ML17300A982

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Re CEA Reactivity Integrity Program Implementation
ML17300A982
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 08/07/1987
From:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17300A981 List:
References
NUDOCS 8708170427
Download: ML17300A982 (2)


Text

t I ADMINISTRATIVE CONTROL NOTE; The licensee shall perform a secondary water chemistry monitoring and control program that is in conformance with the program discussed in Sec-tion 10.3.4. 1 of the CESSAR FSAR or another NRC approved program.
m. Post-Accident Sampling System implementation.*
n. Settlement Monitoring Program implementation.

NOTE: The licensee shall maintain a settlement monitoring program throughout the life of the plant in accordance with the program presented in Table 2.5-18 of the PVNGS FSAg or another 'Xv ~q~+

NRC approved program.

gone.%iv 5c

o. CEA kyat Pr'ogram implementation a.X(c.r awicinXf~ 4oo 4 or a.g~ a.a. t'a oa ~, c.a~~

NOTE:

+he-@pe~ 'ection The licensee shall per'form a CEA symmetry test ~@ra 4.2.2 of the PVNGS SER dated November 11, 1981.

4 ac <o~Q4 w ~uvc vww 4q qP n.v. g+%%-%wqQ c6< <<you qs

p. Fuel Assembly Survdi1 1 ance Program Implementation 4 z gg~q.~

NOTE: The licensee shall perform a fuel assembly surveillance program in con-formance with the program discussed in Section 4.2.4 of the PVNGS SER dated November 11, 1981.

6.8.2 Each program or procedure of Specificqtion 6.8. 1, and changes thereto, shall be reviewed as specified in Specification 6.5 and approved prior to implementation. Programs, administrative control procedures and implementing procedures shall be approved by the PVNGS Plant Manager, or designated alternate

'ho is at supervisory level or above. Programs and procedures of Specifica-tion 6.8. 1 shall be reviewed periodically as set forth in administrative procedures.

6.8.3 Temporary changes to procedures of Specification 6.8. 1 above may be made provided:

a ~ The intent of the original procedure is not altered.

b. The change is approved by two members of the plant supervisory staff, at least one of whom is a Shift Supervisor or Assistant Shift Supervisor with an SRO on the affected unit.

C. The change'is documented, reviewed in accordance with Specification 6.5.2 and approved by the PVNGS plant manager or cognizant department head, as designated by the PVNGS plant manager, withi n 14 days of implementation.

6.8.4 The following programs shall be established, implemented, maintained, and shall be audited under the cognizance of the NSG at least o'ce per 24 months:

a~ Primar Coolant Sources Outside Containment A program to reduce leakage from those portions of systems outside containment that could contain highly radioactive fluids during a serious transient or accident to as low as pdactical levels. The systems include the recirculation portion of the high pressure safety injection system, the shutdown cooling portion of the low pressure safety injection system, the post-accident sampling subsystem of the "Not requir ed until prior to exceeding 5X of RATED THERMAL POWER.

PALO VERDE - UNIT 1 6-14 8708i70427 870807 PDR ADO'5000528 P PDR Q.NTIRGILILEP.BY..U$EIR.