REGULAT INFORMATION DIBTRIBUTIO YSTEM (RIDS)
ACCESSION NOR: 8709100086 DOC. DATE: 87/08/31 NOTARIZED:
NO DOCKET 0
. FAQIL:STN-50-528 Palo Verde Nuclear Station>
Unit ii Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Stations Unit 2i Arizona Pub li 05000529 STN-50-530 Palo Verde Nuclear Stations Unit 3i Arizona Pub li 05000530 AUTH. NAME AUTHOR AFFILIATION HAYNES'.G.,
Arizona Nuclear Poeer Prospect (formerlj Arizona Public Serv RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Informs NRC of recent developments re charging pump blocks.
Util currently pursuing mf g of clamp supported bg C-E analysis 5 intends to use clamped charging pump block as spare until nee spares received from vendor.
DISTRIBUTION CODE:
A001D COPIES RECEIVED: LTR / ENCL 0 SIZE:
TITLE:
OR Submittal:
Gener'al Distribution NOTES: Standardized plant.
Standardi zed p lant.
Standard i z ed plant.
05000528 05000529 05000530 RECIPIENT ID CODE/NAME PD5 LA LICITRAiE COP IEB LTTR ENCL REC IP IENT ID CODE/NAME PD5 PD DAVIS' COP IEB LTTR ENCL 5
1 INTERNAL: ACRB NRR/DEBT/ADB NRR/DEBT/MTB NRR/DOEA/TSB OGC/HDS1 RES/DE/E IB EXTERNAL:
EG8cG HRUBKEa B NRC PDR 6
1 1
1 1
1 ARM/DAF/LFMH NRR/DEBT/CEB NRR/DEBT/RBB ILRB EG FILE 01 LPDR NBIC NOTES:
TOTAL NUMBER OF COPIES REQUIRED:
LTTR O'P ENCL
ii
'1 t
1I tl I
Arizona Nuclear Power Project P.o. BOX 52034 o
PHOENIX. ARIZONA85072-2034 August 31, 1987 161-00470-JGH/BJA U.S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C. 20555
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 and 3cv ~~b Docket Nos.
STN 50-528 (License No. NPF-41)
STN 50-529 (License No. NPF-51)
STN 50-530 (License No. NPF-65)
Update on Charging Pump Blocks File: 87-A-056-026 ln 'light of the NRC Staff's past interest in the charging system at
- PVNGS, ANPP would like to take this opportunity to inform the NRC Staff of recent develop-ments concerning the charging pumps.
During the first cycle of operation at PVNGS Unit 1, two charging pump blocks have developed internal cracks (not thru-wall cracks) and were removed from service.
The first of the cracks was dis-covered in the Unit 1, "B" charging pump in October, 1986.
This cracked block was replaced with the only spare block that ANPP had at that time.
The second cracked charging pump block was found in March, 1987.
This crack was found in the Unit 1, "A" charging pump.
This charging pump block was removed from service and replaced with the block from the Unit 3, "B" charging pump.
Xt should be noted that the number of hours of pump operation before crack discovery at PVNGS is not unexpected based upon previous experience with this type of pump at other nuclear power plants.
ANPP has been experiencing difficulties in procurement of spare charging pump blocks for use in the PVNGS units.
After the second cracked block was
- found, ANPP borrowed a spare block from the Millstone Nuclear Power Plant as none were available from the vendor at that time.
The Millstone block was used to replace the Unit 3, "B" charging pump block.
ANPP has placed an order for 6
spare blocks.
- However, the first of these blocks is not expected to be on-site until
- March, 1988.
After March,
- 1988, ANPP expects to receive one spare block per month until all of the ordered blocks are received.
Due to these procurement
- problems, ANPP contracted Combustion Engineering (CE) to perform an analysis and manufacture the necessary equipment to allow the use of one of the existing, cracked charging pump blocks that has been removed from service.
The Unit 1, "B" charging pump block 'was selected for'his analysis.
This pump block had a crack in the cylinder bore that did not reach the surface of the pump block.
8709i00086 87083i PDR I ADOCK 05000528 P
PDR oo/
io
L
",rg t
1
U.S.
NRC Document Control Desk page 2
161-00470-JGH/BJA August 31, 1987
~
~
~t~l CV
)
C~
t p
cB Since this pump block had not developed a thru-wall crack, the block is still operable and capable of performing its design function.
The CE analysis is based upon the use of.a clamp that will allow for a long term operation of the pump while retarding propagation of the crack.
The analysis indicates that the clamping of the cracked block will allow'he pump to fulfillits intended functions during normal and abnormal operations of the charging pump.
ANPP is currently pursuing the manufacture of the clamp that is supported by the analysis.
ANPP intends to use the clamped charging pump block as a spare that would be available for immediate installation until such time as new spares are received from the vendor.
If you have any additional questions on this
- matter, please contact Mr. M. F. Quinn of my staff.
Very truly yours, J.
G. Haynes Vice President Nuclear Production JGH/BJA/rw CC: