Forwards Insp Repts 50-528/85-08 & 50-529/85-09 on 850311-0428 & Notice of Violation
ML17299A329
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/16/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17299A330 List:
References
NUDOCS 8506060706
Download: ML17299A329 (4)


See also: IR 05000311/2004028

Text

MAY 16 19SS

Docket Nos. 50-528

50-529

Arizona Nuclear Power Project

P. 0.

Box 52034

Phoenix,

Arizona

85072-2034

Attention:

Mr. E. E. Van Brunt Jr.,

Executive Vice President

Gentlemen:

Subject:

NRC Inspection of Palo Verde Units

1 and 2.

This refers to the inspection

conducted

by Messrs.

R.

Zimmerman,

G.

Fiorelli, and

C. Bosted of this office on March ll through April 28,

1985

of activities authorized by NRC License No. NPF-34 and

NRC Construction

Permit Number

CPPR

142 and to the discussion of our findings held with

yourself and other members of your staff at the conclusion of the

inspection.

Areas

examined during this inspection are described in the enclosed

inspection report.

Within these

areas,

the inspection consisted of

selective

examinations

of procedures

and representative

records,

interviews with personnel,

and observations

by the inspector.

Based

on the results of this inspection, it appears

that several of,your

activities were not conducted in full compliance with NRC requirements,

as set forth in the Notice of Violation, enclosed

herewith as Appendix A.

You are required to respond to this letter and in preparing your

response,

you should follow the instructions in Appendix A.

We consider the enclosed violations,

coupled with your identification of

two recently missed

surveillance tests,

to be an early indicator that

increased effort may be warranted to ensure that compliance with

Technical Specification requirements is achieved

and maintained

as you

approach

power operation.

We believe you should focus the necessary

attention to ensure your staff's implementation of plant administrative

and operational control systems

are effective in precluding future

Technical Specification violations.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the

enclosure will be placed in the

NRC Public Document Room.

8506060706

850516

PDR

ADOCK 05000528

9

PDR

',

1

]

Y

r

It

P

tJ

~

I

t'

~

HAY i6 1986

Should you have any questions

concerning this inspection,

we will be

pleased

to discuss

them with you.

Sincerely,

Projects

Ortoinal stgned

by

Q, P. Klr:ch

D. F. Kirsch, Acting Director,

Division of Reactor Safety

and

Enclosure:

Inspection Report Numbers 50-528/85-08

50-529/85-09

cc w/enclosure:

J.

R.

Bynum,

PVNGS Plant Manager

S.

R. Frost, Supervisor,

Nuclear Operations Licensing, Sta.

40804

T.

D. Shriver, Manager, Quality Systems

6 Engineering

W.

E. Ide, Manager,

Corporate

QA/QC

C.

N. Russo,

Manager,

QA Audits/Monitoring

Ms. J. Morrison

Ms. L. Bernabei,

GAP

Arthur C. Gehr,

Esq.

bcc:

RSB/Document Control Desk (RIDS)

pink/green/docket file copies

Mr. Martin

Resident Inspector

LFMB

sue dot

5/)Q/85

ZIE1ERMAN/

/

7 ORELLI

5/( /85

BOSIEB

MILLER

KIRSCH

J'p

ppd

5/i'5/85

5//5 /85

5/f~/85

s /0 / 8+

I

~

~

~

<

~ I

I

g

I

~

~