Application for Amend to License NPF-41,changing Tech Spec Section 6, Administrative Controls, to Reflect Reorganization.Addl Changes to Tech Specs Planned.Fee Paid
ML17299B259
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 05/29/1986
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
Shared Package
ML17299B260 List:
References
ANPP-36712-EEVB, TAC-61749, NUDOCS 8606050136
Download: ML17299B259 (6)


Text

REGULA Y XNFORiilATIQN DISTR IBUTl SYSTEM (R IDB)

ACCESSION NBR: 8606050136 DQC. DATE: 86/05/2V NOTARIZED: NO DOCKET I FACIL; STN-50-528 Palo Verde Nuclear Station> Unit 1> Arizona Pub 1 i 05000528 AUTH. NAllE AUTHOR AFFILIATION VAN BRUNT> E. E. Arizona Nuclear Poiiier Prospect (0'ormerlg Ari zona Publ.ic Serv RECIP. NhllE RECIPIENT AFFILIATION KNXQHTQN, Q. N. PNR Prospect DiT ectorate 7 SUB JECT: App1 ication t'or amend to Li cense NPF-41 changing Tech Spec Section 6> "Administrative Controls." to reflect reorganization. Addi changes to Tech Specs planned. Fee paid.

DIBTRXBUTION CODE: A001D COPIEB RECEIVED: LTR ENCL SIZE:

TXTLE: QR Submittal: General Distribution NOTES: Standardi zed plant. 05000528 I

REC P XENT COP IEB RECIPIENT COPIES ID CODE/Nhl"IE LTTR ENCL ID CODE/NABLE LTTR ENCL PljR-8 ADTB 0 PWR-'8 EB 1 PlJR-8 PEICSB 2 2 PWR-8 FOB 1 PNR-8 PD7 L* 0 PNR-8 PD7 PD 01 5 5 LICITRA E 1 PMR-8 PEXCBB 1 PNR-8 RSB 1 1 INTERNAL ACRB 6 6 *DN/LFHB 0 ELD/HDS3 0 NRR/DHFT/TSCB 1 NRR/ORAS 0 R 04 1 RQN5 1 1 EXTERNAL: 24X 1 1 EQ8(G BRUBKE> B 1 1 LPDR 03 1 NRC PDR 02 1 1 NSIC 05 1

)J ~/~hHc 'Ig'O.

TOTAL NUNBER OF CQP I ES REQUIRED: LTTR 31 ENCL 2b

li 1

,t I l

i

Arizona Nuclear Povver Project P.o. BOX 52034 ~ PHOENIX. ARIZONA85072-2034 ANPP-36'712 EEVB/JRP/98.05

'"May 29, 1986 Director of Nuclear Reactor Regulation Attention: Mr. G. W. Knighton, Project Director

  • PWR Project Directorate ImI7 Division of Pressurized Water Reactor Licensing B U~ ST Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1 Docket No. STN 50-528 (License NPF-41)

Technical Specification Amendment Administrative Controls, Section 6 File: 86-056-026

Dear Mr. Knighton:

Attached, please find proposed changes to the PVNGS Unit 1 Technical Specifications Section 6 "Administrative Controls." The changes presented herewith were previously discussed with and agreed to by your staff during the PVNGS Unit 2 Technical Specifica-tion review process and have been incorporated into the PVNGS Unit 2 license.

By .this'etter, we are requesting that the attached changes be incorporated into the Unit 1 Technical Specifications. Attachment 1, to this letter, is the no significant hazards consideration for your review and approval. Attachment 2 is Technical Specifica-tion Section 6, Administrative Controls figures 6.2-1, 6.2-2 and Section 6 4 1, which ~ ~

is to be replaced by Attachment 3, the revised figures showing the organizational changes'n future correspondence, we will be requesting additional changes to the Unit 1 Technical Specifications in order for the Technical Specifications to be identical with Unit 2~

In accordance with the requirements of 10 CFR 170. 12(c), the license amendment applica-tion fee of $ 150.00 is also enclosed.

If you have any questions, please call.

Very truly ours, SbP529 GlJd ebpbpSp13b p>ppp528 POOCH pDR E. Van Brunt, Jr.

[ E ~

Executive Vice President

EVB/JRP/rw Project Director Attachments cc: Director, Region V, USNRC NRC Project Director, E. A. Licitra NRC Resident Inspector, R. P. Zimmerman ge,c, o

~r~((, pl~. oo

n 4

l

ATTACHMENT 1 DESCRIP'/ION OF AMENDMENT REQUEST:

The proposed amendment would modify Section 6, Figures 6.2-1 and 6.2-2. The Assistant Vice President Nuclear Production is shown separated from the Vice President Nuclear Production and is assigned direct responsibility for four support functions: Emergency Planning, Administrative Services,'Training, and Mater Reclamation Facility operations.

This change was made to allow those managers who have direct responsibility for plant operation and safety to concentrate on those, areas and to provide effective management for necessary support functions.

An additional change can also be seen on these figures. The Compliance Department, reporting to the PVNGS Plant Manager, will now be headed by a.Manager with one or more supervisors reporting to him. This change is intended to increase the effectiveness of this group in responding to regulatory and plant issues.

BASIS FOR NO SIGNIFICANT HAZARDS DETERMINATION:

(A) The proposed change does not involve a significant hazards consideration because operation of Palo Verde Nuclear Generating Station Unit 1, in accordance with this change, would not:

(1) Involve a significant increase in 'the probability or consequences of an accident previously evaluated.

This change merely eliminates, from the organization chart, those areas which do not have direct relationship with plant operations and safety.

The organization of ANPP is presented in chapter 13 of the FSAR and it listing in the Technical Specifications would be redundant. Changes made in the organization will increase the effectiveness of PVNGS management by having those areas, which are support functions, report to the Assistant Vice President of Nuclear Production.

Therefore, this change cannot increase the probability or consequences of an accident.

(2) Create the possibility of a new or different kind of accident from any previously analyzed.

E Xt has been determined that a new or different kind of accident will not be possible due to this change. This elimination of redundant administrative requirements does not create the possibility of a new or different kind of accident.

(3) Involve a significant reduction in a margin of safety.

This change was made to allow those managers who have direct responsibilities for plant operation and safety to concentrate resources on those areas and to provide effective management for necessary support functions. Elimination of redundant administrative requirements will not reduce the margin of safety.

(B) The Commission has provided guidance concerning the application of the standards for determining whether a significant hazards consideration exists.

The proposed change is similar to example (ix); inasmuch as this change would modify Section 6, Figures 6.2-1 and 6.2-2, to reflect organizational changes. Section 13 of the FSAR will also be changed to reflect the new organization.