Category:CORRESPONDENCE-LETTERS
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML20206Q3111999-05-18018 May 1999 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML20205T7421999-04-21021 April 1999 Forwards Partially Withheld Insp Repts 50-528/99-05, 50-529/99-05 & 50-530/99-05 on 990322-26.Determined That Security Program Properly Implemented.Insp Repts Details Withheld (Ref 10CFR73.21) ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17313B0991999-10-14014 October 1999 Forwards LER 99-005-00 Reporting Findings & Corrective Actions Taken as Result of Out of Tolerance MSSV Condition in Unit 1 Which Was Discovered During pre-outage Testing ML17313B0881999-10-12012 October 1999 Forwards Response to NRC 990831 RAI Re Several Relief Requests That Accompanied Second ten-yr Interval ISI Program Submitted on 980317.Revised Relief Request 6 Is Provided in Encl 2 ML17300B3501999-09-29029 September 1999 Forwards Revised Bases Pages,Providing Addl Discussion of Options Available to Exit Required Action G of TS 3.8.1 & Revised Page for TS 3.3.7,in Response to NRC RAI Re Proposed Amend to TS 3.8.1 & 3.3.7 ML17300B3551999-09-28028 September 1999 Responds to Aministrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. Proposed Palo Verde Operator Licensing Exam Schedule & Estimated Number of Applicants Planning to Take Exams Encl ML17313B0851999-09-24024 September 1999 Requests Approval of Alternative to Repair Requirements of 10CFR50.55a,authorizing Alternative Use of Mechanical Nozzle Seal Assemblies,As Described in Encl,For RCS Hot Leg Instrumentation & Sampling Nozzles for Two Operating Cycles ML17313B0781999-09-20020 September 1999 Forwards Rev 22 to PVNGS Emergency Plan. Summary Description of Changes,Included ML17300B3331999-09-14014 September 1999 Forwards MOR for August 1999 & Revised MOR for Jul 1999 for Pvngs,Units 1,2 & 3 ML17300B3351999-09-0808 September 1999 Informs That Repairs to Plant EDG 2A Jacket Water Cooling sub-sys Were Completed & EDG Was Declared Operable on 990903 at Approx 21:45 Mst.Noed Was Not Necessary,Since 72 Hour Completion Time Was Met ML17313B0761999-09-0303 September 1999 Requests Enforcement Discretion to TS Section 3.8.1, AC Sources - Operating. Enforcement Discretion Would Allow,On One Time Basis,Extension of Completion Time in Required Action B.4 of TS 3.8.2 from 72 H to 108 H ML17313B0731999-08-31031 August 1999 Informs That RR Bean (License OP-50452-1) Has Been Permanently Reassigned to Position That Does Not Require License & Requests That Individuals License Be Expired Per 10CFR55.55 ML17313B0581999-08-0606 August 1999 Forwards Rev 1 of Changes to TS Bases Implemented Between Aug 1998 & Jul 1999.Insertion Instructions & List of Affected Pages Included ML17313B0311999-08-0303 August 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001 ML17313B0441999-07-30030 July 1999 Forwards Comments on Draft NRC Repts Evaluation of AOVs at Us Light-Water Reactors (1999) & Idaho Natl Engineering & Environ Lab Rept (INEEL)EXT-98-00383,Study of AOVs in Npps. ML17313B0431999-07-30030 July 1999 Advises of Listed Senior Mgt Changes That Have Taken Place at Plant ML17313B0151999-07-20020 July 1999 Submits Request to Obtain All Data Previously Sent by PVNGS & Currently in REIRS for OLs NPF-41,NPF-51 & NPF-74.Data Is Requested in Electronic Form (Ascii Format) as It Currently Exists in REIRS Sys ML17313B0091999-07-20020 July 1999 Forwards Requested Calculations Performed to Verify That Increase in Max Radially Averaged Enrichment for Fuel Assemblies from 4.3 Weight Percent to 4.8 Weight Percent Did Not Affect Requirements for TSs 3.7.15,3.7.17 & 4.3.1 ML17313B0171999-07-16016 July 1999 Forwards LER 99-005-00,re Automatic Rt Which Occurred on 990618,following Sensor Failure in Core Protection Calculators.Corrective Actions Described in LER Are Not Necessary to Maintain Compliance with Regulations ML17300B3111999-07-15015 July 1999 Forwards PVNGS Unit 2 ISI