Discusses Util 860130 Request for Schedular Exemption from Requirements of 10CFR50.71(e).USAR Will Be Submitted 1 Yr Following Licensing of Unit 3.Amend 15 to FSAR Will Be Submitted in May.Sars for All Units Current.Fee Paid
ML17299B102
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/18/1986
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
ANPP-35575-EEVB, TAC-60910, NUDOCS 8603240058
Download: ML17299B102 (6)


Text

REGULATOR i INFORMATION DISTRIBUTION EM (RIDS)

ACCESSION NBR: $603240058 DOC. DATE: 86/03/18 NOTARIZED:

NO DOCKET 0 FACIL:STN-50-528 Palo Verde Nuclear Stationi Unit 1i Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Stationi Unit 2i Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Stations Unit 3i Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION VAN BRUNT',E. E.'rizona Nuclear Power Prospect (formerlj Arizona Public Serv RECIP. NAME RECIPIENT AFFILIATION KNIGHTQNp G. W.

PWR Pro Ject Directorate 7

SUBJECT:

Discusses util 860130 request for schedular exemption from requirements of 10CFR50-71(e).

USAR will be submitted 1 gr following licensing of Unit 3. Amend 15 to FSAR will be submitted in May. SARs for all units current. Fee paid.

DISTRIBUTION CODE:

A001D COPIES RECEIVED: LTR ENCL SIZE:

TITLE:

QR Submittal:

General Distribution NOTES:Standardized plant.

Standardi zed plant.

Standardized plant.

05000528 05000529 05000530 RECIPIENT ID CODE/NAME PWR-8 ADTS PWR-8 PEICSB PWR-8 PD7 PD 01 P WR-8 P EICSB COPIES LTTR E 1

2 5

1 CL RECIPIENT ID CODE/NAME PWR-8 EB PWR-8 FOB LICITRA>E PWR-8 RSB CQP IES LTTR ENCL INTERNAL:

ACRS ELD/HDS3 NRR/ORAS RGN5 EXTERNAL:

2@X LPDR NSIC 09 03 05 ADM/LFMB

'NRR FT/TSCB 0e EGSG BRUSKE> S NRC PDR 02 4 I~a

~Oi ofl8'OTAL NUMBER OF COPIES REQUIRED:

LTTR 30 ENCL

It

'l.'(

I KI Il C

th K,

I l

IF h

'I

)

'I It K

I I K' KC I

k I l I I

',KK I "Phva P'

~

~ "C

'C

)II tt i.,

  • 'K,I'I I

r,

,K (K

t I

> (k ",

I II I

IJ I(I I>>

~ Q>>lt-I h "(3a.

I a

V

,C 'ht.t I

K C jC(",,

I tl

Arizona Nuclear Power Project P.o. BOX 52034

~

PHOENIX. ARIZONA85072-2034 March 18, 1986 ANPP-35575-EEVB/JKO/98.05 Director of Nuclear Reactor Regulation Attention:

Mr. George W. Knighton, Project Director PWR Project Directorate II7 Division of Pressurized Water Reactor Licensing B

U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Reference:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1

and 2

Docket Nos.

STN 50-528 (License NPF-41)

STN 50-529 (License NPF-46)

Information Regarding Request for Exemption to 10 CFR 50.71(e)

File: 86-056-026; G. 1. 01. 10 Letter from E.

E.

Van Brunt, Jr.,

ANPP, to G.

W. Knighton,

NRC, dated January 30, 1986.

Subject:

Request for Exemption to 10 CFR 50.71(e)

(ANPP-34865)

Dear Mr. Knighton:

In the referenced letter, ANPP requested a schedular exemption to the requirements of 10 CFR 50.71(e).

The special circumstances, under which this request for an exemption has been

sought, correspond to items 2(i) and 2(ii) of 10 CFR 50. 12 speci-fic exemptions'n October 1,
1979, ANPP submitted the Final Safety Analysis Report (FSAR) for all three Palo Verde Units.

From that time until the present, the staff has reviewed the FSAR on the basis that it was for all three units;

however, since all three units are not being licensed at the same time, there are two regulations which come in conflict with each other.

10 CFR 50'4 requires ANPP to amend the FSAR in order to keep the information contained therein current, whereas 10 CFR 50.71(e) requires ANPP to submit an entirely new document, an Updated Safety Analysis Report (USAR), which replaces the existing FSAR ~ Therefore, in order to comply with these two regulations concurrently ANPP would have to maintain both the FSAR with amend-ments and the USAR. Maintaining two versions of the same licensing document for all three units would be difficult, could lead to ambiguities and confusion and would serve no useful purpose if the existing FSAR is maintained, up-to-date through the licensing of Unit 3 ~

In order to eliminate the conflict in the implementation of these two regulations, ANPP proposed a plan in the referenced letter, which was to transmit the USAR one year following the issuance of the Unit 3 license.

This proposal meets the intent of the regulations without raising any safety concerns'NPP will still maintain a Safety Analysis Report For all three units with current information and the infor-mation will be transmitted to the staff on a timely basis.

seos24005a 8sosss PDR ADOCK 05000529 p

PDR pD 4IIi u) g )5'd OI

0 p

'I

c'r.

George W. Knighton Information Regarding Request for Exemption to 10 CFR 50.71(e)

ANPP-35575 Page 2

At the present

time, ANPP plans to submit Amendment 15 to the FSAR during the first part of May. Therefore, due to the work in progress, your prompt attention to this matter would be greatly appreciated.

In accordance with the requirements of 10 CFR 170. 12, the application fee of $150.00 i's also enclosed.

If you have any questions regarding this matter, please contact Mr.

W.

F. guinn of my staff.

Very truly y urs, I*

EEVB/JKO/rw Attachment l

cc:'.

A. Licitra A.',C. Gehr R.

P.

Zimmerman E.

E.

Van Brunt, Jr.

Executive Vice President Project Director

'