Confirms Completion of Qualification of Target Rock Solenoid Valves,Anchor Darling air-operated Valves & Remote Shutdown Panels,Per License Conditions C6(b),C18(a) & C18(c), Respectively & Dec 1984 SER
ML17298C039
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 04/12/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
References
ANPP-32383-EEVB, NUDOCS 8504160069
Download: ML17298C039 (6)


Text

REGULATOR NFORMATION DISTRIBUTION S "TEM (RIDS)

ACCESSION ABR:8504160069 DOC ~ DATE: 85/04/12 NOTARIZED:

NO DOCKET. 0 FACIL:STN-50-528 Palo Verde Nuclear Station~

Unit li Arizona Publi 05000528 AUTH ~ NAME AUTHOR AFF ILIATION VAN BRUNTiE ~ E, Arizona Public Service Co ~

RECIP.NAME RECIPIENT AFFILIATION KNIGHTON g G+ H ~

Licensing Branch 3

SUBJECT:

onfirms completion of qualification of Target Rock solenoid valvesiAnchor Darling air operated valves 8

remote, shut'down panels~per License Conditions C6(b)~C18(a) 8 C18(c)g respectively 8,

Dec 1984 SER.

DISTRIBUTION CODE:

A048D COPIES RECEIVED:LTR ENCL SIZE; I

0 TITLE: OR/Licensing Submi t ta 1: Equipment Qualification NOTES:Standardized plant ~

OL;12/31/84 05000528 RECIPIENT ID CODE/NAME'RR LB3 BC 12 INTERNAL; ACRS 15 ELD/HDS3 12 GC 13 NRR/DE/EQB 07 NRR/0S I/AEB RGN5 COPIES LTTR ENCL 8

1

?

1 1

RECIPIENT ID CODE/NAME LICITRAg E 01.

ADM/LFMB ELD SHIELDS g N NRR KARSCHgR N

R 14 G

LE 04 COPIES LTTR ENCL 1

FXTERNAL: LPDR NSIC 03 05 NRC PDR 02 TOTAL NUMBER OF COPIES REQUIRED:

LTTR

. 24 ENCL

Arizona Nuclear Power Project P.O.BOX52034 e

PHOENIX,ARIZONA85072-2034 Director of Nuclear Reactor Regulation April 12, 1985 Mr. George W. Knighton, Chief ANPP-32383-EEVB/TFQ/BJA Licensing Branch No.

3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1 Docket No.

STN '50-528, License No. NPF-34 License Conditions C6(b), C18(a),

C18(c)

File: 85-056-026 G.l.01.10

References:

(1)

Letter from E. E.

Van Brunt, Jr.,

ANPP, to G.

W. Knighton,

NRC, dated December 7,

1984 (ANPP-31379);

Subject:

PVNGS Environmental Qualification Program.

(2)

Letter from E. E.

Van Brunt, Jr.,

ANPP, to G.

W." Knighton,

NRC, dated December 10, 1984 (ANPP-31416);

Subject:

PVNGS Pump and Valve Operability Assurance Program.

(3)

Letter from E. E.

Van Brunt, Jr.,

ANPP, to G.

W. Knighton,

NRC, dated December 7,

1984 (ANPP-31380);

Subject:

PVNGS Seismic Qualification Program.

(4)

Safety Evaluation Report related to the Operation of Palo Verde Nuclear Generating Station Units 1, 2, and 3

dated

December, 1984 (Supplement 7).

Dear Mr. Knighton:

Reference (1) submitted a Justification for Interim Operation (JIO) for PVNGS-Unit 1 in order to complete the environmental qualification of eight Target Rock Solenoid Valves.

Accordingly, by the issuance of the Unit 1 Operating License, the staff has imposed license condition C6(b) for ANPP to complete the modifications required to ensure the environmental qualification of the Target Rock Solenoid Valves prior to initial entrance into Mode 3.

ANPP confirms that we have completed the modifications to the Target Rock Solenoid Valves and we now consider these valves environmentally qualified for use at PVNGS in accordance with the provisions of 10 CFR 50.49.

Reference (2) submitted a JIO for PVNGS-Unit 1 in order to complete modifications and operability testing of four Anchor Darling Air Operated Valves.

Subsequently, the staff has imposed license condition C18(a) for ANPP to complete the modifica-tions and operability testing of the Anchor Darling Air Operated Valves prior to initial entrance into Mode 3.

ANPP confirms that we have completed the modifica-tions and the operability testing of these four valves and they are now considered qualified for operation at PVNGS-Unit 1.

Reference (3) submitted a JIO for PVNGS-Unit 1 in order to verify the seismic qualification of the two remote shutdown panels.

Subsequently, the staff has imposed license condition C18(c) for ANPP to complete the seismic qualification of the remote shutdown panels prior to initial criticality.

ANPP confirms that we have completed the seismic qualification of the remote shutdown panels.

The remote shutdown panels are now seismically qualified for use at PVNGS.

h 8504160069 850412 PDR ADOCK 05000528I F'DR

0

~r

Mr. George W. Knighton License Conditions C6(b), C18(a),

C18(c),

ANPP-32383 Page 2

4 Chapter 3 of Reference (4) requests ANPP to confirm the completion of the qualifica-tion of the above items.

This letter fulfills'he requirements of Refe'rence '(4).

If you have any questions, please contact me.

II Very truly your's E. E.

Van Brunt, Jr.

Executive Vice President Project Director EEVB/TFQ/BJA/mb cc: