ML17299A315
| ML17299A315 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 05/14/1985 |
| From: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17299A317 | List: |
| References | |
| NUDOCS 8506050376 | |
| Download: ML17299A315 (2) | |
See also: IR 05000529/1985015
Text
8506050376 8505i4
ADOCK 05OOOM9
9
Docket Nos. 50-529,
50-530
Arizona Nuclear Power Project
P. 0. Box 52034
Phoenix, Arizona
85072-2034
XAV ~4 ~98S
Attention:
Mr. E. E.
Van Brunt, Jr.
Executive Vice President
Gentlemen:
Subject:
NRC Inspection of Palo Verde Units 2 and
3
This refers to the inspection
conducted
by Mr.
W. J.
Wagner of this office on
April 8-12 and 22-26,
1985, of activities authorized by NRC Construction
Permit Nos.
CPPR-142,
and 143,
and to the discussion of our findings held with
members of your staff at the conclusion of the inspection.
Areas
examined during this inspection are described in the enclosed inspection
report.
Within these
areas,
the inspection consisted of selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
No violations of NRC requirements
were identified within the scope of this
inspection.
In accordance
with 10 CFR 2.790 (a),
a copy of this letter and the enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection,
we will be glad to
discuss
them with you.
Sincerel
,
D. F. Ki sch, Acting Director
Division Reactor Safety and Projects
Enclosure:
Inspection Report Nos. 50-529/85-15,
50-530/85-11
cc w/enclosure J.
Bynum,
S.
R. Frost,
T. D. Shriver,
W. E. Ide,
C. N. Russo,
J. Morrison
1. Bernabei,
GAS
A. C. Gehr, Esq., Snell 8 Wilmer
Duke Railsback,
Arz. Corp.
Comm.
bcc
RSB/Document Control Desk
(RIDS)
Mr. Hartin
Project Inspector,
Resi ent Xnspe) or (2)
RV: az
Wagrikr
Youn
lier
te
5//0/85
5//P/85
5/g /85
5//3/85
Kirs h
5/lg /85
~),
1
i.
i+i
,irj'
i5