ML17299B151
| ML17299B151 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 04/03/1986 |
| From: | Licitra E Office of Nuclear Reactor Regulation |
| To: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| References | |
| NUDOCS 8604080500 | |
| Download: ML17299B151 (3) | |
Text
y
~ r Docket No.:
50-529 April 3, 1986 Mr. E.
E.
Van Brunt, Jr.
Executive Vice President Arizona Nuclear Power Project Post Office Box 52034 Phoenix, Arizona 85072-2034
Dear Mr. Van Brunt:
Subject:
Request for Additional Information - Palo Verde Unit 2 Technical Specifications As a result of our review of the proposed Technical Specifications for the Palo Verde Unit 2 full power license, the staff has identified the need for additional information regarding Specifications 3.4.1.2 and 3.4. 1.3.
The LCOs for those specifications appear to be unsupported by their bases in Section 3/4.4. 1.
Section 3/4.4. 1 appears to require that all four reactor coolant pumps (both reactor coolant loops) be operable in Modes 3 and 4.
The LCOs, on the other hand, require only one reactor coolant pump in each loop to be operable in Modes 3 and 4.
Please explain this inconsistency including, if'ppropriate, a reference to the relevant FSAR safety analysis.
If you have any questions regarding this letter, please contact me.
Sincerely, cc:
See next page DIS RI BUTION c et Fi e 50-529 NRC PDR LPDR PBD7 Reading FMiraglia
- Attorney, ELD EJordan PBD7 EALicitra/yt 4/g/86 BGrimes JPartlow EALicitra JLee ACRS (10)
CLiang ghton
/y/86 E. A. Licitra, Project Manager PWR Project Directorate No.
7 Division of PWR Licensing-B ggg4Q90500 8
pgp
>DOCK 0500>>>~
P
)
Hr. E.
E.
Van Brunt, Jr.
Arizona Nuclear Power Project Palo Verde CC Arthur C. Gehr, Esq.
Snell 5 Wilmer 3100 Valley Center Phoenix, Arizona 85073 Mr. James M. Flenner, Chief Counsel Arizona Corporation Commission 1200 West Washington Phoenix, Arizona 85007 Charles R. Kocher, Esq. Assistant Council James-A. Boeletto, Esq.
Southern California Edison Company P. 0.
Box 800
- Rosemead, Cali fornia 91770 Hr. Hark Ginsberg Energy Director Office of Economic Planning and Development 1700 West Washington - 5th Floor Phoenix, Arizona 85007 Mr. Wayne Shirley Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Kenneth Berlin, Esq.
Winston 5 Strawn Suite 500 2550 H Street, NW Washington, DC 20037 Ms. Lynne Bernabei Government Accountability Project of the Institute for Policy Studies 1901 Que Street, NW Washington, DC 20009 Hs. Jill Morrison 522 E. Colgate Tempi, Arizona 85238 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.
7910 Woodmont Avenue Suite 1310
- Bethesda, Maryland 20814 Mr. Ron Rayner P. 0.
Box 1509
- Goodyear, AZ 85338 Hr.
Roy Zimmerman U.S. Nuclear Regulatory Commission P. 0.
Box 239 Arlington, Arizona 85322 Hs. Patricia Lee Hourihan 6413 S. 26th Street Phoenix, Arizona 85040 Regional Administrator, Region V
U. S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596