ML17300B145

From kanterella
Jump to navigation Jump to search
Forwards Results of Chemical Analysis & Mechanical Testing of Samples of safety-related Fastener Matls Per Operations/ Maint Insps on 861201-12.Written Statement,Containing Listed Items,Requested within 30 Days of Ltr Date
ML17300B145
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/18/1987
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
NUDOCS 8712230017
Download: ML17300B145 (8)


Text

~

~a

~

~

~R REg0

~4 0~i 0

C O

I L'y

/~

~O

++**+

UNITEDSTATES NUCLEAR REGULATORY COIVIMISSION WASHINGTON, D. C. 20555 December 18<

1987 Docket Nos. 50-528,

529, 530 Arizona Public Service ATTN:

Mr. E.

E.

Van Brunt, Jr.

Executive President Arizona Nuclear Power Project P. 0.

Box 52034 Phoenix, Arizona 85072

Dear Mr. Van Brunt,

Jr.:

As you know, during the operations/maintenance inspection conducted December 1-12, 1986, at your Palo Verde facility, samples of, safety-'elated fastener materials were obtained for subsequent chemical analysis and mechanical testing.

The results of this testing are enclosed.

The bolts designated as 6177-1 through 6177-14 in the report are the samples taken from the Palo Verde facility.

Your attention is directed to the bolts designated as 6177-5 through 6177-9.

The head markings on these bolts indicated they were SAE J429 Grade 8 bolts; however, the bolts failed to meet the chemical requirements of the SAE J429 specification (i.e., the five-bolts were found to be Grade 8.2).

We understand from discussions between Bill Craig of your staff and Ed Baker of the Vendor Inspection Branch that you were informally notified of the results of the testing by Region V staff and have taken some actions on this matter.

We apologize for the delay in formally transmitting the test results.

Please provide us within 30 days of the date of this letter, a written statement containing:

(1)

A description of steps that have been or will be taken to address this problem including a description of the intended application for these fasteners; (2)

A description of steps that have been or will be taken to prevent recurrence; and 1

(3)

The dates your corrective actions and preventive measures were or will be completed.

In addition, please identify the supplier(s)/manufacturer(s) who furnished the five bolts and also the supplier(s)/manufacturer(s) of fasteners who are currently on the APS Approved Vendor List.

87 i22300 17 8 OOOMg

'71218 T

I, PDR ADOCK o pDR,'~

Q h

I I

II I'

,y I

~

~ ~

~

0 Arizona Public Service December 18, 1987 The response requested by this letter is not subject to the clearance procedures of the Office of Management and Hudget as required by the Paperwork Reduction Act of 1980, PL96-511.

If you have any questions concerning this matter, please contact M. Licitra at (301) 492-8599.

Sincerely,

Enclosure:

Test Results (F-6177-1)

Dennis M. Crutchfield Director Division of Reactor P ojects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Arizona Public Service December 18I 1987 The response requested by this letter is not subject to the clearance procedures of'he Office of Management and Budget as required by the Paperwork Reduction

" Act of 1980, PL96-511.

If you have any questions concerning this matter, please contact M. Licitra at (301) 492-8599.

Sincerely,

Enclosure:

Test Results (F-6177-1)

Dennis H. Crutchfield, Director Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation DISTRIBUTION:

ll R

Docket File No. 50-528,

529, 530 JPartlow BGrimes JStone EBaker JConway lR NANE Oway:tt i

DATE: /o/87 RIS:

WR EBake

~

JStone I

~

>>/ll/87: k/

/87

"/

/87

D DRP S

JPar

~,/

D utchfield:

W

/87

5/

87 IZ gy

J II'

~ I

)'

4 Arizona Public Service December 18'987 The response requested by this letter is not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL96-511.

If you have any questions concerning this matter, please contact M. Licitra at (301) 492-8599.

Sincerely,

Enclosure:

Test Results (F-6177-1)

Dennis M. Crutchfield, Director Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation ISTRI BUT ION:

RC R

Docket File No. 50-528,

529, 530 JPartlow BGrimes Jhtone EBaker JConway NAME away:tt

%W DATE: / 0/87

~

CP

EBake+
JStone
>> lt 87: k 87 RIS:

~ L/

874 WW W

WWW

JPar W
D utchfield:

W

~ W&W 87:

Z.

87

f