APPENDIX A NOTICE OF VIOLATION Arizona Public Service Company P.
O. Box 21666
- Phoenix, Arizona 85036 Docket No. 50-528 Construction No.
141 As a result of a,special inspection conducted on August 27-31, and September 8-15,
- 1984, and in accordance with NRC Enforcement Policy, 10 CFR Part 2, Appendix C, the following violation was identified:
Criterion V, to Appendix B of 10 CFR 50, states, in part, "Activities affecting quality shall be prescribed by documented Instructions, Procedures...and shall be. accomplished in accordance with these instructions, Procedures, or Drawings."'echtel Engineering Department Procedure No. 5.34, states, in part, in paragraph 4.0, that. "...Completion of training shall be within 60 days of the employee's date of assignment to the project/staff..."
Contrary to the above at the time of the inspection, it was found that about 30 out of 160 Bechtel project engineers did not have training records to substantiate compliance with the above requirement.
Additionally, it. was found that management was aware of their staff's failure to comply with the training requirements as evidenced by an Interoffice Memorandum, dated October 18, 1983.
This is a Severity Level'IV Violation (Supplement II)
Pursuant to the provisions of 10 CFR 2.201, Arizona Public Service Company, is hereby required to submit to this office within thirty days of the date of this Notice, a written statement of explanation in reply, including:
(1) the corrective steps which have been taken and the results achieved:
(2) corrective steps which will be taken to avoid further items of noncompliance; and (3) the date when full compliance will be achieved.
Consideration may be given to extending your response time for good cause shown.