Proposed Tech Specs Section 6.8.1, CEA Symmetry Test Program Implementation to Add Statement by Clarifying That Initial Cycle of Operation Exempted from Stated Requirement
ML17300A951
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 06/22/1987
From:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17300A950 List:
References
TAC-65638, NUDOCS 8707020027
Download: ML17300A951 (2)


Text

~ ~

CONTROLLED BY USER ADMINISTRATIVE CON ROLS PROCEDURES AND PROGRAMS (Continued)

~

h. PROCESS CONTROL PROGRAM implementation.
i. OFFSITE DOSE CALCULATION MANUAL implementation.
j. equality Assurance Program for effluent and environmental monitoring, using the guidance in Regulatory Guide 1.21, Revision 1, June 1974 and Regulatory Guide 4. 1, Revision 1, April 1975 Pre-planned Alternate Sampling Program imp1ementation.
l. Secondary water chemistry program implementation.

NOTE: The licensee shall perform a secondary water chemistry monitoring and control program that is in conformance with the program discussed in Sec-tion 10.3.4. 1 of the CESSAR FSAR or another NRC approved program.

m. Post-Accident Sampling System implementation.*
n. Settlement Monitoring Program implementation.

NOTE: The licensee shall'aintain a .settlement monitoring program throughout the life of the plant in accordance with the program presented in Table 2.5-18 of the PVNGS FSAR or another NRC approved program.

o. CEA Symmetry Test Program implementation The licensee shall perform a CEA symmetry test program in conformance with NOTE:

Qg I+A g~% c)c 4Q p.

'f the program discussed in Sect;ion 4.2.2 of the PVNGS SER dated November 11, 1981.

DpcLl 2L c woA, %$ 4<~~+ co 4 pv o~ 44gQ ~g q~yy~g v Fuel Assetttbly Survei1 lance Program Fmpl ementation NOTE: The licensee shall perform a fuel assembly surveillance program in con-formance with the program .discussed in Section 4.2.4 of the PVNGS SER dated November 11, 1981.

6.8.2 Each program or procedure of Specification 6.8.1, and changes thereto, shall be reviewed as specified in Specification 6.5 and approved prior to implementation. Programs, administrative control procedures and implementing procedures shall be approved by the PVNGS Plant Manager, or designated alternate who is at supervisory level or above. Programs and procedures of Specifica-tion 6.8. 1 shall be reviewed periodically as set forth in administrative procedures.

6.8.3 Temporary changes to procedures of Specification 6.8. 1 above may be made provided: I

a. The intent of the original procedure is not altered.
b. The change is approved by two members of the plant supervisory staff, at least one of whom is a Shift Supervisor or Assistant Shift

'Supervisor with an SRO on the affected unit.

c. The change is documented, reviewed in accordance with Specification
6. 5. 2 and approved by the PVNGS Plant Manager or cognizant department head, as designated by the PVNGS Plant Manager, within 14 days of implementation.

8707020027 970622 PDR ADQCK 05000530 P PDR "Not required until prior to exceeding ) 5X of RATED THERMAL POWER.

PALO VERDE " UNIT 3 6-14