Forwards Request for Addl Info Re Section 2.7.1.1 of 860418 Rept Summarizing Results of Piping Verification Test Program.Date That Info Will Be Submitted Requested within 2 Wks of Receipt of Ltr
ML17300A978
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 08/10/1987
From: Licitra E
Office of Nuclear Reactor Regulation
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
NUDOCS 8708120271
Download: ML17300A978 (4)


Text

AUG 10 1s87 Docket No.:

50-528 Nr. E.

E.

Van Brunt, Jr.

Executive Vice President Arizona Nuclear Power Project Post Office Box 52034 Phoenix, Arizona 85072-2034

Dear Mr. Van Brunt:

DISTRIBUTION

~EALL i NRC 5 Local PDRs PDb5 Rdg/MHartzman OGC-Bethesda GHolahan/EJordan JPartlow/JLee ACRS (10)/MDavis

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION - PALO VERDE UNIT 1 PIPING VERIFICATION TEST

SUMMARY

By letter dated April 18, 1986, you provided a report which summarized the results of the piping verification test program performed at Palo Verde Unit l.

In Section 2.7.1.1 of the report, the description of the tests indicates that the acceptability of the experienced vibrations was determined by visual inspection and supplemented by portable vibrometer readings.

In order that we may complete our review of that report, we request that you provide a detailed description of the procedure which was used to verify that the s)ress values did not exceed one half of the alternating stress intensity at 10 stress

cycles, as defined in Section III of the ASME Code.

Within two weeks of receipt of this letter, provide the date by when the requested information will be submitted.

If you have any questions regarding this letter, please let me know.

The reporting and/or recordkeeping requirements of this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely, Optggl~mt (\\fP'w~g g'P1 E.A. Limni)la E. A. Licitra, Senior Project Manager Project Directorate V

Division of Reactor Projects-III, IV, V and Special Projects cc:

See next page DRS /P NRR E 1E EALicitra TMa sh 8//o/87 8/ Jg/87 DV

'ton 8/Z;4 /87 8708120271 870810 PDR ADOCH, 05000528 i

P PDR

P fl

Mr.

E.

E.

Van Brunt, Jr.

Arizona Nuclear Power Project Palo Verde cc Arthur C.

Gehr, Esq.

Snell 8 Wilmer 3100 Valley Center

Phoenix, Arizona 85073 Mr. James M. Flenner, Chief Counsel Arizona Corporation Commission 1200 West Washington
Phoenix, Arizona 85007 Charles R. Kocher, Esq. Assistant Council James A. Boeletto, Esq.

Southern California Edison Company P.

0.

Box 800

Rosemead, California 91770 Mr. Mark Ginsberg Energy Director Office of Economic Planning and Development 1700 West Washington - 5th Floor
Phoenix, Arizona 85007 Mr. Wayne Shirley Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Kenneth Berlin, Esq.

Winston 8 'Strawn Suite 500 2550 M Street, NW Washington, DC 20037 Ms.

Lynne Bernabei Government Accountability Project of the Institute for Policy Studies 1901 gue Street, NW Washington, DC 20009 Mr.

Ron Rayner P.

0.

Box 1509

Goodyear, AZ 85338 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.

7910 Woodmont Avenue Suite 1310

Bethesda, Maryland 20814 Mr.

Roy Zimmerman U.S. Nuclear Regulatory Commission P.

0.

Box 239 Arlington, Arizona 85322 Ms. Patricia Lee Hourihan 6413 S. 26th Street

Phoenix, Arizona 85040 Regional Administrator, Region V

U.

S.

Nuclear Regulatory Commission 1450 Maria Lane

.Suite 210 Walnut Creek, Cal ifor ni a 94596

t I