Rept for Eighth Refueling Outage. No Commitments Made to NRC by Ltr ML17300B3141999-07-15015 July 1999 Forwards Corrected Electronic Files for Individual Monitoring Repts for 1998.Original Electronic Files Were Found to Have Two Administrative Errors,Which Has Been Corrected.Encl Withheld,Per 10CFR2.790 ML20209G6771999-07-0808 July 1999 Forwards Supplemental Info to Confirm That Decommissioning Funding Plans of Public Service Co of Nm for Interests in PVNGS Have Been Reviewed by Nm Public Regulation Commission. Final Order & Recommended Decisions in Case 2742,also Encl ML17300B2931999-07-0202 July 1999 Submits Withdrawal of Relief 5 for Second ISI Interval for Units 1,2 & 3.Proposed Alternative Is Related to Exam Requirements for Component Supports for Second ISI Interval ML17313A9951999-06-26026 June 1999 Provides Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. ML17300B2831999-06-26026 June 1999 Requests NRC Approval of Proposed Alternative IAW Provisions of 10CFR50.55a(a)(3)(i) to 10CFR50.55a(g) & Requirements of ASME Boiler & Pressure Vessel Code Section XI for Repairs & Installation.Description of Proposed Alternative,Encl ML17313A9901999-06-15015 June 1999 Forwards Response to RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. No Commitments Being Made to NRC by Ltr ML17313A9521999-05-24024 May 1999 Notifies NRC That Ja Proctor,License SOP-50314,has Been Permanently Reassigned to Position That Does Not Require License.License Should Be Expired,Per 10CFR55.55 ML17313A9311999-05-13013 May 1999 Notifies NRC That Rev 2 to COLR for Unit 2 Remains Applicable Following Recently Completed Unit 2 Reload ML17313A9481999-05-12012 May 1999 Informs of Change Needed in Order to Update Current Mailing List.Future Mailings for J Horne Should Be Forwarded to Listed Address ML17313A9261999-05-0707 May 1999 Forwards LER 99-004-00,per 10CFR50.73.LER Repts Findings & Corrective Actions Taken as Result of Unit 2 Out of Tolerance Pressurizer Safety Valve (Psv) Condition Which Was Discovered During Outage Testing ML20206H1931999-05-0303 May 1999 Forwards 1998 Annual Rept, for SONGS Units 2 & 3 & PVNGS Units 1,2 & 3.SCEs Form 10K Annual Rept to Securites & Exchange Commission for Fiscal Yr Ending 981231,encl ML17313A9191999-04-30030 April 1999 Forwards Special Rept 2-SR-99-001 Re SG Tube Plugging in PVNGS Unit 2,per TS Reporting Requirement 5.6.8.Complete Results of SG Tube Inservice Insp Will Be Submitted by 000422 ML17313A9181999-04-30030 April 1999 Forwards Electronic File of Individual Monitoring Repts for 1998.Encl Withheld Per 10CFR2.790 ML17313A9091999-04-30030 April 1999 Forwards Proprietary Proposed Test Outlines for Initial License Exams to Be Administered at PVNGS in Aug/Sept 1999. No Commitments Are Contained in Ltr.Proprietary Info Withheld ML17313A9081999-04-23023 April 1999 Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531 ML17300B3751999-04-23023 April 1999 Forwards LER 99-003-00,reporting Condition Prohibited by TS 3.7.17 Where Spent Fuel Assembly Was Stored in Inappropriate Region in Spent Fuel Pool ML17313B0271999-04-21021 April 1999 Forwards Proprietary Epec Pro Forma Cashflow Statement for 1999.Proprietary Info Withheld,Per 10CFR2.790.Affidavit Encl ML17313A9031999-04-21021 April 1999 Forwards Rev to Relief Request 12 Submitted 990420 to Second 10-yr ISI Interval.Revised Relief Request Discusses in More Detail Actions APS Will Take When There Is Identified Leakage from Bolted Connection ML17313A8971999-04-20020 April 1999 Requests Use of Alternatives to 10CFR50.55a(g) Inservice Insp Requirements.Proposed Alternatives Are Related to Visual Exam of Bolted Connections 05000529/LER-1999-002, Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing1999-04-19019 April 1999 Forwards LER 99-002-00 Re Findings & Corrective Actions Taken as Result of Plant Out of Tolerance MSSV Condition Which Was Discovered During pre-outage Testing ML17313A8931999-04-14014 April 1999 