ML17300A952
| ML17300A952 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 06/22/1987 |
| From: | Haynes J ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Licitra E NRC |
| References | |
| 161-00292-JGH-L, 161-292-JGH-L, TAC-65691, TAC-65692, NUDOCS 8707020389 | |
| Download: ML17300A952 (6) | |
Text
REGULA Y INFORMATION DISTRIHUTIO YBTEM (RIDB)
" ACCESSION NBR: 8707020389 DOC. DATE: 87/06/22 NOTARIZED:
NO DOCKET 0 FACIL:STN-50-528 Palo Verde Nuclear Station>
Unit 1> Arizona Publi 05000528 AUTH. NAME AUTHOR AFFILIATION HAYNES'. Q.
Arizona Nuclear Power ProJect (formerly Arizona Public Berv RECIP. NAME RECIPIENT AFFILIATION LICITRA> M.
NRC No Detailed Affiliation Given
SUBJECT:
Forwards record of 870604 telcon between LJ Marker 5 EA Licitra re Cycle 2 reload Tech Specs.
DISTRIBUTION CODE:
AOOID COPIES RECEIVED: LTR J ENCL Q SIZE:
TITLE:
OR Submittal:
General Distribution NOTES: Standardi zed p lant. M. Davisi NRR: iCg.
05000528 REC IP IENT ID CODE/NAME PD5 LA LICITRAIE INTERNAL: ACRB NRR/DEBT/ADE NRR/DOEA/TBB OQC/HDB1 REB/DE/EIB EXTERNAL:
EGSG HRUSKEI S NRC PDR NOTES:
COPIES LTTR ENCL 1
0 1
6 6
1 1
0 1
1 1
1 1
1 1
REC IP IENT ID CODE/NAME PD5 PD DAVISIM ARM/DAF/LFMB NRR/DEST/ADB NRR/PMAB/ILRB EQ FI 01 LPDR NSIC COP IES LTTR ENCL 5
5 1
'0 1
1 1
TOTAL NUMBER OF COP IEB REGUlRED:
LTTR 27 ENCL 24
1$
\\'
lt, J
I h
h fl I
'V, '~
J l
I I
h
'Cj II h
I ~ I I"il l'l N:"he'll I h ~,
P(fl
~ 4 I,
Arizona Nuclear Power Project P.o. BOX 52034
~
PHOENIX, ARIZONA85072-2034 June 22, 1987 161-00292-JGH/LJM Mr. Manny Licitra Project Manager U.S. Nuclear Regulatory Commission Phillips Building 7920 Norfolk
- Bethesda, MD 20814
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 1 Docket No.
STN 50-528 (License NPF-41)
Telephone Conversation Concerning Unit 1 Cycle 2 Reload Technical Specifications File: 87-B-056-026
Dear Sir:
Attached for your information is a
copy of the conversation memorandum written as a result of the conversation between yourself and Lonnie Marker.
If you have any questions please contact W. F. Quinn at (602) 371-4087.
Very Truly Yours, J.
G. Haynes Vice President Nuclear Production JGH/LJM/ls Attachment cc:
0.
M.
De Michele E. E.
Van Brunt, Jr.
G.
W. Knighton R.
P.
Zimmerman J.
B. Martin A. C. Gehr C. E. Tedford U. S.
Document Control Desk 8707O20389
- 5OOOS28, 870+22 FIDR I5IDOCN, 0 FIDR
~4 b
s~J,roi l yrrneH
.<<V.
aegerrsH oospore'I
J
+I r
T CONVERSATION MEMORANDUM
~X TELEPHONE OFFICE VZSZT FILE ND.:
87-87-001-211 MEETINs DATE:
6 4 87 TIME:
0 00 PREPARED BY:
L J
M k
M F
DZSTRZBUTZDN J.MAl 0
PARTICIPANTS tNema/Camyshv)
SUBJECT T.S..5~.3.1, Fuel L'nrichment going from 4.0 to 4.05 weight percent U235.
SUMMARY
The PRB requested further clarification from the NRC staff on the interpre-tation of Tech.
Spec. T'5j.3.1.
Manny Licitra, NRC Project Manager, was contacted and asked the following questions:
Q:
Do you interpert the Tech.
Spec.
to say that no bundle with a peak pin enrichment of 4.05 w/o U235 can be placed in the core prior to the approval of the Tech.
Spec.
Change?
NRC:
Yes.
For clarification, however, it is su gested the words eak in should be added after maximum and add a footnote statin that the avera e
bundle enrichment will not exceed 4.0 wX U235.
Q: Mill you review, in order, those Tech.
S ecs. identified b
ANPP as bein required first?
NRC:
Yes. If a list of those Tech.
S ecs.
that are identified as bein necessary to Unit 1 Startu are ranked in the order ou want them reviewed we will review the Tech.
S ecs. in that order.
PVR1 AMOK OSACIO