ML17298C054

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-528/84-59,50-529/84-39 & 50-530/84-28 on 841126-850125.No Violation Noted
ML17298C054
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/27/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17298C056 List:
References
NUDOCS 8504180610
Download: ML17298C054 (4)


See also: IR 05000528/1984059

Text

g(!'i REQIj

~o

~

~Q

~

+

/p +a**+

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1450 MARIALANE,SUITE 210

WALNUTCREEK, CALIFORNIA94596

MAR 27 1985

Dock(et Nos. 50-528, 50-529,

50-530

Arizona Public Service

Company

P. 0. Box 21666

Phoenix, Arizona 85036

Attention:

Mr. E. E. Van Brunt, Jr., Vice President

Nuclear Production

Gentlemen:

Subject:

NRC Inspection of Palo Verde Units 1,

2 and

3

This refers to the inspection

conducted

by Messrs.

J. Eckhardt and A. Hon of

this office on November 26,

1984, through January

25,

1985, of activities

authorized by NRC Operating License

No. NPF-34 and Construction Permit

Nos.

CPPR-142

and 143,

and to the discussion of our findings held with members

of your staff at the conclusion of the inspection.

Areas

examined during this inspection are described in the enclosed inspection

report.

Within these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

No violations with NRC requirements

were identified within the scope of this

inspection.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document Room.

Doc~

B~O~~'7

-'

~80418O61O

8

O>OOOSg8,

"R

~i

@~I I

4

0

Arizona Public Service

Company

- 2-

HAP 2'7 1985

Should you have any questions

concerning this inspection,

we will be glad to

discuss

them with you.

Sincerely,

ps/

D. F. Kirsch, Acting Director

Division of Reactor Safety

and

and Projects

Enclosure:

Inspection Report

Nos.

50-528/84-59

50-529/84-39

50-530/84-28

cc w/enclosures:

J.

Bynum,

APS

S.

R. Frost,

APS

T. D. Shriver,

APS

M. E. Ide,

APS

C.

N. Russo,

APS

J. Morrison

L. Bernabei,

GAP

A. C. Gehr,

Esq.

bcc:

RSB/Document Control Desk

(RIDS)

Mr. J. Martin

Resident Inspector

Project Inspector

RV @L

y< AHon:dh

JEckhardt

IMiller

t

3/p,(p /85

Ar 3/gg /85

Joe 3/p.(p/85

ACha fee

3/g7/85

DKirsch

3/g,p/85

~ ~