Forwards LER 99-003,reporting Condition Prohibited by TSs That Existed When Surveillance Requirement to Verify Essential Chilled Water Sys Valve Positions Was Not Met ML20205Q0821999-04-13013 April 1999 Forwards Second ISI Interval Relief Request 10 from ASME Section XI & Applicable Addenda Re Visual Exams Performed Subsequent to Repair or Replacement of Component or Alteration of Item ML17313A8901999-04-13013 April 1999 Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing ML17313A8831999-04-0808 April 1999 Forwards 1998 Annual Radioactive Effluent Release Rept for Pvngs,Units 1,2 & 3 & Rev 13 to ODCM, for Pvngs,Units 1,2 & 3 IAW TS 5.6.3 ML20205F3491999-03-30030 March 1999 Forwards Proprietary & non-proprietary Info Re Status of Decommissioning Funding for Pvngs,Units 1,2 & 3,per 10CFR50.75(f)(1).Proprietary Info Withheld,Per Requirements of 10CFR2.790(b)(1) ML17313A8671999-03-24024 March 1999 Submits Info Re Present Levels & Sources of Property Insurance Maintained for Pvngs,Per 10CFR50.54(w)(3) ML17313A8601999-03-16016 March 1999 Forwards Revised Relief Requests PRR-05,PRR-06 & PRR-11 to Clarify That Proposed Design Flow Testing for Lpsi,Hpsi & Containment Spray Pumps Will Be Performed Using Instruments That Comply with Code Requirements,Per 990226 Telcon ML17313A8551999-03-0505 March 1999 Requests Proposed Code Alternative IAW 10CFR50.55a(e)(3),as Acceptable Alternative to Requirements of 10CFR50.55a(e)(1), for Installation of in-line safety-related Flow Measurement Instrument in ASME Class 3 Pipe ML17313A8241999-02-23023 February 1999 Advises That Kp Jarvis,License OP-50287-1,no Longer Needs to Maintain License as Permanently Assigned to Position Requiring No License ML17313A8111999-02-18018 February 1999 Forwards PVNGS Unit 3 7th Refueling Outage, Which Provides Complete Results of SG Tube Inservice Insp Performed,Per TS 5.6.8 ML17313A8721999-02-16016 February 1999 Discusses Resolution of Generic Safety Issue 171, ESF Failures from Loss-of-Offsite Power Subsequent to Loca. Util Has Low Vulnerability to Loca/Grid Collapse/Loop Scenario ML17313A7611999-01-22022 January 1999 Forwards PVNGS Unit 3 Inservice Insp Rept Seventh Refueling Outage, Per 10CFR50.55a.Ltr Contains No New Commitments 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARML17305B0681990-09-17017 September 1990 Forwards Response to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule. Exam Dates,Anticipated Number of Candidates & Requalification Exam Schedules for FY91-FY94 Also Encl ML17305B0491990-09-12012 September 1990 Forwards Palo Verde Nuclear Generating Station Unit 2 Steam Generator Eddy Current Exam,Second Refueling Outage Apr 1990. ML17305B0281990-08-27027 August 1990 Forwards fitness-for-duty Semiannual Performance Rept for Period of Jan-June 1990,per 10CFR26.71(d) ML17305B0111990-08-15015 August 1990 Responds to Request for Addl Info Re Emergency Lighting,Per Insp Repts 50-528/90-25,50-529/90-25 & 50-530/90-25. Availability Info Provided in Ref 2,most Appropriate Analysis of Lighting Sys Availability ML17305B0021990-08-0909 August 1990 Provides Update on Status of Record 546 post-restart Item, Per 900412 Ltr.Record Will Revise Procedures for Analyzing & Disseminating Incident Investigation,Operations & Maint Experience to Appropriate Dept ML17305A9871990-08-0303 August 1990 Forwards Rev 1 to Abb Impell Rept 01-1658-1815, Emergency Lighting Independent Review, Per Insp Repts 50-528/90-25, 50-529/90-25 & 50-530/90-25 ML17305A9791990-07-31031 July 1990 Forwards, Conceptual Design for Palo Verde Nuclear Generating Station for Diverse Auxiliary Feedwater Actuation Sys (Dafas) for Review.Schedule of Implementation as Indicated ML20056A4161990-07-31031 July 1990 Forwards Revised Security Plan Implementing Procedures.Encl Withheld (Ref 10CFR2.790) ML17305A9831990-07-27027 July 1990 Requests Temporary Waiver of Compliance from Limiting Condition for Operation 3.6.3 to Allow Corrective Maint to