ML17298C078

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-528/85-04 & 50-529/85-06 on 850201-0310 & Notice of Violation
ML17298C078
Person / Time
Site: Palo Verde  
Issue date: 04/09/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17298C079 List:
References
NUDOCS 8504290089
Download: ML17298C078 (4)


See also: IR 05000201/2003010

Text

Docket Nos. 50-528,

50-529

Arizona Public Service

Company

P. 0. Box 21666

Phoenix, Arizona

85036

Attention:

Mr. E. E. Van Brunt Jr.,

Vice President,

Nuclear Production

Gentlemen:

Subject:

NRC Inspection of Palo Verde Units

1 and 2.

This refers to the inspection

conducted

by Messrs.

R.

Zimmerman,

G. Fiorelli,

and

C. Bosted of this office on February

1 - March 10,

1985 of activities

authorized

by NRC License

No. NPF-34 and

NRC Construction Permit Number

CPPR

142 and to the discussion of our findings held with yourself and other members

of your staff at the conclusion of the inspection.

Areas

examined during this inspection a'e described in the enclosed

inspection

report.

within these

areas,

the inspection consisted

of selective

examina-

tions of procedures

and representative

records,

interviews with personnel,

and

observations

by the inspector.

Based

on the results of this inspection, it appears

that one of your activi-

ties

was not conducted in full compliance with NRC requirements,

as set forth

in the Notice of Violation, enclosed

herewith as Appendix A. You are required

to respond to this letter and in preparing your response,

you should follow

the instructions in Appendix A.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

The responses

directed by this Notice are not subject to the clearance

procedures

of the Office of Management

and Budget as required by the Paperwork

Reduction Act of 1980,

PL 96-511

'504290089

850409

PDR

ADOCK 05000528

8

PDR

I,

/

1

A

II

APR 09

198'hould

you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

D. F.

rsch, Acting Director,

Division of Reactor Safety

and Projects

Enclosure:

A.

Appendix A - Notice of Violation

B.

Inspection Report Numbers:

50-528/85-04

50-529/85-06

cc w/enclosure:

J.

R.

Bynum,

PVNGS Plant Manager

S.

R. Frost, Supervisor,

Nuclear Operations Licensing, Station.

40804

T.

D. Shriver,

Manager, Quality Systems

8 Engineering

W.

E. Ide, Manager,

Corporate

QA/QC

C.

N. Russo,

Manager,

QA Audits/Monitoring

Ms. J. Morrison

Ms. L. Bernabei,

GAP

Arthur C. Gehr, Esq., Snell 8 Wilmer

Zzmmerman

3/~85

orelli

3/Z&85

osted

M ler q

~ irs h

J pl<~~

3/Z~/85, 3/~85

. /

/,85

$/$ (gs

/(is<<~

~

~

M

~,