 W

I-110 IJI I

100 A

('0 HA 80 70 60 0

2 4

6 8

10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 TINE (HOURS) 0 1

1 HOUR RUN AFTER COOLOOWN

0

3H-AFB-POI HOTOR DRIVEN ESSENTIAL AUXILIARYFEEDWATER PUHP AFB-TE-82 HOTOR INBOARD BEARING TEHPERATURE 180 170 160

!5 l

lb 150 140 115 o -t -o=-;

. -y II o

dI I

I I

Yi

.,o=- 4=<<

'J 5

o 130 f

I 120 I

110 100 5

I

=o I

I

-'0 70 60 d

jh=- S 0

2 4

6 8

10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0

1 TIME (HOURS) 1 HOUR RUN AFTER COOLOOWN

iO-0

3M-AFB-POI MOTOR DRIVEN ESSENTIAL AUXILIARY FEEDWATER PUMP AFB-TE-BO MOTOR OUTBOARD BEARING TEMPERATURE 180 170 160 l

t t

r t

t(

it t.

il 150 140 I

130 pYIo 120 I

110 I~

100 tt t

(t

,(

1 80 80 70 60 t

ll 0

2 4

6 8

10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0

1 TINE (HOURS) 1 HOUR RUN AFTER COOLOOWN

iO

~O

3M-AFB-P81 MOTOR DRIVEN ESSENTIAL AUXILIARYFEEDWATER PUMP 48 HOUR ENDURANCE RUN - BEARING VIBRATION (Mils

.P to P)

RUN TIME IB BRG OB BRG 5 MIN 15 ',MIN 38 MIN 1

HR 1.2S HR 1.5 'HR

. 1.75,HR 2

HR 2.5 HR 3

HR 4 HR 5 HR 6 HR.

7. HR 8 HR S

HR 18 HR ll HR 12 HR 13 HR 14 HR 15 HR 16 HR 17 HR 1'S HR iS HR 28'R Zl HR 22 HR 23 HR 24 HR ZS HR 26 HR 27 HR 28 HR 2S HR 38 HR 31 HR 32 HR 33 HR 34 'HR 35 HR 36,HR 37 HR 38 HR 39 HR 48 HR 41 HR 4Z HR'3 HR 44 HR 45 HR 46 HR 47 HR 48 HR

8. 78
8. 85 8.75 8.75 8.75 8.75

'8. 7S, 8.7S 8.75 8.75 8.75 8.75 8.75 8.75 8.75 8.,75 8.75 8.7S 8.78:

8. 76 8.78 8.78'.78
8. 76, 8.78 8.74 8.76 8.75 8.7S 8.75 8.7S 8.82 8.75 8.75 8.75 8'5 8.75 8.7S
8. 75 8.73 8.74 8.75 8'5 8.

74.74 8.74

8. 72 8.74 8.7S 8.75 8.

74'.75 8.75 8.75 8.75 1,. 18 1". 38 1'. 28 1.38 1'. 38

1. 38 1.38 1.38 1.38 1.38 1.38 1.38 1.38 1.48 1.38 1'. 38 1.48 1.48

.48

.48

.48

.48

~ 48

.38

.48

.38

.38

.38

.38

.38

.38

.28

.28

.38

.38

.38

.38

.Z8

~ 28

.28

.28

.38

.18

.28

.28

.18

.18

~ 28

.28

.28

.28

~ 18

~ 28

.28

.Z8 POST, ENDURANCE TEST 1

HOUR RUN, HR 1.58

-,"i'.""'3l

(" K;>>vl Jii..

v'vv

.~ >>l l.$.'l <:2,'"I 'i P>>'. 4

'l gg 41 44',I, ii,

)>>g,

-,fg

.- ~"'"j",

>>:". i

~~l('

ij' 1

J

c. 4" ~

((i>>I-

~ 4 l

4,4;.

.>>i. Jl

'1 r",,

II,V

~

'1

'(

II

~ A Q

ai v 1 I

(gv

-'i'I 4I 1

>>r" (I 1

'V.8

',Q

.'4", 0 il

'I',

I

3M-AFB-POI MOTOR ORIVEN ESSENTIAL AUXILIARYFEEOWATER PUMP PUMP OUTBOARD BEARING VIBRATION 4.0 3.8 3.6 3.4 3.2 3.0 2.8 2.6 0

2o 4 2.2 2.0 l.