Be Performed on Main Feedwater Isolation Valves by Extending Allowed Outage Time to 12 H Instead of 4 H ML20055J2671990-07-25025 July 1990 Forwards Info Constituting Decommissioning Financial Assurance Certification Rept,Per 10CFR50.33(k)(2) & 50.75(b) ML17305A9771990-07-25025 July 1990 Forwards Status of Corrective Actions to Min Multiple Control Element Assembly Drop Events at Plant.Insp of Insulation Coils & Replacement of Defective Coils for Units 1 & 2 Completed ML20055J1711990-07-25025 July 1990 Forwards Certification of Decommissioning Financial Assurances for Plant,Per 10CFR50.75(b) & 50.33(k)(2) ML20055J1031990-07-25025 July 1990 Forwards Certification of Decommissioning Financial Assurances ML17305A9411990-07-20020 July 1990 Forwards Response to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount. ML17305A9431990-07-17017 July 1990 Forwards Rev 1 to Palo Verde Nuclear Generating Station Annual Radiological Environ Operating Rept for 1987. Rev Results from Internal Review Bu Nuclear Safety Group & Audit Performed by Radiation Protection Stds ML17305A9601990-07-13013 July 1990 Forwards Preliminary Response Re Justification for Continued Operation of Fire Protection Sys Equipment,Per Insp Repts 50-528/90-25,50-529/90-25 & 50-530/90-25 ML17305A9331990-07-12012 July 1990 Discusses Util Compliance w/fitness-for-duty Program Implementation.Lab Specialists,Inc Audited & Monitored W/ Satisfactory Results.Ltr of Agreement Has Been in Place Since 900202 ML17305A9391990-07-0909 July 1990 Forwards Endorsement 44 to Maelu Policy MF-116 & Endorsement 62 to Nelia Policy NF-266 ML17305A9341990-07-0909 July 1990 Submits Results of 900514-18 NUREG-1220 Audit,Per NRC 900608 Request,Per Insp of Plant.Remaining Licensed Operators Found to Be in Conformance W/Medical Exam Requirements of 10CFR50.55 ML17305A9151990-06-29029 June 1990 Forwards Emergency Lighting Failure Data Update,Per 900621 Request ML17305A9061990-06-26026 June 1990 Suppls 891114 Response to Violations Noted in Insp Rept 50-528/89-16.Application for Amend to License NPF-41 Will Be Submitted in Oct 1990 to Permit Lower Flow Rate for RCS & Shutdown Cooling Sys ML17305A9111990-06-25025 June 1990 Responds to Generic Ltr 90-04, Status of Implementation of Generic Safety Issues. ML17305A9081990-06-25025 June 1990 Forwards Schedule Reiterating Util Plans for Implementation of USIs A-9 & A-44 & Provides Current Forecast Refuel Dates ML17305A9051990-06-25025 June 1990 Forwards Endorsement 45 to Maelu Policy MF-116 & Endorsement 63 to Nelia Policy NF-266 ML17305A9121990-06-24024 June 1990 Forwards Discharge Test Voltage Curve,Per 900623 Request for Completion of Emergency Lighting Exide Power Supply Prior to Entry Into Mode 2 ML17305A9171990-06-24024 June 1990 Confirms Compliance W/Agreed Upon Course of Action for Restart of Facility as Outlined in 891224 Ltr & Completion of Items Contained in Restart List Provided as Attachment to 900111 Ltr ML17305A8961990-06-20020 June 1990 Responds to NRC 900521 Ltr Re Violations Noted in Insp Repts 50-528/90-12,50-529/90-12 & 50-530/90-12.Corrective Action: Wiring in PPS Cabinets & Cabinet Drawers Reworked in Accordance W/Approved Work Authorization Documents IR 05000528/19900021990-06-19019 June 1990 Describes Current Status & Provides Description of Actions Taken to Ensure Continued High Reliability of Emergency Lighting Sys,Per Insp Repts 50-528/90-02,50-529/90-02 & 50-530/90-02.Emergency Lights Mfg by Emergi-Lite ML17305A9041990-06-19019 June 1990 Describes Current Status & Provides Description of Actions Taken to Ensure Continued High Reliability of Emergency Lighting Sys,Per Insp Repts 50-528/90-02,50-529/90-02 & 50-530/90-02.Emergency Lights Mfg by Emergi-Lite ML17305A8891990-06-15015 June 1990 Informs NRC That post-restart Items Due Prior to Scheduled Restart Have Been Completed on Schedule W/Listed Exceptions ML17305A8871990-06-14014 June 1990 Advises That Fuel Pool Cooling & Cleanup