Docket No.:
50-528 JAN 38 585 Mr. E.
E.
Van Brunt, Jr.
Vice President - Nuclear Projects Arizona Public Service Company Post Office Box 21666 Phoenix, Arizona 85036
Dear Mr. Van Brunt:
DISTRIBUTION
~50-528 NRC PDR NGrace L PDR EJordan NSIC PRC System LBP3 Reading JLee EALicitra
- Attorney, OELD ACRS (16)
Subject:
Completion of Licensing Review for Palo Verde, Unit 1
Supplement No.
7 to the Palo Verde SER, which was issued on December 31,
- 1984, discussed the resolution of all the issues relating to initial licensing of Palo Verde Unit 1.
Supplement No.
7 also identified several issues which require resolution prior to issuance of a full power license.
Enclosure 1 identifies the remaining issues which includes those under staff review and the issues for which additional information is required, as identified in Supplement No. 7.
For those requiring additional infirmation, Enclosure 1 includes a date for submittal to permit the staff to complete its review in a timely manner.
We request that you confirm in writing one week after receipt of this letter, the dates for submittal of the required information.
If you have any questions regarding this letter, you should contact Mr. E. Licitra, the Licensing Project Manager.
Sincerely, ORIGINALSIGNED BY
Enclosure:
As stated cc:
See next page George W. Knighton, Chief Licensing Branch No.
3
,Division of Licensing DL:LB53glY D
EALicitra/yt G
hton lg g/85 leaf
/85 8502070437 850f28 PDR ADOCK 05000528 E
P II p
l II C
g ~,il F
~'-
~
y IP I
1
Palo Verde Mr. E.
E.
Van Brunt, Jr.
Vice President - Nuclear Projects Arizona Public Service Company P. 0.
Box 21666 Phoenix, Arizona 85036 Arthur C. Gehr, Esq.
Snell 5 Wilmer 3100 Valley Center Phoenix, Arizona 85073 Mr. James M. Flenner, Chief Counsel Arizona Corporation Commission 1200 West Washington Phoenix, Arizona 85007 Charles R. Kocher, Esq. Assistant Counsel James A. Boeletto, Esq.
Southern California Edison Company P. 0.
Box 800
- Rosemead, California 91770 Ms. Margaret Walker Deputy Director of Energy Programs Economic Planning and Development Office 1700 West Washington Phoenix, Arizona 85007 Mr. Rand L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Resident Inspector Palo Verde/NPS U.S. Nuclear Regulatory Commission P. 0.
Box 21324 Phoenix, Arizona 85001 Ms. Patricia Lee Hourihan 6413 S. 26th Street Phoenix, Arizona 85040 Regional Administrator - Region V
U. S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Kenneth Berlin, Esq.
Winston
& Strawn Suite 500 2550 M Street, NW Washington, DC 20037 Ms.
Lynne Bernabei Government Accountability Proiect of the Institute for Policy Studies 1901 gue Street, NW Washington, DC 20009 Ms. Jill Morrison 522 E. Colgate Tempi, Arizona 85238
j f
t IJ!
Enclosure 1
Palo Verde Unit 1
List of Issues Requiring Resolution Prior to Issuance of a Full Power License A.
Resolution Re uired Before Initial Criticalit 1.
Chemistry Control and Sampling Systems (Sectin 9.3, SSER 7) 2.
Increased Blowdown of Pressurizer Safety Valves (Section 5.4, SSER 7) 3.
Revised Chapter 15 Analyses, Scope and Schedule (Section 15, SSER 7) 4.
Operating Staff Experience Requirements (Section
- 13. 1.2.4, SSER 7)
Licensee
~In ut 2/1/85 3/1/85 3/15/85 4/1/85 B.
Resolution Re uired Before Exceedin 5X Power Operation 5.
Pressurizer Auxiliary Spray System Test (Section 5.4.3, SSER 7) 2/1/85 6.
Natural Circulation Cooldown Test (Section 5.4.3, SSER 7) 7.
Periodic Leak Testing of Containment Isolation Valves (Section 6.2.4, SSER 7) 8.
FEMA Review of Offsite Emergency Plans (Section 13.3.3, SSER 7)
Under staff review Under staff review Under staff review