REGULATORY FORMATION DISTRIBUTION SY M (RIDS)
ACCESSION NBR: 841 FAGIL:STN 50 528 STN 50 529 STN~50 530 AUTH,NAME VAN BRUNTiE,E, REC IP ~ NAME KNIGHTONg G ~
0310297 DOC ~ DATE 84/10/29 NOTARIZED YES Palo Verde Nuclear Stationi Uni.t ii Arizona Publi Palo Verde Nuclear Station~
Unit 2i Arizona Publi Palo Verde Nuclear Station~
Unit 3~ Arizona Publi AUTHOR AFFILIATION Arizona Public Service Co ~
RECIPIENT AFFILIATION Licensing Branch 3
DOCKET 05000528 05000529 05000530
SUBJECT:
F'orwards "Palo Verde Nuclear Generating Station Remoto Shutdown Panel Human Factors Study!Executive Summary Rept L
"Palo Verde Nuclear Generating Station Control Room Human Factors Study" in response to request for addi info'ISTRIBUTION CODE:
8001D COPIES RECEIVED:LTR ENCL SIZE:
I TITLE: Licensing Submittal:
PSAR/FSAR Amdts L Related Correspondence NOTES:Standardized plant.
Standardized plant ~
Standardized plant ~
05000528 05000529 05000530 RECIPIENT ID CODE/NAME NRR/OL/ADL NRR LB3 LA INTERNAL>> AOM/LFMB IE FILE IE/DEPER/IRB 35 NRR ROEiM ~ I-NRR/DE/CEB 11 NRR/DE/EQB 13 NRR/OE/MEB 18 NRR/DE/SAB 24 NRR/OHFS/HFEB40 NRR/DHFS/PSRB NRR/DSI/AEB 26 NRR/OSI/CPB 10 NRR/DS I/ICSB 16 NRR/DS I/PSB 19 NRR/OSI/RSB 23 RGN5 EXTERNAL; ACRS 41 OMB/DSS (AMDTS)
LPOR 03" NSIC 05 COPIES LTTR ENCL 1
0 1
0 1
0 1
1 1
1 1
1 1
2 2
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 3
3 6
6 1
1 1
1 1
1 RECIPIENT ID CODE/NAME NRR LB3 BC LICITRAg E 01 ELO/HDS3 IF/DEPER/EPB 36 IE/DQA SIP/QA 821 NRR/OE/AEAB NRR/DE/EHEB NRR/DE/GB 28 NRR/DE/MTEB 17 NRR/OE/SGEB 25 NRR/DHFS/LQB 32 NRR/DL/SSPB NRR/DS I/ASB NRR/DS I/CSB 09 NRR/DSI/METB 12 NRR/
22 04 Rt1/D D AMI/MI8 BNL(AMDTS ONLY)
FEMA "REP DI V 39 NRC PDR 02 NTIS COPIES LTTR ENCL" 1
0 1
1 1
0 1
1 1
1 1
0 1
1 2
2 1
1 1
1 1
1 1
0 1
1 1
1 1
1 1
1 1
1 0
1 1
1 1
1 1
1 1
. Q. gaD~A TOTAL NUMBER OF COPIES REQUIRED>>
LTTR 59 FNCL
4 Il rhr,fh~ f
~
M Ih Wf lt fj W
hu
~ ~
1 I
It ~
hI I, f II tt rM W
M W
L Arizona Public Service Company Director of Nuclear Reactor Regulati'on Attention:
Mr. George Knighton, Chief Licensing Branch No.
3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555 October 29, 2984 ANPP-30986 TFQ/MAJ
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 and 3
Control Room Design Review Docket Nos. STN-50-528/529/530 File:
84-056-026'.1.01.10
References:
See Attachment 4
Dear Mr. Knighton:
Reference (A) requested that APS submit additional information to the NRC concerning the PVNGS Control Room Design Review (CRDR).
This information is needed by the staff to close out the Preliminary Design Assessment (PDA) of the CRDR.
Attached, is the APS response to the information requested per Reference (A)'."
Attachment 1 addresses the Remote Shutdown Panel Review and provides the details concerning the human factors evaluation of the panel, listing all of the Human Engineering Discrepancies (HED's), their corrective actions and implementation schedules.
Attachment 1 also provides the requested justification for those HED corrective actions extending beyond Unit 1 fuel load.
We believe Attach-ment 1 to this letter, together with References (B) and (C),
sufficiently address and close out the staff's PDA concerns relating to the Remote Shutdown Panel.
Attachment 2 represents Supplement 2 to the PVNGS Control Room Human Factors Study Executive Summary Report by Torrey Pines Technology.
This report provides the Control Room Environmental Survey results which identify 2 HED's, numbers 172 and 173.
NRC resolution of HED 172 was deferred until close. out of the Detailed Control Room Design Review (DCRDR).
This was discussed and agreed upon during the NRC's CRDR site audit on October 10 and 11, 1984.
APS will work with the NRC to determine a schedule for completion of HED 172, which, is considered part of-the DCRDR.
HED 173 will be complete and implemented prior to PVNGS Unit 1
exceeding 5X power operation. It should be noted that APS has proceeded in an extremely good faith effort to complete the Environmental Survey far ahead of the schedule given to the NRC by References (D) and (E).
84103>Oa97 84iOa9 PDR ADOCK 0500OMI8 F
PDR PO f gQ Q(. Pg~g'Fdd,
(
(/I Pqd g.
<<~/SPREE I
(
E
(- ~
Mr. George hton Control Room Design Review ANPP-30986 Page 2
Attachment 3 describes the currently incomplete HED's.
These HED's were previously identified by Reference (F) and were discussed with the staff during the October 10 and ll, 1984 site audit.
As requested by Reference (A) and by the staff during the site
- audit, APS will submit confirmation that all the HED's (except for those deferred by the staff to the DCRDR) are complete and implemented prior to PVNGS Unit 1 fuel load.
By submittal of this information, we feel we have sufficiently addressed the staff's PDA concerns to close out the issue.
If additional information is needed, please contact me.
Very truly yours, Gaumy~
EEVBJr/MAJ/no Attachments E.
E.
Van Brunt, Jr.
APS Vice President Nuclear Production ANPP Project Director cc:
A. C. Gehr E. A. Licitra R.P.
Zimmerman
I k I I
1
October 29, 1984 ANPP-30986 STATE OF ARIZONA
)
)
SS ~
COUNTY OF MARICOPA)
I, Edwin E.
Van Brunt, Jr.,
represent that I am Vice President, Nuclear Production of Arizona Public Service
- Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its
- contents, and that to the best of my knowledge and belief, the statements made therein are true.
cGULA Edwin E. Van Brunt, Jr.
Sworn to before me th1s~gdey of
, 1984.
Notary Pub ic My Comm5.ssion Expires:
Qy ComrpJss1on Expires April 6, 1987
0 r
, t
~'4
+
'l 1
"',o', ~
0 Q~
l l
Attachment 1
Remote Shutdown Panel Review
0 t