ML17299A977
| ML17299A977 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 01/30/1986 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Knighton G Office of Nuclear Reactor Regulation |
| References | |
| ANPP-34865-EEVB, TAC-606910, TAC-60910, NUDOCS 8602040201 | |
| Download: ML17299A977 (6) | |
Text
REGULATO NFORNATION DISTRIBUTION TEN (BIDS)
ACCESSION NBR: 8602040201 DOC. DATE: 86/01/30 NOTARIZED:
NO DOCKET 0 FACIL:STN-50-528 Palo Verde Nuclear Stationi Unit 1i Arizona Puhli 05000528 STN-50-529 Palo Verde Nuclear Stationi Unit 2i Arizona Publi 05000529 AUTH. NANE AUTHOR AFFILIATION VAN BRUNT>~E. E.
Arizona Nuclear Power Prospect (formerly Arizona Public Serv REC IP. NANE RECIPIENT'FFILIATION KNIGHTON, Q. M.
PNR Prospect Directorate 7
SUBJECT:
Requests schedular exemption from'. 10CFR50. 71(e) reQUirements for periodic updates to FSARs. Proposes submittal of updated FSARs be deferred for 1 gr following receipt of low power license for Unit 3.
DISTRIBUTION CODE:
A053D COPIES RECEIVED: LTR ENCL SIZE:
TITLE:
OR Submittal:
Updated FSAR (50. 71)
NOTES: Standardized p lant.
OL'2/31/84 Standard 1 z ed p lant.
05000528 05000529 01 RECIPIENT ID CODE/NANE PNR-B PD7 PD LEVY N COPIES LTTR ENCL RECIPIENT ID CODE/NAME PNR-B PD7 LA LICITRApE 01 COPIES LTTR ENCL INTERNAL: ACRS NRR ROE'. L RQN5 EXTERNAL: 24X FRANKLIN NRC PDR 09 06 RE FIL DNB/DSS
'LPDR NSIC 05 02 8 a,~
TOTAL NUNBER OF COPIES REQUIRED:
LTTR ENCL
i v
i
- )f.<<1I,"
h,
'v h wh) Jive
~+Lh'.5v '
~
ff ih.t~~'vvv.)
t.
'," FP,.
))
l'h I <<, l,K
,'ll'v ill v,
vip ~
l
)v~ ~
v I
v p
I'I v Vf>vI g fD I -v f)v'I l"
<~,tv'K",
V hJ "A,,'
'v l)v hv CP<<
h.y i.
fv iP J.
hh>" f" v'V'fa'
><>h's v
Arizona Nuclear Power Project P.o. BOX 52034
~
PHOENIX, ARIZONA85072-2034 January 30, 1986 ANPP-34865-EEVB/JK0-98.07 Director of Nuclear Reactor Regulation Attention:
Mr. George W. Knighton, Project Director PWR Project Directorate II7 Division of Pressurized Water Reactor Licensing B
U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1 and 2
Docket Nos.
STN 50-.528 (License NPF-41)
STN 50-529 (License NPF-46)
Request for Exemption to 10CFR50.71(e)
File: 86-056-026'.1.01.10
Dear Mr. Knighton:
This letter is a formal request for a schedular exemption to the requirements of 10CFR50.71(e) for PVNGS Units 1
and
- 2. Presently, without the schedular exemption, a Final Safety Analysis Report (FSAR) update for Unit 1 would be due for submittal by December 31, 1986 and for Unit 2, an FSAR update would be due December 9,
1987.
This is well before the time Unit 3 would require an updated FSAR.
The following is our proposed plan to satisfy the intent of the regulation requiring periodic update of the FSAR.
Our proposal is to defer the submittal of an updated FSAR for Units 1
and 2 until one year following the receipt of a
low-power operating license for PVNGS Unit
- 3. With this relief granted, all three units will be discussed in a common updated FSAR. Without this exemption, both an amended and an updated FSAR would be required per 10CFR50.34 and 10CFR50.71(e).
A schedular exemption would eliminate the need to maintain both an updated FSAR and an amended FSAR. It would also eliminate an element of confusion that would be introduced by maintaining two separate documents for similar units. Until the time of submitting an updated
- FSAR, we will continue to keep the FSAR current through our present amendment process. It is our intent to amend the FSAR twice a
year until Unit 3 receives an operating license.
This will assure that the FSAR will contain accurate information regarding all three units on a timely basis.
One year following the licensing of Unit 3, an updated three-unit PVNGS FSAR will be submitted in accordance with the regulations and a revision to the updated FSAR will be submitted thereafter on an annual basis.
8b02040201 SbOi30 I
PDR ADQCK 05000528 P
~9 fo AB - B. CRBTCIIFIELO (1tr only) II
~,'B (N. JOIINSTON)
.I 7
RSB (TNONAS)
EICSB (PARR)
FOB (N.
RECAN)
'l
Mr. Ge+ ge M. Knighton Request for Exemption for 10CFR50.71(e)
ANPP-39865 Page 2
This plan affects work which is presently in progress, so prompt approval by April 15, 1986, is requested.
If you have any further questions regarding this matter, please contact Mr.
N.
F. Quinn of my staff.
Very truly yours, cEVu A~p ~gQ E. E.
Van Brunt, Jr.
Executive Vice President Project Director EEVB/JKO/rw cc:
E. A. Licitra A. C.
Gehr'.
P.
Zimmerman
V 0
)
M i ~