ML17300A344
| ML17300A344 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 08/15/1986 |
| From: | Haynes J ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Knighton G Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-2.E.1.1, TASK-TM ANPP-37767-JGH, TAC-60509, NUDOCS 8608200173 | |
| Download: ML17300A344 (4) | |
Text
DOCKET 05000528 05000529 05000530
SUBJECT:
Informs that TMI-2 lessons learned implementation rept amended h incorpov ated into FBAR. Auxiliary feedtoater pump endurance test v esults meet v equiv ements of NUREQ-0737 5 mill be omitted fv om FSARi per 8305'Oi ltr.
DIBTRIBVTION CODE:
AO46D COPIEB RECEIVED: LTR I ENCL Q BI ZE:
TITLE:
OR Submittal:
TMI Action Plan Rgmt NUREQ-0737 Zc NUREQ-0660 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDB)
ACCESSION N8R: 8608200173 DOC. DATE: 86/08/15 NOTARIZED:
NO FACIL:BTN-50-528 Pal o Vev'de Nuc 1eav Stati one Unit ir Arizona Pub Ii BTN-50-529 Palo Vev'de Nucleav Stations Unit 2i Av izona Pub li BTN-50-530 Palo Verde Nuclear Station>
Unit 3i Av i zona Pub li AUTH. NAME AUTHOR AFFILIATION HAYNES> S, Q.
Av izona Nuclear Paver Pv object
< formerly Av i zona Public Serv RECI P. NAME RECIPIENT AFFILIATION KNIQHTQN> Q. N.
PNR Prospect Div ectorate 7
NOTES: Btandav'd ized plant. M. Davis> NRR: 1Cg.
Standav dized plant. M. Davisi NRR: 1Cg.
Btandav di zed plant. M. Davis'RR: 1Cg.
05000528 05000529 05000530 REC 1P IENT ID CODE/NAME PNR-8 ADTS PNR-8 PEICS8 PNR-8 PD7 LA LICITRA>E PNR-8 RB8 CQPIEB LTTR ENCL RECIPIENT ID CODE/NAME PWR-8 E8 PNR-8 FO8 PWR-8 PD7 PD Oi PWR-8 PEICS8 COP IEB LTTR ENCL INTERNAL ACRB AEQD/PT8 IE/DEPER DIR NRR 8WR ADTB NRR PNR-A ADT NRR/DBRO EMRI RQN5 34 10 1
1 33 S
T ADM/LFM8 ELD/HDS3 IE/DEPER/EP8 NRR PAULSONi N.
-8 ADTS Q FIL 04 EXTERNAL: LPDR NBIC NOTES:
03 05 NRC PDR 02 TOTAL NUM8ER QF CQPlEB REQUIRED:
LTTR 42 ENCL
hA little+ '
~ 3 '
I' I
II t
" I f'ae333
~
p 3t
le
~I 3,.33 ',, 'jt 33 tt pe
~ g E 3
rr3 e
3 tv 3
~h I
t3,k, hr V
~N'll l I
'It, Pl~)PI l
Jl lt3 3
Arizona Nuclear Power Project P.o. BOX 52034
~
PHOENIX, ARIZONA85072-2034 August 15, 1986 ANPP-37767-JGH/JKO/98.05 Director of Nuclear Reactor Regulation Attention:
Mr. G.
M. Knighton, Project Director PWR Project Directorate ¹7 Division of Pressurized Mater Reactor Licensing B
U.S. Nuclear Regulatory Commission Mashington, D.C. 20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 and 3
Docket Nos.
STN 50-528 (License NPF-41)
STN 50-529 (License NPF-51)
STN 50-530 NUREG 0737 Item II.E.l.l File: 86-A-056-026 86-A-005-419.05
Reference:
Letter to G.
M. Knighton, NRC, from E.
E.
Van Brunt, Jr.,
ANPP, dated September 1,
1983 (ANPP-27714).
Subject:
PVNGS Auxiliary Feedwater Pump Endurance Test Results.
Dear Mr. Knighton:
In the above referenced
- letter, ANPP committed to include the PVNGS auxiliary feedwater pump endurance test results in a future amendment to the PVNGS TMI-2 Lessons Learned Implementation Report (LLIR).
At the present
Since these endurance test results have been submit-ted on the docket as required by the referenced letter and this meets the require-ments'f NUREG 0737, we do not intend to include the endurance test results in the FSAR.
If you have any further questions, please contact Mr. M. F. Quinn of my staff.
Very truly yours, 8608200173 860815 PDR ADOCK 05000528 P
PDR J.
G. Haynes Vice President Nuclear Production JGH/JKO/rw CC:
0.
M.
E. E.
E.
A.
R.
P.
A. C.
De Michele Van Brunt, Jr.
Licitra Zimmerman Gehr
J\\
It