n REQUL RY INFORMATION DISTR IBUTI SYSTEN (R IDS)
ACCESSION NBR: 8606030245 DOC. DATE: 86/05/27 NOTARIZED:
NO DOCNET FACIL:STN-50-528 Palo Verde Nuclear Station>
Unit ii Arizona Publi 05000528 AUTH. NAltE AUTHOR AFFILIATION VAN BRUNT'. E.
Arizona Nuclear Power Prospect (Formerly Arizona Public Serv RECXP. NANE RECIPIENT AFFILIATION KNIQHTON, Q. M.
PMR Prospect Directorate 7
SUBJECT:
Mithdraes 860228 application For amend to License NPF-41>
changing moderator temp coeFficient. Relocation oF check valve leakage lines completed during spring outage.
DISTRIBUTION CODE:
AOOiD COP XES RECEIVED: LTR ENCL SX ZE:
TXTLE:
OR Submi ttal:
Qen era 1 Distribution NOTES: Standardized plant.
05000528 RECXP IENT ID CODEINANE PMR-B ADTS PMR-B PEICSB PNR-B PD7 PD Oi PNR-B PEICSB COPIES LTTR ENCL RECIPIENT XD CODE/NANE P4JR-B EB PMR-B FOB LICITRA>E PMR-B RSB COPIES LTTR ENCL INTERNAL: ACRS ELD/HDSS NRR/ORAS RQN5 EXTERNAL 24X LPDR NSIC 09 ADN/LFMB NRR/D
/TSCB FIL 04 EQSQ BRUSKEi 8 NRC PDR 02 TOTAL NUNBER OF COFIEB REGUIREO:
LTTR 30 ENCL
4 A <<>> L>>k>>.,
N. k, k
>>EP g glP)'0 A)JA JJ
,>>(ll "4" >> lk k
4 i4
>> I!>>X,i
~ i!
Q 1%1
~>>',4[>IA!
Arizona Nuclear Power Project P.O. BOX 52034
~
PHOENIX. ARIZONA55072-2034 May 27, 1986 ANPP-36691-EEVB/BJA/98.05 Director of Nuclear Reactor Regulation Attention:
Mr. George W. Knighton, Project Director PWR Project Directorate 87 Division of Pressurized Water Reactor Licensing B U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 1 Docket No.
STN 50-528 (License No. NPF-41)
NRC Request for Additional Information Unit 1 Moderator Temperature Coefficient File:
86-E-056-026 86-F-005-419.05
References:
(1)
Letter from E.
E.
Van Brunt, Jr.,
ANPP, to G.
W. Knighton,
- NRC, dated February 28, 1986 (ANPP-35342).
Subject:
Technical Specification Amendment Request for Moderator Temperature Coefficient.
(2)
Letter from E.
A. Licitra,
- NRC, to E.
E.
Van Brunt, Jr.,
ANPP, dated April 30, 1986.
Subject:
Request for Additional Information Moderator Temperature Coefficient for PVNGS Unit 1.
Dear Mr. Knighton:
Reference (1) submitted a
request to modify the PVNGS Unit 1
Moderator Temperature Coefficient (MTC) Technical Specification.
During the NRC Staff review of this request, the NRC staff determined that additional information was needed before the review could be completed.
- Thus, the NRC staff tr'ansmitted a request for additional information to ANPP (Reference (2)).
The purpose of this letter is to inform the NRC staff that the requested Technical Specification change is no longer necessary to support PVNGS Unit 1, cycle 1 operation.
This amendment was originally necessary because the check valve leakage lines for the safety injection lines in PVNGS Unit 1
were installed such that 87 cubic feet of safety injection line volume was between the check valves closest to the Reactor Coolant System (RCS) and the check valve leakage lines.
With this configuration, direct boration into the RCS would have been required to ensure that this volume of water between the leakage lines and the check valves remained borated consistent with safety analysis assumptions.
Subsequent to the original amendment
- request, ANPP was able to complete the modification to relocate the check valve leakage lines closer to the check valves.
This modification was completed during the spring outage at PVNGS Unit 1.
The completion of the modification made the Technical Specification change unnecessary.
Therefore, ANPP hereby withdraws the request to have the MTC Technical Specification amended.
BS0S0S02O5 8SO5n PDR ADOCK 05000528 P
n V
Mr. George W. Knighton NRC Request for Additional Information Unit 1 Moderator Temperature Coefficient ANPP-36691 Page 2
If you have any further questions on this matter, please contact Mr.
W.
F.
+sinn of my staff.
Very truly yours, F.%'EVB/BJA/dim E. E.
Van Brunt, Jr.
Executive Vice President Project Director cc:
E. A. Licitra R. P.
Zimmerman A. C. Gehr