Procedures Being Restructured,Per Response to Violations in Insp Repts 50-528/89-36 & 50-530/89-36 ML17305A8731990-06-0808 June 1990 Responds to Bulletin 88-005 Re Product Forms Other than Fittings & Flanges for Plant.Significant Number of Lugs Delivered to Plant.Util Should Be Notified,If NRC Previous Review of Records Has Identified Other Product Forms ML17305A9421990-06-0101 June 1990 Forwards Pinnacle West Response to State of Az Corp Commission Complaint Filed W/Us Securities & Exchange Commission on 900521,to Revoke Exemption from Public Utils Holding Co Act ML17305A8661990-05-31031 May 1990 Forwards Projected 1990 Cash Flow Statements ML17305A8391990-05-31031 May 1990 Forwards 1990 Reactor Containment Bldg Integrated Leak Rate Test,Final Rept. ML17305A8571990-05-31031 May 1990 Forwards Amended Pages of Feb,Mar & Apr 1990 Monthly Operating Repts for Palo Verde Nuclear Generating Station Unit 2 ML17305A8201990-05-23023 May 1990 Provides Status of Improvements to Eliminate Possibility of Multiple Control Element Assembly Drop Events.Licensee Developed Mod to Ground Fault Detection Sys to Assure Continuous Monitoring & Annunciation of Any Future Faults ML20043B6421990-05-19019 May 1990 Forwards Amend 26 to Security Plan.Amend Withheld (Ref 10CFR2.790(d) & 10CFR73.21) ML17305A7841990-05-15015 May 1990 Forwards Special Rept 2-SR-90-002 Re Steam Generator Tube Plugging Due to Inservice Insp Activities.Twenty Tubes Plugged in Steam Generator 1 & ninety-one Tubes Plugged in Steam Generator 2 ML17305A8721990-05-14014 May 1990 Forwards Arizona Corp Commission Complaint Filed W/Us Securities & Exchange Commission Seeking Revocation or Mod of Exemption of Pinnacle West Capital Corp.Complaint Wholly W/O Merit ML17305A7621990-05-11011 May 1990 Responds to NRC 900413 Ltr Re Violations Noted in Insp Repts 50-528/90-03,50-529/90-03 & 50-530/90-03.Corrective Actions: Night Order Written for Guidance on Use of Instrumentation W/Maint Tag Present ML17305A7921990-05-0808 May 1990 Forwards Public Version of Rev 2 to EPIP-14, Dose Assessment. W/900523 Release Memo ML20043A0511990-05-0303 May 1990 Forwards Public Version of Revised Epips,Including Procedure Change Notice 11 to Rev 12 to EPIP-04 & Procedure Change Notice 1 to Rev 6 to EPIP-15 ML17305A7421990-05-0303 May 1990 Responds to 900330 Enforcement Conference Re Violations Noted in Insp Repts 50-528/90-04,50-529/90-13 & 50-530/90-13.Corrective Action:Special Locking Mechanisms Installed on Currently Posted Radiation Area Doors & Gates ML17305A8861990-04-30030 April 1990 Forwards EPIP Update,Including Rev 7 to EPIP 02,Rev 12 to EPIP 03 & Rev 9 to EPIP 20.W/o Encl ML17305A7381990-04-30030 April 1990 Forwards Annual Environ Operating Rept for 1989 & Annual Rept for Salt Deposition Monitoring Program 1989. ML17305A7131990-04-20020 April 1990 Responds to NRC 900321 Ltr Re Violations Noted in Insp Rept 50-530/90-08.Corrective Action:Plant Guideline Providing Addl Guidance Re Prioritization of Work Promulgated ML17305A6891990-04-16016 April 1990 Forwards Rev to Cycle 3 Reload Analysis Rept,Submitted 891024.Rev Reflects Early end-of-cycle Unit Shutdown & Replacement of Eight New Fuel Assemblies ML17305A7011990-04-12012 April 1990 Forwards Rev 3 to Palo Verde Nuclear Generating Station Post-Restart Actions, Per JB Martin 891224 Ltr ML17305A7081990-04-0909 April 1990 Forwards post-exam Security Agreements for Dk Hendrick, D Ensign,M Alavi & Author.Agreement Certifies That Signatories Will Not Divulge Info Re 900320 Exams 1990-09-17
[Table view] |
Text
REGULATORY FORMATION DISTRIBUTION SYMM (AIDS)
ACCESSION NBR:841 0310278 DOC DATE: 84/10/29 NOTARIZED: YES DOCKET Unit li Arizona Publi
~
FACIL:STN 50"528 Palo Verde Nuclear Stationi 05000528 STN,50 529 Palo Verde Nuclear Statian~ Unit 2i Arizona Publi 05000529 STN 50 .530 Palo Verde Nuclear Station~ Unit 3i Arizona Publi 05000530 AUTH, NAME AUTHOR AFFILIATION VAN BRUNTiE',ED Arizona Public Service Co.