I-8 6

1.4 1.2 1.0 0.8 0.6 0.4 0.2 0.0 0

2 4

6 8

6 18 20 10 12 14 1

22 24 26 28 30 32 34 36 38 40 42 44 46 48 TINE (HOURS) 0 1

1 HOUR RUN AFTER COOLOOWN

if'l

3M-AFB-POI MOTOR ORIVEN ESSENTIAL AUXILIARYFEEOWATER PUMP PUMP INBDARO BEARING VIBRATION 4.0 3.8 3.6 3.4 3.0 2.8 2.6 o

2.4 2.2 E

2 0 o

8 1.

I-6 1.4 1 ~ 2 1.0 0.8 0.6 0.4 0.2 0.0 0

2 4

6 8

10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0

1 TINE (HOURS) 1 HOUR RUN AFTER COOLOOWN

0

~~

0

3N-,AFB-P81 NOTOR DRIVEN ESSENTIAL AUXILIARY,FEEDWATER PUNP 4B HOUR ENDURANCE RUN - ENVIRONNENTAL DATA <X RH/DEGREES F)

RUN TINE HUNIDITY TEMPERATURE PRESTART 5 MIN 15 HIN 38 NIN 45 BIN 1 'HR.

-1. 25,HR l.5,HR 1.75 HR 2 "HR 2.5 HR 3

HR 4

HR 5 'HR 6

HR 7.'R 8 HR 8

HR 18'R il HR 12 HR 13:HR 14 HR 15 HR 16 HR 17 HR 18 HR 1S HR Z8 HR 21 HR 22 'HR 23 HR 24 HR.

25 HR.

26'R 27'R 28 HR 2S HR 38 HR 31 HR 32 'HR 33 HR 34.HR 35 HR 36 HR 37 HR 38 HR 38 HR 48 HR 41 HR 42 HR 43 HR 44 HR 45 HR 46 HR 47 HR 48 HR

54. 8
54. 8 54.8 54.8
73. 8 72.8 58.

8'8.,8

61. 8 58.'8
68. 8
58. 8
58. 8
68. 8
68. 8
58. 8 SS.8 58.8 68.8 62.5 6Z.5 61.,8'l. 8
64. 8 58.8 61.8 58.8 58.8 58.8
68. 8
68. 8
68. 8
68. 8
58. 8

,68. 8

68. 8
58. 8
68. 8
58. 8
58. 8
58. 8 68;8
68. 8
68. 8

'8.'8'8.

8 68.8 68.8 68.8 58.8 58.8 58.8 61.8

65. 8
65. 8
68. 8
68. 8
77. 8 72.8
73. 8
73. 8
72. 8 72.'8 72

~ 8 7Z.8.

7,1. 8 72. 8 71. 8 72. 8 72. 8 71. 8 71. 8 71. 8 71. 8

'78. 8 71.8 71 '

71'. 8 71.8 71'. 8

78. 8
78. 8
78. 8 71.8
78. 8
78. 8 71.8 78.8 78 ~ 8
78. 8 71

~ 8

78. 8 71.8 71.8
78. 8
71. 8

,78'. 8

71. 8
78. 8
78. 8 78'. 8
78. 8
78. 8
78. 8
78. 8
78. 8 71.. 8
71. 8
71. 8
71. 8
71. 8

'71. 8

78. 8
78. 8 HR
78. 8 POST ENDURANCE TEST 1

HOUR RUN

87. 8

'I<<4,4 'j, jj,tt'V<<jj 4'4 it 4'J'lt'4 ¹ jl,<<¹'J 4 <<

~<<

',~

kgj¹

<< ttlj"jL C j $ 13l 'l; '

4 4 <<4.4 4

'l I 4 '.4 ~ 44",,.¹.

0 tlj <<4

<<ttli'4

'2

<<'tU 4

44¹ ~

4

'. J.

