Application to Amend CPPR-142 & CPPR-143,permitting Implementation of Requested Schedular Exemption from GDC 4 Re Protection of Structures,Sys & Components Against Postulated RCS Main Loop Pipe Break Effects
ML17299A453
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/16/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
ANPP-33037-EEVB, TAC-56914, NUDOCS 8507220095
Download: ML17299A453 (6)


Text

REGULATORY FORMATION DI STR IBUTION SY ""M (RIDS)

'ACCESSION'BR ~ 8507220095,DOC ~ DATE! 65/07/16 NOTARIZEO:. NO Public DOCKET FACIL':STN-50-529 Palo Verde Nuclear'tations Unit 2i Arizona 05000529 AUTH",NAME VAN BRUNDT'i E. E o

'RECIP ~ NAME>>

'r STN 50-530 Palo Verde Nuclear Stations AUTHOR AFFILIATION i zona Pub i c Ser vi ce Co.

RECIPIENT AFFILIATION Licensing Branch 1

Unit 3< Arizona Publi 05000530 KNIGHTONg G ~ N ~ 3

SUBJECT:

" Applicatfon -to amend CPPR"142 8 CPPR"143~permftting implementation of requested schedular exemption from GDC 4 re,protection of structures~sys 8'components against postulated RCS main loop pipe break effects, DISTRIBUT'ION CODE! B001D COPIES RECEIVED:LTR 'NCL SIZEg

,TITLE'icensing Submittal: PSAR/FSAR Amdts 8 elated Correspondence NOTES:Standardized plant ~ 05000529 Standardized plant. 05000530

@EC IP I EN T'D RECIPIENT COPIES CODE/NAh1E< LTTR ENCL ID CODE/NAME LTTR ENCL' NRR/DL/ADL NRR LB3 BC NRR LB3 LA 1 LICITRAgE 01 1 INTERNAL; ACRS 41 ~ 6 ADM/LFMB 1 0 ElD/HDS3 IE FILE 1 1 IE/DEPER/EPB 36 1 IE/DQAVT/QAB21 1 NRR ROE're L NRR/DE/AEAS 1 0 NRR/DE/CEB 11 1 NRR/DE/EHEB 1 1 NRR/DE/EQB 13>> 2 NRR/DE/GB 28 2" NRR/DE/tlEB 18 1 NRR/DE/MTEB 17 1 NRR/DE/SAB 24 1 NRR/DE/SGEB 25 1 NRR/DHFS/HFEB40. 1 NRR/DHFS/LQB 32 1 NRR/DHFS/PSRB 1 NRR/DL/SSPB NRR/DSI/AEB GRUELeR'OPIES 26 1 NRR/DSI/ASB 1 NRR/DSI/CPB 10 1 NRR/DS I/CSB 09 1 NRR/DSI/I CSB 16 1 NRR/DS I/METB 12 1 NRR/DSI/PSB 19 1 NRR/ B 22 1 NRR/DS I'/RSB 23 1 04 1 RGN5 3 /tl RM/DDAMI I 8 1 EXTERNAL; 24 X 1 BNL(AMDTS ONLY)

DMB/DSS (AMDTS) 1 LPDR 03 NRC PDR 1 NSIC 05 02'NL>>

1

& C TOTAL NUMBER OF COPIES REQUIRED'TTR 52'NCL

11'

>>>1/1 >>1 K'<<1)n

"~ "CII'1>> C '1 > fc '>>>>' fi )1' 1 )>( ic.; .f.l~1 1>>(l" '7 5 Il'I"

~ 11 l I (>> ,.>1l f~

~ >>>>i $ K El ) i I a- f>>C>C>><<>> f 1 I>>(h P

> 1 i> , I I I (> ~

i )

<<" 1'C 1 1>> If,

~ ) f >>.>C,l<< >>

c!

