Forwards Revised Page to FSAR Section 17.2.9 Re QA During Operations Phase.Chemical Analysis Deleted as Special Process & Cleaning Changed to Chemical Cleaning
ML17299A682
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 09/30/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-33603-EEVB, NUDOCS 8510220146
Download: ML17299A682 (8)


Text

I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION N6R:851 FAGIL:STN 50 528 STN 50 529 STN"50-530 AUTH BYNAME VAN BRUNTEE ~ ED Rf,CIP ~ NAME MARTINEJ ~ 8 ~

DOCKET 05000528 05000529 05000530 02201EJO DOC ~ DATE! 85/09/30 NOTARIZEP:

YES Palo Verde Nuclear Stationi Unft 1E Arizona publf Palo Verde Nuclear StationR Unit 2E Arizona Publf Palo Verde Nuclear Stationi Unit 3i Arizona Publi AUTHUR AFFlLIATION Arizona Nuclear Power Project (formerly Arizona Publ fc Serv fCECIPIE,N f AFFILIATION Region bE Office of Dfr ector

SUBJECT:

Forwards revised page to FSAR Section 17,2 '

re QA during operations phase, Chemical analysis delted as special process L cleaning changed to chemical

cleaning, DISTRISUTION CODE:

IESSD COVIES RECEIVED:LTR ENCL g SIZE':

TITLE 50 ~ 5 I ~ a ~ 3

< 50 ~ 55 ~ f ~ 3 Cnange to SAR gA Program NOTES!Standardized plant.

OL: 12/31/8g Standardized plant.

Stanoardized plant.

05000528 05000529 05000530 REC IP IEN7 IO CODE/NAME LICITRA,E INTERNAL: ACRS IE/DQ~AV /BAR COPIES LT'l R ENCL 1

1 10 0

1 1

1 1

RECIPIENT ID CODE/NAME ADM/LFMB IE/F ILE RGN5 01 COPIES LTTR ENCL 1

0 1

1 1

1 EXTERNAL: 24X LPDR 1

1 1

1 DMB/DSS NRC PDR TOTAL NUMBER OF COPIES REUULRED! LTTR 20 ENCL 9

Arizona Nuclear Power Project P.o. BOX 52034

~

PHOENIX, ARIZONA85072-2034 Mr. John B. Hartin, Regional Administrator Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Region V

1450 Maria Lane, Suite 210 Walnut Creek, CA 94596-5368

'~~~lO'jfg~,

September 30, 1985 ANPP-33603-EEVB/JKO

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3

Docket Nos.

STN 50-528 (License No. NPF-41)/529/530 Change to PVNGS FSAR Chapter 17 File:

85-056-026 G.1.01.10

Dear Mr. Martin:

In accordance with 10CFR 50.55(f),

ANPP is submitting a change to the PVNGS FSAR Section 17.2.9 for your information.

The affected FSAR pages are attached.

This change deletes "chemical analysis" as a special process and changes "cleaning" to "chemical cleaning".

Special processes are those processes which depend largely on the skills of individuals performing the activity.

Due to the programs and procedures utilized by ANPP, chemical analysis does not fall under the category of special processes.

Under the criteria used to determine special processes, cleaning is not considered a special

process, but chemical cleaning is considered a special process.

These clarifications to the FSAR are consistent with ANSI 18.7; 10CFR 50, Appendix B; NUREG-0800; and ANPP QA Manual Criterion 9.

These changes do not diminish the effectiveness of the quality program, because controls still remain on chemical analysis.

Because of the programs and procedures concerning chemical analysis, safety is not being decreased.

A 10CFR 50.59 review has been performed for PVNGS Unit 1 concerning this change and it did not identify an unreviewed safety question.

851022014h 850930 PDR ADOCK 05000528 P

PDR

,(i

J.

B. Martin Chan'ge to PVNGS FSAR Chapter 17 A'NPP 33603-EEVB/JKO Page 2

If you have any further questions regarding this matter, please contact Mr. W. F.

Quinn of my staff.

Very truly yours, EEVB/JKO/slh Attachment E. E.

Van Brunt, Jr.

Executive Vice President Project Director cc:

R. P.

Zimmerman E. A. licitra A. C. Gehr USNRC Document Control Desk, Washington, D.C.

STATE OF ARIZONA

)

) ss.

COUNTY OF MARICOPA)

I, Edwin E.

Van Brunt, Jr.,

represent that I am Executive Vice President, Arizona Nuclear Power

Prospect, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.

Edwin E.

Van Brunt, Jr.

Sworn to before me thie~Qdey'o

, 1985.

Notary Public My Commission Expires:

My Commission Expires April 6, 1987

PVNGS FSAR Dna Qo a.g QUALITY ASSURANCE DURING THE OPERATIONS PHASE B.

Items can be traced to appropriate documentation such as drawings, purchase

orders, material certifications, etc.

C.

Correct identification of items is verified and documented prior to release for installation or use.

17.2.9 CONTROL OF SPECIAL PROCESSES Special processes are defined as those processes where process quality is largely dependent on the skill of the operator and on the control of process parameters.

The quality of these processes usually cannot be verified solely by direct inspec-tion of the work.

These special processes include, but are not, limited to, welding, heat treating, Cfs~ic.hL.

C non-destructive examination~ coating DhLcTK The Operations Quality Assurance Program requires that vendors identify, in their submittals, the special processes they intend to employ.

Vendors must assure that in performing these processes, qualified procedures, equipment, and personnel are used under controlled conditions, and in accordance with the requirements of applicable codes and standards.

The Operations

~

Quality Assurance Program imposes requirements for the control of special processes performed by personnel within APS, includ-ing the PVNGS staff.

Procedures used in these operations must be prepared and approved in accordance with the criteria of section 17.2.5, Instructions, Procedures and Drawings.

Equip-ment and personnel used by APS 'for performing special process operations must be qualified and controlled in accordance with applicable codes and standards and the requirements of the Operations Quality Assurance Program.

Special processes shall be performed under controlled conditions by qualified personnel in accordance with written process

sheets, shop procedures, checklists, travellers, or the equivalent.

Evidence of verification shall be documented.

For special processes not covered by existing codes or stand-ards or'.where quality requirements exceed the requirements of.

labe lW <

October 1981 17.2-47 Amendment 6