ML17303A295
| ML17303A295 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 02/10/1987 |
| From: | Knighton G Office of Nuclear Reactor Regulation |
| To: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| References | |
| NUDOCS 8702200052 | |
| Download: ML17303A295 (6) | |
Text
Docket No.:
50-530 Mr. E.
E.
Van Brunt, Jr.
Executive Vice President Arizona Nuclear Power Project Post Office Box 52034 Phoenix, Arizona 85072-2034
Dear Mr. Van Brunt:
DI TRIBUTION oc et Fi e
NRC PDR LPDR PD7 Reading EALicitra MDavis
- Attorney, OGC - Bethesda EJordan BGrimes JLee
SUBJECT:
PALO VERDE UNIT 3 COMPLETION CERTIFICATION One of a number of actions you have scheduled to be completed prior to the licensing of the subject unit is the issuance of your letter certifying, that the unit is complete as described in the safety analysis reports reviewed and approved by the Nuclear Regulatory Commission and requesting a license for low power operation.
Since this is the third unit of a new Combustion Engineering design, we believe that there are a number of areas that would be of significant interest in issuance of the low power operating license.
These
- areas, listed in the enclosure, have been discussed in the past and deserve to be addressed prior to licensing.
Your discussion of each area should include consideration of its impact on licensing Uni,t 3.
There has been discourse on all of these areas in the past so that your discussion requested here should be of a summary nature for each area with appropriate conclusions.
Sincer ely,
/~/
George W. Knighton, Director PWR Project Directorate No.
7 Division of PWR Licensing-B
Enclosure:
As stated cc:
See next page
- Previous concurr o
.b PD7*
p MDavis/yt hton 2/10/87 2//0/87 8702200052 870210 PDR ADOCK 05000530 A
~l le I
~ -L w
I ww w
ln "i H
H l
l w
H ll H,l Hwf f I*
I wf t
w wf n
~
W II
'w q
g w) w
Mr. E.
E.
Van Brunt, Jr.
Arizona, Nuclear Power Project Pal o Verde CC:
Arthur C. Gehr, Esq.
Snell 8 Wilmer 3100 Valley Center Phoenix, Arizona 85073 Mr. James M., Flenner, Chief Counsel Arizona Corporation Commission 1200 West Washington Phoenix, Arizona 85007 Charles R. Kocher, Esq. Assistant Council James A. Boeletto,,Esq.
Southern. California Edison Company P. 0.
Box 800
- Rosemead, California 91770 Mr. Mark Ginsberg Energy Director Office of Economic Planning and Development 1700 West Washington - 5th Floor Phoenix, Arizona 85007 Mr. Wayne Shirley Assistant Attorrey General Bataan Memorial Building Santa Fe, New Mexico 87503 Mr. Roy Zimmerman, U.S. Nuclear Regulatory Comnission P. 0.
Box 239 Arlington, Arizona 85322 Ms. Patricia Lee Hourihan 6413 S. 26th Street Phoenix, Arizona 85040 Regional Administrator, Region V
U. S. Nuclear, Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Kenneth Berlin, Esq..
Winston 5 Strawn Suite 500-2550'M Street, NW Washington, DC 20037 Ms. Lynne Bernabei Government Accourtabili.ty Project of the Institute for Policy Studies 1901 gue Street, NW Washington,
.DC 20009 Mr. Ron Rayner P. 0.
Box 1509
- Goodyear, AZ 85338 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.
7910 Woodmont Avenue Suite 1310
- Bethesda, Maryland 20814
P
/ II
Encl osure Palo Verde, Unit 3 Readiness Plant Status (Construction 5 Preoperational Testing)
Power Ascension Program Schedule Organizatior. for 3 Unit Operation Corporate Hanagemert Plant Staffing Lessons Learned from Units I and 2
Plant Design (e.g.,
condenser
- leaks, low flow feedwater control, steam bypass control system)
Testing Program and Plant Operations (e.g.,
personnel errors, plant procedures, emergency operating procedures)
Communications (between units and with other utilities)
Selected Issues (e.g.)
Diesel Generator Evaluation ard Repair Evaluation of Unit I Steam Generator Tube Leak Post Trip Review Process Security Program Improvements Status of PRA on Single Failure Vulnerability
.4>,
Qi a a.r>>.
Jl...wv
.,~,e