ML17298B898

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-528/84-51 & 50-529/84-35 on 841021-1214.No Violations Identified
ML17298B898
Person / Time
Site: Palo Verde  
Issue date: 02/05/1985
From: Kirsch D, Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17298B900 List:
References
NUDOCS 8502200190
Download: ML17298B898 (4)


See also: IR 05000528/1984051

Text

UNITED STATES

NUC'I EAR iIEGULATORYCOMMISSION

REGION V

1450 MARIALANE,SUITE 210

WALNUTCREEK, CALIFORNIA94596

FEB 5

tgeg

tE FiLE COPV

Docket No's. 50-528

50-529

Arizona Public Service

Company

P.O.

Box 21666

Phoenix, Arizona 85036

Attention: Mr. E. E. Van~grunt Jr.,

Vice President,

Nuclear Production

Gentlemen:

Subject:

NRC Inspection of Palo Verde Units

1 and 2.

This refers to the inspection

conducted

by Messrs.

R.

Zimmerman,

G. Fiorelli,

and

C. Bosted of this office on October

21 - December

14,

1984 of activities

authorized

by NRC Construction Permit Nos.

CPR

141

and

142 and to the

discussion of our findings held with yourself and other members of your staff

at the conclusion of the inspection.

Areas

examined during this inspection are described in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

No violations of NRC requirements

were identified within the scope of this

inspection.

In accordance

with 10

CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

!

OCX OS000S28

200190 850205

PDR

AD

PDR

Q

t

t

I

l

f

"2-

FEB 5

>SSS

ona Public Service

Company

V

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

D. K. Kirsch, Acting Director

Division of Reactor Safety and Projects

Enclosure:

Inspection Report

Nos.

50-528/84-51

50-529/84-35

cc

w/enclosure:'.

Bynum,

PVNGS Plant Manager

S.

R. Prost,

Supervisor Nuclear Operations

Licensing, Station 4080

T. D. Shriver,

Manager, Quality Systems

8 Engineering

M. E. Ide, Manager,

Corporate

QA/QC

C. N. Russo,

Manager,

QA Audits/Monitoring

Ms. Jill Morrison

Lynne Bernabei,

GAP

Arthur Gehr, Esq.

bcc:

RSB/Document Control Desk

(RIBS)

Mr. J. Martin

Resident Inspector

Project Inspector

G. iorelli:dh

.Bosted

1/~g /85

1/~Q /85

R.Zimmerman

1/qg /85

L. ilier

1/g /85

A.Chaffee

D.Kz.

h

/ 5 /85

&5 /85

J)

.~e