ML17298C075

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-528/85-06,50-529/85-11 & 50-530/85-08 on 850304-08.No Violation Noted
ML17298C075
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/04/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17298C076 List:
References
NUDOCS 8504290014
Download: ML17298C075 (4)


See also: IR 05000528/1985006

Text

~gS RECy,

Op

I

VL

+>>*<<+

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1450 MARIALANE,SUITE 210

WALNUTCREEK, CALIFORNIA94596

APR Og )gsg

Docket Nos. 50-528,

50-529 and 50-530

Arizona Public Service

Company

P. 0.

Box 21666

Phoenix, Arizona 85036

Attention:

Mr. E. E. Van Brunt, Jr., Vice President

Nuclear Projects

Gentlemen:

Subject:

NRC Inspection of Palo Verde Units 1,

2 and

3

This refers to the inspection conducted

by Messrs.

P. gualls of this office,

C.

Ramsey of the

NRC Region III office, A. Singh of the

NRC Auxiliary Systems

Branch,

and E. McDougall and B. Gunther of Brookhaven National Iaboratory on

March 4-8,

1985, of activities authorized by NRC License No. NPF-34 and

NRC

Construction Permit Nos.

CPPR-142

and 143,

and to the discussion of their

findings held with members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

No violations with NRC requirements

were identified within the scope of this

inspection.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

~

III'"'288M 89888)

'

fj

I ~

I

t

Arizona Public Service

Company

- 2-

APR 04 j98g

Should you have any questions

concerning this inspection,

we will be glad to

discuss

them with you.

Sincerely,

fSf

D, F. Kirsch, Acting Director

Division Reactor Safety and Projects

Enclosure:

Inspection Report

Nos. 50-528/85-06

50-529/85-11

50-530/85-08

CC:

J.

Bynum,

APS

S.

R. Prost,

APS

T. D. Shriver,

APS

W. E. Ide,

APS

C. N. Russo,

APS

Ms. Jill Morrison

lynne Bernabei

Arthur C. Gehr,

Esq.

(w/o enc)

bcc:

RSB/Document Control Desk

(RIDS)

Mr. J. Martin

Resident Inspector

RV

Pgualls:dh

4/+/85

RIII

CRamsey

4/ 5 /85

TYou g

LHi ler

RPa

e

DKir ch

4/ P /85

4/ P. /85

4/g /85 4/g /85