REC IP ~ RECIPIENT AFFILIATION NAME'NIGHTON g G ~ Licensing Branch 3
SUBJECT:
Forwards changes to preoperational test descriptions in FSAR 14B,Justifications for changes also encl, DISTRIBUTION CODEo B001D COPIES RECEIVED LTR J ENCL SIZE~
TITLE: Licensing Submittal: PSAR/FSAR Amdts L Related Cor respondence" NOTES:Standardized plant ~ O5OOO528 Standardized plant ~ 05000529 Standardized plant ~ 05000530 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL NRR/DL/ADL 1 0 NRR LB3~ BC 1 0 NRR LB3 LA 1 0 LICITRAiE 01 1 1 INTERNAL; ADM/LFMB 1
'0 ELD/HDS3 1 0 IE FILE 1 1 IE/DEPER/EPB 36 1 1 IE/DEPER/IRB 35 1 1 IE/DQA SIP/QAB21 1 1 NRR ROEpM ~ L 1 1 NRR/DE/AEAB 1 0 NRR/DE/CEB 11 1 1 NRR/DE/EHEB 1 1 NRR/DE/EQB 13 2 2 NRR/DE/GB 28 2 2 NRR/DE/MEB 18 1 1 NRR/DE/MTEB 17 1 1 NRR/DE/SAB 24 1 1 NRR/DE/SGEB 25 1 1 NRR/DHFS/HFEBOO 1 1 NRR/DHFS/LQB 32 1 1 NRR/DHFS/PSRB 1 1 NRR/DL/SSPB 1 0 NRR/DS I/AEB 26 1 1 NRR/DSI/ASB 1 1 NRR/DSI/CPB 10 NRR/DSI/CSB 09 1 1 NRR/DSI/ICSB 16 1
1 1
NRR/DS I/METB 22 1, 1-NRR/DSI/PSB RAB 12'RR/D 19 1 1 1 1 NRR/DSI/RSB 23 1 1 LE- 04 1 1 RGN5 3 /MI8 1 0 EXTERNAL: ACRS 41 6 6 BNL(AMDTS ONLY) 1 1-DMB/DSS (AMDTS) 1 1 FEMA REP DIV 39 1 1.
LPDR 03 1 NRC PDR 02 1 1 NSIC 05. 1 NTIS 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 53 ENCL 05
W
~ 4 ~
"II I W
f lt 1 W, 'W W
u e
1 tt tt X Wr W
It ll tl 'l W
t lt W
Arizona Public Service Company Director of Nuclear Reactor Regulation October 29, 2984 Attention: Mr. George Knighton, Chief ANPP-30984 TFQ/JYM Licensing Branch No. 3 Division of Licensing U. S. Nuclear Regulatory Commission Mashington, D. C. 20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 and 3 Docket Nos. STN-50-528/529/530 Changes to FSAR 14B Preoperational Test Descriptions File: 84-056-026 G.l.01.10
Dear Mr. Knighton:
Attached are changes to the preoperational test descriptions as described in FSAR 14B.
Also attached are justifications for these changes.
If you have any questions concerning this matter, please contact me.
Very truly yours, E. E. Van Brunt, Jr.
