ML17298B468
| ML17298B468 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 10/16/1984 |
| From: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17298B469 | List: |
| References | |
| NUDOCS 8411060507 | |
| Download: ML17298B468 (4) | |
See also: IR 05000528/1983047
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION V
1450 MARIALANE,SUITE 210
WALNUTCREEK, CALIFORNIA94595
Docket No. 50-528
Arizona Public Service
Company
P. 0.
Box 21666
Phoenix, Arizona 85036
Attention:
Mr. E. E.
Van Brunt, Jr.
Vice President,
Nuclear Production
Gentlemen:
Subject:
NRC Inspection -'Palo Verde Unit
1 (Preoperational
Test Phase)
This refers to the inspection
conducted
by Messrs.
P.
H. Johnson
and
P.
C.
Gage of this office on September
19-23, 'October 4-7, October
18-21 and
No.
C
November 1-4,
1983, of activities authorized
by NRC Construction
P
t
o.
PPR-141
and to the discussion of our findings held by the inspectors with
r c ion
ermi
Messrs. Kirby and Hayes
and other members of the Arizona Public Service
Company staff at the conclusion of the inspection.
This inspection
was conducted in response
to allegations
received
regarding
conduct of the Unit
1 prerequisite test program,
as described in the enclosed
inspection report.
The inspection consisted of selective
examinations of
pro'cedures
and representative
records,
interviews with personnel,
and
observations
by the inspectors.
No violations of NRC requirements
were identified within the scope of this
inspection.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosure
will be placed in the
NRC Public Document
Room.
n
,84ii0b0507 8410ib
ADOCK 05000528
8
4
I,'4.Q
d
Arizona Public Service
Company
- 2-
Should you have any questions
concerning this inspection,
we will be glad to
discuss
them with you.
Sincerely,
T.
W. Bishop, Director
Division of Reactor Safety
and Projects
Enclosure:
Inspection Report
No. 50-528/83-47
CC:
J.
Bynum, Director, Nuclear Operations
S.
R. Frost, Supervisor,
Station 4080
T. D. Shriver,
Manager, Quality Systems
6 Engr.
W. E. Ide, Manager,
Corporate
QA/QC
C. N. Russo,
Manager,
QA Audits
Ms. Jill Morrison
Lynne Bernabei,
GAP
Arthus
C. Gehr, Esq.
bcc:
RSB/Document Control Desk (RIBS)
Mr. Martin
Resident Inspector
(2)
Project Inspector
RV
P.Jo
- dh
10/ )5/
P.Gage
iO/IS./84
L ilier
10/[(
/84
D. Kirsch
10//p /84
10/((
/84