<< <<,>(r( (11'c' K ~ > ll,e rh K>c" f 'f>> fCK (

~K 1>><< f yp> r, lc f .,> li 1'1 <<" 1 ;I>>>> 1 ~

t elf fl C >1' ft>f<<~C e 11 ~ 'f C(f 1 f> <<1,1>t If lilt

~ ~ g I if<<hc c;> ~ >>l J c r 1" W ~ ~t 41 f~( 1 1: <<

'f I >f >>',~ rf;"1> c cl t>> fci ~ C It( I(

f (if f 'I >1, f>>> 1( h, C1 IC, I i'1 11 f, i

<<' l "1(> i <<T ~

I JQ

)

> I, I>> I>>(>>X P<<

I

~ l>II~>> (>> ~

Th>> I

<<1 1 =)

Ic, Wfh >" ~ > I I

i Il'l g

~ (( ', Cl cl,(

1 1

c,>> lkr l Vrh c

hf('g f

>>>>l<<g . I.

<<lch hq> 1>>

1

Arizona Nuclear Power Project P.o. BOX 52034 ~ PHOENIX, ARIZONA85072-2034 Director of Nuclear Reactor Regulation ANPP-33037-EEVB/TFQ Attention: Mr. G. M. Knighton, Chief July 16, 1985 Licensing Branch No. 3 Division of Licensing U.S. Nuclear Regulatory Commission Vashington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 2 and 3 Docket Nos. STN-50-529/530 Request for Schedular Exemption to GDC4 File: 85-056-026 G.1.01.10

References:

(A) Letter from E. E. Van Brunt, Jr. ANPP, to G. V. Knighton, NRC, dated June 7, 1984 (ANPP-29684)

(B) Letter from E. E. Van Brunt, Jr., ANPP, to G. M. Knighton, NRC, dated December 10, 1984 (ANPP-31417)

Dear Mr. Knighton:

Reference (A), as provided by 10CFR 50.12(a), requested a partial exemption from the provisions of General Design Criterion 4 (GDC-4) for PVNGS Units 1, 2, and

3. Specifically, reference (A) requested exemption from those portions of GDC-4 which require protection of structures, systems, and components against certain dynamic effects associated with postulated Reactor Coolant System (RCS) main loop pipe breaks. Subsequent to the submittal of reference (A), ANPP was informally advised by the NRC that the Exemption Request would be denied for Unit 1, and that for Units 2 and 3, the matter should be presented through the process of amendment of construction permits rather than through the exemption process.

Reference (B) provided the application for Amendments of Construction Permits CPPR-142 and CPR-143, PVNGS Units 2 and 3, respectively. This application sought authorization to modify Units 2 and 3 by deleting protective devices, which were required to guard against dynamic effects of postulated double-ended guillotine breaks in the RCS main loop piping. Recently, ANPP was 'informally advised by the NRC that exemption from the regulations cannot be granted on this matter for the life of the units. Further, to allow processing of the application to amend the construction permits, a schedular exemption request from the requirements of GDC-4, until the end of the second refueling outage, would be needed. This schedular exemption should be sufficient to allow the completion of the rulemaking process on this subject.

As provided by 10CFR 50.12(a), Arizona Public Service Company hereby requests for PVNGS Units 2 and 3, a partial exemption from 'the provisions of GDC-4, as requested and justified in reference (A), for a period ending with the completion of the second .

refueling outage of each unit.

Also, Arizona Public Service Company hereby requests that construction permits, CPPR-142 and CPPR-143, be amended to permit the implementation of the exemption upon its issuance.

II@

8507220095 8507i6 goo I

(

PDR ADOCK 05000529' PDR AOII'<~

k a

  • ~ C

pf IJ G. W. Knighton Request for Schedular Exemption to GDC4 ANPP-33037 Page 2 Specifically, we request that Paragraph 3 of the Construction Permits be amended by inserting the underlined phrase shown below:

this permit shall be deemed to contain and be subject to the conditions specified in Section 50.54 and 50.55 of said regulat'ions; is subject to all applicable provisions of the Act, and rules, regulations, and order of the Commission now or hereafter in effect, as modified b

', dul authorized exem tions'e also request that Paragraph 3.C of the Construction Permits be revised by inserting the underlined phrases shown below:

tt t

this construction permit authorizes the applicants to cohstruct the

.facility described in the application as modified b dul authorized Enclosed, in accordance with 10CFR 170.12, is a check in the amount of $ 150.00 as payment of the application fee.

Very truly yours, zzu E. E. Van Brunt, Jr.

Executive Vice Presient Project Director EEVBJr/TFQ/slh cc: R. P. Zimmerman E. A. Licitra A. C. Gehr