I'g ~

Q RL4 4.(

'll '

'¹, ¹ j4¹,

~

4 I

¹ 4 4

,QR

I 0

'La-LI 4<<~

jt I

I<<

't I'

)<<4*

L<<4 1'j "1

I

<<k

~

~

fj'-4 j'E

. l'. ',

(IP ',

(.'

j1

<<~. L'4

<<,1 p

)4<<

I I¹ I

I I<<

J -

J 4

J','I(

l".i)8

¹4 ~

EiC'l j-¹

<<,41

1144 1

Pj

<<Ij 'I Jlj'I t<<<

,Pg<<

I 1

I

~

I <<

~ ~

I

~ <<

r I

<<<<'l 1

3M-AFB-POI MOTOR DRIVEN ESSENTIAL AUXILIARYFEEDWATER PUMP PUMP ROOM RELATIVE HUMIDITY 100 90 80 70 60 50

)I-40 30 20 10 0

2 4

6 8

10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0

I TINE (HOURS)

I HOUR RUN hFTER COOLOOWN

3M-AFB-POI MOTOR DRIVEN ESSENTIAL AUXILIARYFEEOWATER PUMP PUMP ROOM TEMPERATURE 100 90 80 70 60 50 30 20 10 0

0 2

4 6

8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0

1 T1HE (HOURS) 1 HOUR RUN AFTER COOLOOWN

Non-Essential Auxiliary Feedwater Pump 48 Hour Endurance Test 3M-AFN-P01 As required by ITEM II.E.l.l.B.2 of NUREG 0857, a

48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> endurance test was performed on AFN-P01 to verify the pump's capability to provide conti'nuous operation for a 48.hour period.

NUREG 0857 further required a cooldown after pump operation to allow bearing temperatures to cool to within 10'F of ambient and a

subsequent one hour run.

Throughout this testing, bearing/bearing oil temperatures and bearing cap vibration were monitored to verify that no

,parameter exceeded'ts design limit.

Testing was performed in accordance with 91PE-3AF01.

The 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> run commenced on September 28,

1986, and continuing until October 1,

1986.

The test was initiated and terminated by manual operation of the Control Room

.pump handswitch.

Pump bearing/bearing oil temperatures were monitored using the Plant Monitoring System computer display of the following plant instrumentation (see attached graphs for all recorded data):

INSTRUMENT (PMS)

AFN-TE-79 (AFT79)

AFN-TE-81 (AFT81)

PARAMETER AFN-P01 Motor Outboard Bearing AFN-P01 Motor Inboard Bearing LIMIT 190'F max 190'F max MAXIMUMOBSERVED TEMPERATURE 148'F 148 F

AFN-TE-89 (AFT89)

AFN-P01 Thrust Bearing 200'F max 158'F AFN-TE-90 (AFT90)

AFN-P01 Pump Inboard Bearing 200'F max 123'F AFN-TE-91 (AFT91)

AFN-POl Pump Outboard Bearing 200'F max 129'F Pump inboard and outboard bearing cap vibration was monitored using an IRD model 810 portable vibration analyzer and probe.

The following values were observed and are compared to the upper limit (see attached graphs for all recorded data):

PARAMETER AFN-P01 Inboard Bearing Cap Vibration AFN-P01 Outboard'earing Cap Vibration LIMIT 5.0 mils 5.0 mils MAXIMUMOBSERVED VIBRATION 0.44 mils 0.58 mils A review of all data recorded during the above endurance testing shows that no upper limi,ts on bearing/bearing oil temperatures or bearing cap vibration were exceeded.

a o

~

~

R

'I rt Pl Ct

~ I

3M-AFN-P81 MOTOR DRIVEN NONESSENTIAL AUXILIARYFEEDMATER PUMP 48 HOUR ENDURANCE RUN, iBERRING'EMPERATURES

< DEGREES F )

RUN TIME AFN-TE"79 MOTR OB AFN-TE-81 MOTR IB RFN"TE-8S THRUST AFN-TE-98'UMP IB RFN-TE-9 1'UMP OB PRESTRRT 5 MIN 15 MIN:

38 MIN 45 MIN 1

HR 1.25 HR 1.5 HR 1.75 'HR 2

HR 2.5 HR 3 HR

4. HR 5, HR

'6'R 7 HR 8 HR

'9 HR 18.HR li HR 1Z HR 13 HR 14 HR 15 HR'6 HR 17, HR 18 HR 19 HR 28 HR 21 HR ZZ HR 23 HR 24 HR 25 HR 26 HR 27 HR 28 HR 29 HR 38 HR 31 'HR 32 HR 33 HR 34,HR 35 HR 36 HR 37 HR 38 HR 39 HR 48 HR 41 HR 42 HR 43 HR 44 HR 45 HR 46 HR 47 HR 48 HR 98 113 1Z6 135 138 148 141 141 141 141 141 148 139 13S 139 13S 137 136 137 139 141 142 143