APS Vice President Nuclear Production ANPP Project Director EEVBJr/JYM/bg Attachment CC:
E. A. Licitra w/a A. C. Gehr w/a R. P. Zimmerman w/a 84i029 84i0310278 05000528 PDR ADOCK PDR
October 29, 1984 ANPP-30984 STATE OF ARIZONA )
) ss, COUNTY OF MARICOPA)
I, Edwin E. Van Brunt, Jr., represent that I am Vice President, Nuclear Production of Arizona Public Service Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its contents, and that to the best of my knowledge and belief, the statements made therein are true.
Edwin E. Van Brunt, Jr.
Sworn to- before me this~4FQ day of , 1984.
N Notary Public My.Commission Expires:
>~) Mp My, Copunlsslon Expires April 6, 1S67
0
'1
>>V
- I@>>
It h
I
~>
V ~
> > ~ ,
Justification for Test Description Changes 148.4 125V DC Power S stem Pg '148-7 Section 3.3 The 125V DC Power system does not have bus transfer devices. Transfer of power supplies is made by manually changing circuit breaker positions.
148.13 Auxiliar Feedwater S stem Pg 148-22 Footnote a The change clarifies that the pump on demand starting time verification will be done a minimum of 5 times.
Footnote b The change clarifies that the cold start applies to the turbine-driven auxiliary feedwater pump only.
148.38 Fire Protection S stem Pg 148-54 Section 3.5-The portable fire extinguishers are being inspected for location and proper charge on a routine schedule through an inspection procedure.
148.44 Containment HVAC-Tendon Caller R Penetration Pg 148-61 Section 4.4-Clarification that handswitches are at the local control panel.
148.46 Radwaste Bld HVAC Pg 148-64 Section 1.2-The revised wording standardizes the wording throughout the test descriptions. For specifics see "test method" Section 3.6.
Section 1.5-a.) The air washer pumps are not designed with .a "dust mode" of operation. b.) The revised wording will ensure that applicable testing of the air washers and oil impingement filters is performed regardless of "operational modes". c.) Spray nozzles do not have a mode of operation, however, flow through the nozzles is demonstrated as part of the setup and operation of the air washer pumps.
Section 1.8- The Radwaste HVAC System does not use pressure controllers.
Section2.3-Flow balancing is covered under another startup test procedure and is therefore deleted.
Section 3.2-The radwaste building HVAC system does not utilize pressure signals to control unit dampers.
Section 3.3-The change clarifies that automatic and manual system controls will be demonstrated.
Section 3.6-The existing statement "Record all data on test sheets" is not necessary, the test program addresses this item.
The new statement is necessary because the Radwaste Building Ventilation System contains filter units that require testing.
- 6. 14B.47 Turbine Bld .HVAC pg 14B-68 Section 3.2-(a)The Turbine Building HVAC system does not utilize pressure signals to control unit dampers. (b) The present list of equipment is incomplete (c) The designator HN is a typographical error and should be HT.
Section 3.4-The change clarifies that automatic and manual system controls will be demonstrated.
Section 3.7-a.) The air washer pumps are not designed with a "dust mode" of operation. b.) The revised wording will ensure that applicable testing of the air washers and oil impingement filters is performed regardless of "operational modes".
c.) Spray nozzles do not have a mode of operation, however, flow through the nozzles is demonstrated as part of the setup and operation of the air washer pumps.
Section 3.8-The statement "Record all data on test sheets" is not necessary, the test program addresses the item.
- 7. 14B.49 Li uid Radwaste S stem Pg 14B-71 Section 3.1-The change clarifies that the modified 3.1 and the existing 3.2 will verify flow rates of all critical flow paths.
c' vli+ <0>
PVNGS FSAR To w9ia PRC~ E APPENDIX 14B 14B.4 125V DC POWER SYSTEM 1.0 OBJECTIVE To demonstrate, by v'ification of the system design and by component performance testing, that the 125V DC Power System provides a reliable source of power for startup, operation, and shutdown under normal and emergency conditions, and to verify that the four separate power sources and their respective loads are independent of each other.
2.1 Construction activities completed on components to be tested.
2.2 Meters and relays calibrated.
2.3 Batteries fully charged with normal height of electroyte.
2.4 Load resistor bank available for battery capacity test.
2.5 Construction activities completed on safety related equipment supplied by the battery system for the integrated system test.
