Docket Nos. 50-528,
50-529,
50-530
Arizona Public Service
Company
P. 0.
Box 21666
Phoenix,
85036
I. FILE COPY.
Attention:
Mr. E. E. Van 'Brunt, Jr., Vice President
Nuclear Production
Gentlemen:
Subject:
NRC Inspection of Palo Verde Units 1,
2 and
3
This refers to the inspection conducted
by Messrs.
C. Clark and K. D. Ivey,
Jr. of this office on September
24 - October 5,
1984, of activities authorized
by NRC Construction Permit Nos.
CPPR-141,
142,
and 143,
and to the discussion
of their findings held with members of your staff at the conclusion of the
inspection.
Areas
examined during this inspection are described in the enclosed
inspection
report.
Within these
areas,
the inspection con'sisted of selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
Based
on the results of this inspection, it appears
that one of your
activities was not conducted in full compliance with NRC requirements,
as set
forth in the Notice of Violation, enclosed
herewith as Appendix A.
Your response
to this notice is to be submitted in accordance
with the
provisions of 10 CFR 2.201
as stated in Appendix A, Notice of Violation.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosure
will be placed in the
NRC Public Document
Room.
8412140341
84112b
ADOCK 05000528
I
8
p4
~
n
Should you have
any questions
concerning this inspection,
we will be glad to
discuss
them with you.
The responses
directed by this letter and the accompanying Notice are not
subject to the clearance
procedures
of the Office of Management
and Budget
as
required by the Paperwork Reduction Act of 1980,
PL 96-511.
Sincerely,
qjioinal signo~ by
p, p. girsch
D. P. Kirsch, Acting Director
Division of Reactor Safety
and Projects
Enclosures:
A.
B.
Inspection Report
Nos. 50-528/84-50
50-529/84-34'0"530/84-24
cc w/enclosures:
V. E. Ide,
C. N. Russo,
J.
Bynum, Plant Superintendent,
S.
R. Frost, Supervisor
.
Nuclear Operations Licensing,
T. D, Shriver,
Manager
equality Systems
Sr Engineering
Ms. Jill Morrison
Lynne Bernabei,
GAP
Arthur C. Gehr,
Esq.
(w/o encl)
'bcc:
RSB/Document Control Desk (RIBS)
Distributed by RV:
Project Inspector
(w/enclosures)
Resident Inspector
(2 copies - w/enclosures)
A. Johnson,
RV (w/enclosures)
Mr. Martin, RV (w/enclosures)
Pink and Green
(w/o enclosures)
File copy (w/enclosures)
Pl
L~IPS /
CLARK
~
11/gl/84
ll/8~ 84
CHAFZEE
ii/Ql/84
MILLER
1 lpga/84
JOHNSON
ii/gr/84
// z>
I