Forwards Insp Repts 50-528/84-54,50-529/84-37 & 50-530/84-26 on 841112-23.No Violation or Deviation Noted
ML17298B745
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/10/1984
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17298B746 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8412310275
Download: ML17298B745 (4)


See also: IR 05000528/1984054

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1450 MARIALANE,SUITE 210

WALNUTCREEK, CALIFORNIA94596

DFC j.03984

'<<>Le COPy

Mcket los. 50-528, 50-529,

50-530

Arizona Public Service

Company

P. 0.

Box 21666

Phoenix,

Arizona 85036

Attention:

Mr. E. E.

Van Brunt, Jr., Vice President

Nuclear Production

Gentlemen:

Subject:

NRC Inspection of Palo Verde Units 1,

2 and

3

This refers to the inspection

conducted

by Messrs.

P. Narbut,

R.

C. Sorensen

and D. Hollenbach of this office on November 12-23,

1984, of activities

authorized

by NRC Construction Permit Nos.

CPPR-141,

142,

and

143,

and to the

discussion of their findings held with members of your staff at the conclusion

of the inspection.

Areas

examined during this inspection are described in the enclosed

inspection

report.

Within these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

No violations or deviations

were identified within the scope of this

inspection.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

84i2310275 84i2i0

PDR

ADOCK 05000528

8

PDR

i

'

I

Arizona Public Service

Company

- 2-

gag g0 1984

Should you have any questions

concerning this inspection,

we will be glad to

discuss

them with you.

Sincerely,

Orfgfn"1 .iver,od by

D.

F. Klrsch

D. F. Kirsch, Acting Director

Division of Reactor Safety

and

projects

Enclosures:

Inspection Report

Nos. 50-528/84-54

50-529/84-Q5'l

50-530/84-26

cc w/enclosures:

W. E. Ide,

APS

'.

N. Russo,

APS

J.

Bynum, Plant Superintendent,

APS

S.

R. Frost, Supervisor

Nuclear Operations Licensing,

APS

T. D. Shriver,

Manager

(}uality Systems

8 Engineering

Ms. Jill Morrison

Lynne Bernabei,

GAP

Arthur C. Gehr,

Esq.

(w/o encl.)

bcc:

RSB/Document Control Desk (RIDS)

Mr. J. Martin

Resident Inspector

(2)

Project Inspector

av P& Wo~

pPpf~r

/PE

D.Hollenbach:dh

R.Sorensen

P.Narbut

~/ 3 /84

~/g /84

(Z

E

e ~is

D.Kirsch

3

8

4

1g// / 4

p.cL4E~

(a./(.Py

l.

lc

1