ML17300A952

From kanterella
Jump to navigation Jump to search

Forwards Record of 870604 Telcon Between Lj Marker & EA Licitra Re Cycle 2 Reload Tech Specs
ML17300A952
Person / Time
Site: Palo Verde 
Issue date: 06/22/1987
From: Haynes J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Licitra E
NRC
References
161-00292-JGH-L, 161-292-JGH-L, TAC-65691, TAC-65692, NUDOCS 8707020389
Download: ML17300A952 (6)


Text

REGULA Y INFORMATION DISTRIHUTIO YBTEM (RIDB)

" ACCESSION NBR: 8707020389 DOC. DATE: 87/06/22 NOTARIZED:

NO DOCKET 0 FACIL:STN-50-528 Palo Verde Nuclear Station>

Unit 1> Arizona Publi 05000528 AUTH. NAME AUTHOR AFFILIATION HAYNES'. Q.

Arizona Nuclear Power ProJect (formerly Arizona Public Berv RECIP. NAME RECIPIENT AFFILIATION LICITRA> M.

NRC No Detailed Affiliation Given

SUBJECT:

Forwards record of 870604 telcon between LJ Marker 5 EA Licitra re Cycle 2 reload Tech Specs.

DISTRIBUTION CODE:

AOOID COPIES RECEIVED: LTR J ENCL Q SIZE:

TITLE:

OR Submittal:

General Distribution NOTES: Standardi zed p lant. M. Davisi NRR: iCg.

05000528 REC IP IENT ID CODE/NAME PD5 LA LICITRAIE INTERNAL: ACRB NRR/DEBT/ADE NRR/DOEA/TBB OQC/HDB1 REB/DE/EIB EXTERNAL:

EGSG HRUSKEI S NRC PDR NOTES:

COPIES LTTR ENCL 1

0 1

6 6

1 1

0 1

1 1

1 1

1 1

REC IP IENT ID CODE/NAME PD5 PD DAVISIM ARM/DAF/LFMB NRR/DEST/ADB NRR/PMAB/ILRB EQ FI 01 LPDR NSIC COP IES LTTR ENCL 5

5 1

'0 1

1 1

TOTAL NUMBER OF COP IEB REGUlRED:

LTTR 27 ENCL 24

1$

\\'

lt, J

I h

h fl I

'V, '~

J l

I I

h

'Cj II h

I ~ I I"il l'l N:"he'll I h ~,

P(fl

~ 4 I,

Arizona Nuclear Power Project P.o. BOX 52034

~

PHOENIX, ARIZONA85072-2034 June 22, 1987 161-00292-JGH/LJM Mr. Manny Licitra Project Manager U.S. Nuclear Regulatory Commission Phillips Building 7920 Norfolk

Bethesda, MD 20814

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1 Docket No.

STN 50-528 (License NPF-41)

Telephone Conversation Concerning Unit 1 Cycle 2 Reload Technical Specifications File: 87-B-056-026

Dear Sir:

Attached for your information is a

copy of the conversation memorandum written as a result of the conversation between yourself and Lonnie Marker.

If you have any questions please contact W. F. Quinn at (602) 371-4087.

Very Truly Yours, J.

G. Haynes Vice President Nuclear Production JGH/LJM/ls Attachment cc:

0.

M.

De Michele E. E.

Van Brunt, Jr.

G.

W. Knighton R.

P.

Zimmerman J.

B. Martin A. C. Gehr C. E. Tedford U. S.

Document Control Desk 8707O20389

5OOOS28, 870+22 FIDR I5IDOCN, 0 FIDR

~4 b

s~J,roi l yrrneH

.<<V.

aegerrsH oospore'I

J

+I r

T CONVERSATION MEMORANDUM

~X TELEPHONE OFFICE VZSZT FILE ND.:

87-87-001-211 MEETINs DATE:

6 4 87 TIME:

0 00 PREPARED BY:

L J

M k

M F

DZSTRZBUTZDN J.MAl 0

PARTICIPANTS tNema/Camyshv)

SUBJECT T.S..5~.3.1, Fuel L'nrichment going from 4.0 to 4.05 weight percent U235.

SUMMARY

The PRB requested further clarification from the NRC staff on the interpre-tation of Tech.

Spec. T'5j.3.1.

Manny Licitra, NRC Project Manager, was contacted and asked the following questions:

Q:

Do you interpert the Tech.

Spec.

to say that no bundle with a peak pin enrichment of 4.05 w/o U235 can be placed in the core prior to the approval of the Tech.

Spec.

Change?

NRC:

Yes.

For clarification, however, it is su gested the words eak in should be added after maximum and add a footnote statin that the avera e

bundle enrichment will not exceed 4.0 wX U235.

Q: Mill you review, in order, those Tech.

S ecs. identified b

ANPP as bein required first?

NRC:

Yes. If a list of those Tech.

S ecs.

that are identified as bein necessary to Unit 1 Startu are ranked in the order ou want them reviewed we will review the Tech.

S ecs. in that order.

PVR1 AMOK OSACIO