UNITED STATES NUCLEAR REGULATORY COMM(SSION WASHINGTON, D. C. 20555 NAY 1 0 1985 Docket Nos.:
50-528, 50-529 and 50-530 APPLICANT:
FACILITY:
SUBJECT:
Arizona Public Service Company Palo Verde, Units 1, 2 and 3
SUMMARY
OF MEETINGS TO DISCUSS CHAPTER 15 ANALYSES Meetings were held on March 14, and April 3, 1985, in Bethesda, Maryland with representatives of the applicant.
The purpose of the meetings was to discuss the scope and schedule for the Chapter 15 reanalyses in response to License Condition 21 in the Palo Verde Unit 1 low power license (NPF-34).
At the April 3 meeting, the issue of increased blowdown from the pressurizer safety valves (License Condition 22).was also discussed.
Attendees for the two meet-ings are shown on Enclosures 1 and 2.
The meetings are summarized as follows.
CHAPTER 15 REANALYSES At the March 14, 1985 meeting, the applicant identified the plant system and performance changes that are being considered for establishing the scope for
, the Chapter 15 reanalyses in response to License Condition 21.
These include (1) the previously identified changes submitted by letters dated November 5
and December 20, 1984, (2) changes to the auxiliary feedwater flow, containment spray pump flow, and safety valve blowdown, and (3) potential changes to boron concentration and temperature dependent shutdown margin.
The applicant also presented a categorization of the Chapter 15 events using the four categories identified in Section 15 of Supplement No.
7 to the SER.
For these
- events, the applicant tentatively identified which events would be reanalyzed.
The applicant indicated that it would provide the staff with further identification at a follow-up meeting, including a proposed schedule for submittal of the reanalyses.
Subsequent to the March 14 meeting, the staff provided telephone coIIIIents on the presentation relating to
( 1) the reanalysis of Category 4B events (where reduced system performance results in reduced margin), (2) limiting small break LOCA analyses, (3) limiting feedline break analyses, and (4) evaluation of future system and performance changes which effect Category 4B and Category 3 events (where actuation of the effected system occurs after the transient peak is reached).
At the April 2, 1985 meeting, the applicant further discussed the scope of Chapter 15 reanalyses.
The staff stated that justification is required for those Category 4B events which will not be reanalyzed.
In addition, a program needs to be established which takes into account the as-built configuration 850524014i 8505i0 PDR ADOCK 05000528 P
- PDR,
I
~ r
for evaluation'f future system and performance changes that effect Category 3
events and unanalyzed Category 4B events.
The applicant indicated that its response will address the staff comments.
The applicant stated that a response to License Condition 21 would be provided by mid April 1985 and will include a scheduled date of October 1,
1985 for submittal of the reanalyses.
SAFETY VALVE INCREASED BLOWDOWN At the April 3, 1985 meeting, the issue of increased blowdown from the pressurizer safety valves was also.discussed.
The staff had requested additional information on this matter by letter dated March 12, 1985.
During the meeting, the applicant discussed its proposed responses to the questions.
The staff stated that the proposed answers would provide the required information.
E. A. Licitra, Project Manager Licensing Branch No.
3 Division of Licensing
Enclosures:
( 1)
Meeting Attendees
- March 14, 1985 (2)
Meeting Attendees
- April 03, 1985 cc:
See next page DL:LB53Q Y EALicitra/es 5/J'/ 55 Bg3 1ghton 5/
/85
V'1 F
Iv HP
\\
1 PH 1
1'~ I 1 hN a
~FR
'F
~,I F Pflll'1 F'I VIV
'1, [VI "j',
\\
H FF c I
1
~
~
H
- (
Fh h'
Palo Verde Mr. E.
E.
Van Brunt, Jr.
Executive President Arizona Nuclear Power Pro,iect P. 0.
Box 52034 Phoenix, Arizona 85072-2034
~Arthur C. Gehr, Esq.
Snell 5 Wilmer 3100 Valley Center Phoenix, Arizona 85073 Mr. James M. Flenner, Chief Counsel Arizona Corporation Commission 1200 West Washington Phoenix, Arizona 85007 Charles R. Kocher, Esq. Assistant Counsel James A. Boeletto, Esq.
Southern California Edison Companv P. 0.
Box 800
- Rosemead, California 91770 Ms. Margaret Walker Deputy Director of Energy Programs Economic Planning and Development Office 1700 West Washington Phoenix, Arizona 85007 Mr. Wayne Shirley Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Mr. Roy Zimmerman U.S. Nuclear Regulatory Commission P. 0.
Box 239 Arlington, Arizona 85322 Ms. Patricia Lee Hourihan 6413 S.
26th Street Phoenix, Arizona 85040 Regional Administrator - Region V
U. S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Kenneth Berlin, Esq.
Winston 5 Strawn Suite 500 2550 M Street, NW Washington, DC 20037 Ms. Lynne Bernabei Government Accountability Project of the Institute for Policy Studies 1901 gue Street, NW Washington, DC 20009 Ms. Jill Morrison 522 E. Colgate Tempi, Arizona 85238 Mr. Charles B. Brinkman, Manaqer Washington Nuclear Operations Combustion Engineering, Inc.
7910 Woodmont Avenue Suite 1310
- Bethesda, Maryland 20814 Mr. Ron Rayner P. 0.
Box 1509
- Goodyear, AZ 85338
A I
nclosure 1
.'PALO VERDE CHAPTER 15 ANALYSES MEETING ATTENDEES (MARCH 14, 1985)
Name Nanny Licitra L. B. Marsh J.
S. llermiel C.'. Liang Fred L. Carpentino S. Eric Johnson
.Miles Lee Clyde Gerald W. Sower Terry Juan Steve Shepherd Dave Bajumpaa Mike Barnoski Joe Rezendes Tim Collier Kris McCandless Margaret Chatterton Affiliation NRC/DL/LB3
'RC/DS I/RSB NRC/DSI/ASB NRC/DS I/RSB CE CE ANPP ANPP ANPP Bechtel CE CE CE CE ANPP NRC/DS I/CP8
L, 1
C
Enclosure 2
PALO VERDE CHAPTER 15 ANALYSES Meetinq Attendees (April 3, 1985)
Name Nanny Licitra Steve Shepherd Mike Barnoski Dave Bajumpaa George Davis Gerald Sowers Kris McCandless Tim Collier Fred Carpentino Chu-Yu Liang John Huang J.
S.
Guo Affiliation NRC/DL/LB3 Bechtel CE CE CE APS APS CE
'E NRC/DS I/RSB NRC/DSI/CSB NRC/DS I/CSB
Sly)0]
MEETING
SUMMARY
DISTRIBUTION
~Docket:No(s)'.--5O 5pB/5pg/53O NRC PAR Local PDR NSIC PRC System LB3 Reading
- Attorney, OELD GWKnighton Project Manager JLee NRC PARTICIPANTS E.
A. Licitra LE B. Marsh J.
S.
Wermiel G.
Y. Liang M. Chatterton J.
Huang J.
S.
Guo bcc:
Applicant 5 Service List
1