145, 146 146 147 147 146 145 145 144 144 142 141 1.39, 138
137, 137 136 135 136'37 13S 141 143 145 1'45 146 146 148 148 147

'146 145 144 142 89 115 129 137 148 148 141 141 141 1'41 148 139 1'39 148 148'48 1'39 136 138 148 141 142 143

'1'45 147 146 147

'47 145 144'44 143 144 144 1'42 138 138 1'38 137 136'36 136 139'43 14344 146 146 148 148 148 148 147 147 145 143 148 84 187'Z8 132

. 136 137 144 144 143 144 138 138 1'38 145 146 146 145 138 145 146 148 147 149'51 153 151 153 152 158 151 151 158 151 152 151 149 149 149 148 147 147 146 149 154 154 154'55 155 157

'157 157 157 156 158 152 153 145 7985.

98 187

~ 118 118 112 111 112 112 111 118ill ill 112 112 111 187 189 1 1'1 1 1 3

.113 115 118 128 118 128-119 117 117 116 116 116 118

,115 11'8 118 118 118 188'88 188 113 118 118 118 128 128 122 122 122 123 122 123 119 117 113 8Z 88 181 112 115 116 118 118

'119 119 118 117

117, 118 1'18 1'19 118 115 117.

128 121 121 123 126 lZS 126 128 128 125 125 1Z5 125 125 126 124 121 1Z8 128 128 118 119

'118 122 127 128 127 129 128

'131 131 138 138 138 131 127 125 122 POST ENDURANCE TEST, 1

HOUR RUN HR 142 145 146 128

hl

~'..

I)y <<<< I'I I~ Jill...

'<<M<<

I If a]I>>

't'Jl

~Ii

'aIra

1l rl

~ ',I, p If'I Fgf' P I VI;,Ill PM' I'I' i<<I

'<<a>>I G

V 1

'it

'>>I If 1

I'I n

w>>a I>>

)

V If la' 1

I"I R

11<<

I!,

IP I

IMI,II'f jl 1

~ I>>

M I

a*

n-If

>> II

'I" If Jf a.'FMi r

V 1r'I M

hl h<<"

If J

I a'3,"h L I

M. *1 II' f

aw <<

i>>1

"=" ~ <<t P

I, il a

>>af I ff

'll

,a I 4>> ll

'.ii L Iia<<

Val j

M Ir>> "f a 'I I

ff a

'l ~

la>> I M I V>>

I I

C I

iK<

. 'I 1 M

ifc!

~

>>I V

IM h

F3@ I I

,I If' i',r) ta III4

3M-AFN-P01 MOTOR ORI YEN NONESSENTIAL AUXILIARYFEEOMATER PUMP AFN-TE-91 PUHP OUTBOARD BEARING TEHPERATURE 180 170 160 150 140 e

It e

1 1

130 UJ CI 120 P-110 I

100 C

90 80 70 p

n 60 0

2 4

6 8

10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0

TINE (HOURS) 1 HOUR RUN AFTER COOLOOWN

0 Cl 0

3M-AFN-PDI MDTOR ORIVEN NONESSENTIAL AUXILIARYFEEOWATER PUMP AFN-TE-90 PUMP INBDARD BEARING TEMPERATURE IBD 170 I-.==- p

-.r

- - k=-L 4

=,"1-;I k Ct =)=A e

r 11 160

]5D 14D

ct= ce at r

130 120 5

110 K

UJ I

10D C

I0 BD h

70 Ct 60 Ct 0

2 4

6 8

10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0

1 TINE (HOURS) 1 HOUR RUN AFTER COOLOOW

0 0

3M-AFN-POI MOTOR DRIVEN NONESSENTIAL AUXILIARYFEEDWATER PUMP AFN-TE-89 PUMP THRUST BEARING TEMPERATURE 180 h:-

h '-"

o 170 160 150 140 g

130 120 I

110 100 90 80 70 60 0

2 4

6 8

10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 TINE (HOURS) 0 I 1

HOUR RUN AFTER COOLOOWN

il il

3M-AFN-POI MOTOR ORI YEN NONESSENTIAL AUXILIARYFEEOWATER PUHP AFN-TE-BI MOTOR INBOARD BEARING TEHPERATURE 180 170 4

C 160

))

l) ',

= ))= "

150 140 w

130 0X III I

120 110 100

)?

I

)?

C

'f

?"

4

'.)

H

)

90 80 70

)?

d

?

=:%

=: h

?

