ML17298B468

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-528/83-47 on 830919-23,1004-07,18-21 & 1101-04.No Violations Noted
ML17298B468
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 10/16/1984
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17298B469 List:
References
NUDOCS 8411060507
Download: ML17298B468 (4)


See also: IR 05000528/1983047

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION V

1450 MARIALANE,SUITE 210

WALNUTCREEK, CALIFORNIA94595

Docket No. 50-528

Arizona Public Service

Company

P. 0.

Box 21666

Phoenix, Arizona 85036

Attention:

Mr. E. E.

Van Brunt, Jr.

Vice President,

Nuclear Production

Gentlemen:

Subject:

NRC Inspection -'Palo Verde Unit

1 (Preoperational

Test Phase)

This refers to the inspection

conducted

by Messrs.

P.

H. Johnson

and

P.

C.

Gage of this office on September

19-23, 'October 4-7, October

18-21 and

No.

C

November 1-4,

1983, of activities authorized

by NRC Construction

P

t

o.

PPR-141

and to the discussion of our findings held by the inspectors with

r c ion

ermi

Messrs. Kirby and Hayes

and other members of the Arizona Public Service

Company staff at the conclusion of the inspection.

This inspection

was conducted in response

to allegations

received

regarding

conduct of the Unit

1 prerequisite test program,

as described in the enclosed

inspection report.

The inspection consisted of selective

examinations of

pro'cedures

and representative

records,

interviews with personnel,

and

observations

by the inspectors.

No violations of NRC requirements

were identified within the scope of this

inspection.

In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosure

will be placed in the

NRC Public Document

Room.

n

,84ii0b0507 8410ib

PDR

ADOCK 05000528

8

PDR

4

I,'4.Q

d

Arizona Public Service

Company

- 2-

Should you have any questions

concerning this inspection,

we will be glad to

discuss

them with you.

Sincerely,

T.

W. Bishop, Director

Division of Reactor Safety

and Projects

Enclosure:

Inspection Report

No. 50-528/83-47

CC:

J.

Bynum, Director, Nuclear Operations

S.

R. Frost, Supervisor,

Station 4080

T. D. Shriver,

Manager, Quality Systems

6 Engr.

W. E. Ide, Manager,

Corporate

QA/QC

C. N. Russo,

Manager,

QA Audits

Ms. Jill Morrison

Lynne Bernabei,

GAP

Arthus

C. Gehr, Esq.

bcc:

RSB/Document Control Desk (RIBS)

Mr. Martin

Resident Inspector

(2)

Project Inspector

RV

P.Jo

dh

10/ )5/

P.Gage

iO/IS./84

L ilier

10/[(

/84

D. Kirsch

10//p /84

10/((

/84