ML17298B663
| ML17298B663 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 11/29/1984 |
| From: | Wenslawski F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17298B664 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8412170501 | |
| Download: ML17298B663 (4) | |
See also: IR 05000528/1984049
Text
November 29,
1984
Docket Nos.
50-528
50-529
50-530
Arizona Public Service
Company
P. 0. Box 21666
Phoenix, Arizona
84036
Attention:
Mr. E. E. Van Brunt Jr.
Vice President,
Nuclear Production
Gentlemen:
fg
Subject:
NRC Inspection of Palo Verde Units 1,
2
& 3
This refers to the routine inspection
conducted
by Messrs.
C.
Sherman
and
M. Grayson of this office on November 5-9,
1984 and telephone
conversations
on
November 13-14,
1984 concerning activities authorized
by NRC Construction
Permit No. CPPR-141,
142 and
143 and to the discussion of our findings held by
Mr. Sherman with Mr. Zeringue
and other members of your staff at the
conclusion of the inspection.
Areas
examined during this inspection are described in the enclosed
inspection
report.
Within these
areas,
the inspection consisted
of selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
No violations of NRC requirements
were identified within the scope of this
inspection.
In, accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosure
will be placed in the
NRC Public Document
Room unless
you notify this office,
by telephone,
within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
the date of this letter.
Such application must be consistent with the
requirements
of 2.790(b)(1) .
gE ol
84i2i7050i 84ii29
ADOCK 05000528
't
,J
'K
l
JI
V
I
j
November 29,
1984
Arizona Public Service
Company
Should you have
any questions
concerning this inspection,
we will be glad to
discuss
them with you.
Sincerely,
F. A. Wenslawski, Chief
and
Radiological Protection Branch
Enclosure:
Inspection Report
No. 50-528/84-49
50-529/84-33
50-530/84-23
cc w/enclosure:
J.
Bynum, Plant Superintendent
S.
R. Frost, Supervisor
Nuclear Operations Licensing, Station 4080
T. D. Shriver, Manager
Quality Systems
& Engineering
Ms. Jill Morrison
Lynne Bernabei,
GAP
Arthur C. Gehr,
Esq.
(w/o encl.)
bcc:
RSB/Document Control Desk
(RIDS)
Distributed by RV:
Project Inspector
(w/enclosure)
Resident Inspector
(2 copies w/enclosure)
C. Sherman,
RV (w/enclosure)
W. Grayson,
RV (w/enclosure)
G. P. Yuhas,
RV (w/enclosure)
R. F. Fish,
RV (w/enclosure)
File Copy (w/enclosure)
Pink/Green
(w/o enclosure)
RV/jk
SHERMAN
GRAYSO
YUHAS 5"
ll/g f/84
11/Q9/84
ll/yl/84
ll/~/84
11/gy/84
WENELAWEKI~ MILLER~
e
0
'