1

)'

~

)=. ~

60

=I

  • =

0 2

4 6

8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0

1 TINE (HOURS) 1 HOUR RUN AFTER COOLOOWN

~O

~O

3M-AFN-POI MOTOR ORIVEN NONESSENTIAL AUXILIARYFEEOWATER PUMP AFN-TE-79 MOTOR OUTBOARO BEARING TEMPERATURE 180 170 e.

4 16D 150 14D JIJ 130 120 I-110 100 90 8D v

70 60 0

2 4

6 8

10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 0

1 TINE (HOURS) 1 HOUR RUN AFTER COOLDOMN

3M-AFN-P81 NOTOR.'DRIVEN'ONESSENTIAL AUXILIARYFEEDWATER PUNP 48 HOUR ENDURANCE RUN BEARING.VIBRATION (Ni1s P to P)

RUN TINE 5 MIN 15 NIN 38'IN 1

HR 1.25 HR 1.5 HR 1.7S HR 2

HR 2.5 HR 3 'HR 4 HR 5

HR 6 HR 7 HR 8 HR 9

HR 18 HR ll HR 12 HR 13 HR 14 HR 15 HR 16 HR

'17 HR 18 HR lS HR 28 HR Zl HR 22 HR 23 HR 24 HR 25 HR 26 HR 27 'HR 28 HR 29 HR 38 HR 31 HR 32 HR 33 HR 34 HR

,35 HR 36 HR 37 HR 38 HR 39'R 48 HR 41 HR 42 HR 43 HR 44 HR 45 HR 46 HR 47 HR 48 HR IB BRG'.

38 8.48,

8. 38
8. 38 8.48
8. 38

'8. 38

8. 48
8. 48
8. 48
8. 48 8.48 8.38 8.48 8.42 8.a8 8.4Z 8.

43'8.43 8.a8 8.44 8.42 8.42 8.48 8.48 8.'a8 8.42 8.'a8

8. 42
8. 42
8. 48

'8. 48

8. 48 8.48 8.42 8.4Z 8.48
8. 48 8.42 8.4Z 8.42 8.42 8.42 8.42
8. 42 8;42
8. 42
8. 48
8. 48
8. 48
8. 42
8. 4Z

.8. 4Z

8. 4Z
8. 42 OB"BRS
8. 56
8. 58
8. 56
8. 54 8.55 8.56 8.54 8.'56
8. 54
8. 55
8. 54
8. 55
8. 56
8. 56
8. 55
8. 55 8 ~ 55
8. 55
8. 55

.8. 56

8. 54
8. 55
8. 53
8. 54
8. 54
8. 54
8. 56
8. 56
8. 58
8. 56
8. 56 8.'55
8. 56 8.,56'.58
8. 58
8. SB
8. 56
8. 56
8. 56
8. 56
8. 56
8. 5Z
8. 52
8. SB

'8. 54

8. 54
8. 56
8. 56 8;

58'.56

8. 58
8. 58 8.56

'8. 56 POST ENDURANCE TEST 1

HOUR RUN HR

8. 42
8. 54

>> ) I IIII I fi 1 II,"I I'

~I I J j>>

'%i

~ ~ jj I~

e.

1) 1

)

gT I

I.

I ~

,p(>>

f

~

)

a'

3M-AFN-POI MOTOR ORIVEN NONESSENTIAL AUXILIARYFEEDWATER PUMP PUMP INBDARO BEARING VIBRATION 4.0 3.8 3.6 3.4 3.2 3.0 2.8 2.6 0

2e 4 2.2 2.0 l.

I 8

6 1.4 1.0 0.8 0.6 0.4 0.2 0.0 32 34 36 38 40 42 44 46 48 TIME (HOURS) 0 2

4 6

8 10 12 14 16 18 20 22 24 26 28 30 0

1 1

HOUR RUN AFTER COOLDOWN

Ik 0

3M-AFN-POI MOTOR DRIVEN NONESSENTIAL AUXILIARYFEEDVATER PUMP PUMP OUTBDARD BEARING VIBRATION 4.0 3.8 3.6 3.4 3.2 3.0 2.8 2.6 IL o

2.4 2.2 0

1.8 l-1.6

)

1.4 1.2 1.0 0.8 0.6 0.4 0.2 0.0 0

2 4

6 8

10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 TINE (HOURS) 0 1

1 HOUR RUN AFTER COOLOOWN

~ ~

if' 0