ML17299A705

From kanterella
Jump to navigation Jump to search
Forwards Final Draft Tech Specs.Specs Developed by Utilizing C-E STS & Unit 1 Tech Specs.W/O Encl
ML17299A705
Person / Time
Site: Palo Verde 
Issue date: 10/18/1985
From: Knighton G
Office of Nuclear Reactor Regulation
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
References
NUDOCS 8510310358
Download: ML17299A705 (6)


Text

~R AEgII (4

p0 Cy I

0 "j O

I C

++**+

UNITE0 STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 OCT lg 1985 Docket,No.:

50-529 Mr. E.

E.

Van Brunt, Jr.

Executive Vice President Arizona Nuclear Power Project Post Office Box 52034 Phoenix, Arizona 85072-2034"'ear Mr. Van Brunt:

SUBJECT:

PALO VERDE UNIT 2 TECHNICAL SPECIFICATION - FINAL DRAFT Enclosed please find the final draft version of the Palo Verde Unit 2 Technical Specifications.

The draft Technical Specifications were previously provided to you by letter dated August 14, 1985 for your comment during the formal Proof and Review Phase.

These Technical Specifications were developed by utilizing the Combustion Engineering Standard Technical Specifications (CE-STS), Revision 2, and the Palo Verde Unit 1 Technical Specifications as a basis.

Additional technical specification refinements developed as part of the CESSAR System 80 Final Draft Technical Specification review were considered, along with changes requested by you which were considered necessary to ensure that these specifications more accurately reflect the plant-specific design, address new regulatory requirements and correct minor editorial and/or typographical errors.

Changes and refinements were adopted where appropriate.

The Technical Specifications which will be issued as Appendix A to the Palo Verde Unit 2 license are expected to be essentially identical to the enclosed final draft with the exception of the reactor vessel toughness (forgings) Unit 2 specific test data.

This information has not yet been provided by you.

Any further changes requested by you, other than those required to correct editorial and/or typographical errors, should be docketed with justification for the requested changes.

You will receive further notification concerning your certification of the 85i03i 0358 85iDi8 PDR

  • DOCK 0500052'9 A

PDR

a

cc:

w/o enclosure cc:

C Mr. E.

E.

Van Brunt, Jr.

Arizona Nuclear Power Project Palo Verde CC:

Arthur C. Gehr, Esq.

Snell 5 Wilmer 3100 Valley Center Phoenix, Arizona 85073 Mr. James M. Flenner, Chief Counsel Arizona Corporation Commission 1200 West Washington Phoenix, Arizona 85007 Charles R. Kocher, Esq. Assistant Council James A. Boeletto, Esq.

Southern California Edison Company P. 0.

Box 800

Rosemead, Cal ifornia 91770 Mr. Mark Ginsberg Energy Director Office of Economic Planning and Development 1700 West Washington - 5th Floor Phoenix, Arizona 85007 Mr. Wayne Shirley Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Kenneth Berlin, Esq.

Winston 8 Strawn Suite 500 2550 M Street, NW Washington, DC 20037 Ms. Lynne Bernabei Government Accountability Project of the Institute for Policy Studies 1901 gue Street, NW Washington, DC 20009 Ms. Jill Morrison 522 E. Colgate Tempi, Arizona 85238 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.

7910 Woodmont Avenue Suite 1310

Bethesda, Maryland 20814 Mr. Ron Rayner P. 0.

Box 1509

Goodyear, AZ 85338 Mr. Roy Zimmerman U.S. Nuclear Regulatory Commission P. 0.

Box 239 Arlington, Arizona 85322 Ms. Patricia Lee Hourihan 6413 S. 26th Street Phoenix, Arizona 85040 Regional Administrator, Region V

U. S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596

I R>~<<

I E

R RE I<<<<<<II<<

~

R R~

R I

<< ~

EII r

R)l I C

I I f

I 1

<<RE I

'I I ~ l, <<h P '~

EE

<<1 I

RI,

Technical Specifications.

Should you have any questions concerning this issue, please contact Marilyn Ley; Licensing Project Manager, at (301) 492-7792.

Sincerely, Odglnaf ster:eJ bg George VK kdgI:taa George W. Knighton, Chief Licensing Branch No.

3 Division of Licensing Enclosure Unit 2 Final Draft Technical Specfications cc:

See next page Distribution:

(w/o enclosure)

~.Do eke t:F-i-1 e~

NRC PDR Local PDR PRC System NSIC LB83 Reading JLee OELD, Attorney ACRS (16)

JPartl ow BGrimes EJordan S.

Brown M. Virgilio g.:A+

ey/es 10/Ip/85 II3 nighton 10//II /85

0

~

i ~

r ti N (~ l

~

y

~ ~

'I I

I

~

e l)

>I f

4 P

'I 'l I I

$ ~

Q ~

t 0

1'