2.6 Battery room ventilation available.
2.7 Appropriate ac and dc power sources available.
3.0 TEST METHOD 3.1 Inspection to verify that construction and compo-nent installation is in accordance with the sys-tem design.
2f -Amendment 2 14B-6 September 1980
I
/t ~
,I i
,I I O 1
i
PVNGS CESAR APPENDIX 14B 3.2 Battery capacity and charger performance will be verified in both float and equalize mode.
Bat evzw h
3.4 Alarms and tripping devices will be tested.
3.5 The ground detector will be checked.
3.6 The load capacity of the battery will be measured by discharging the battery through a variable resistive load programmed to match the emergency discharge requirements of the battery. (Battery charger disconnected.)
3.7 Individual cell voltage will be monitored during the design discharge test.
3.8 Verify that DC loads required for safe shutdown, not verified by vendor tests and system analysis, will function properly, as installed, at a bat~cry terminal voltage equal to the minimum acceptable battery terminal voltage.
4.0 ACCEPTANCE CRITERIA 4.1 The 125V DC Power System will perform the functions described in applicable portions of Section 8.3.2 when using the above test methods.
4.2 DC supplied loads required for safe shutdown, not verified by vendor tests and system analysis will function, as installed and required, at a battery terminal voltage equal to the acceptance criteria established for minimum battery terminal voltage.
August 1984 14B-7 Amendment 13
PVNGS FSAR APPENDIX 14B 14B.13 AUXILiARY FEEDWATER SYSTEM.
1.0 OBJECTIVE To demonstrate'he ability of the Auxiliary Feedwater System to:
1.1 Supply sufficient auxiliary feedwater to the Steam Generators for reactor startup, normal reactor cooldown and design emergency conditions.
1.2 Respond correctly to automatic and manual system controls.
2.1 Construction activities completed.
2.2 Component testing and instrument calibration completed.
2.3 Support systems available.
2.4 Test instrumentation available and calibrated.
3.0 TEST METHOD
- 3. 1 Demonstrate automatic and manual system controls.
3.2 Verify system flow rates and pressures, including operation of the turbine-driven auxiliary feed-water pump over its design range of inlet steam conditions.
3.3 Verify and record pump on demand starting times and valve opening and closing times.
1 3.4 Verify and record alarms, indicating instruments and status lights are functional.
,,y Wrang ~ne. v~A'e &on
- a. ill be done a minimum of 5 times. Each time must be successful and from a cold, quick start condition.
- b. This a ppli ec. h Ae. &rhine- cli veii crux'ih 5e~
Amendment v..~Mr o..~p' onl+.
14B-22 any 6 ~
October 1981
PVNGS FSAR C g~C~~.S 7o TH-i 4 PA(~F APPENDIX 14
4.0 ACCEPTANCE CRITERIA The Auxiliary Feedwater System operates as described in Section 10.4.9 and manufacturer's design speci-fications when using the above test methods.
October 1981 140-23 Amendment 6
I i
(
[
,I
j% G t Hth~'6 Ij PVNGS FSAR APPENDIX 14B 14B.38 FIRE PROTECTION SYSTEM 1.0 OBJECTIVE To demonstrate the proper operation of the 'Fire Protec-tion System in the detection of fires and the capa-bilities to contain and extinguish fires.
2.1 Construction activities completed.
- 2. 2 Component testing and instrument calibration completed.
2.3 Test equipment and instrumentation available and properly calibrated.
2.4 Support systems available.
3.0 TEST METHOD 3.1 Demonstrate the proper operation of the Fire Detection System.
3.2 Demonstrate the proper operation of the Fire Wate System.
- a. .Demonstrate the head and flow characteristics of the diesel engine driven fire water pumps, the electric motor driven fire water pump, and the operation of all auxiliaries.
- b. Verify control logic.
- c. Verify flow rates in the various flow paths of the Fire Water System.
3.3 Demonstrate the proper operation of the CO2 Fire Protection System.
September 1980 14B-53 Amendment 2
PVNGS FSAR APPENDIX 14B 3.4 Demonstrate the proper operation of the Halon Fire Protection System.
a'L.S >ED 3.5 p 4~ L 3.6 Uerify alarms, indicating instruments and status lights are functional.
4.0 "ACCEPTANCE CRITERIA The Fire Protection System operates as described in Subsection 9.5.1 when using the above test methods.
Amendment 2 14B-54 September 1980
PVNGS FSAR APPENDIX 14B 14B 44 CONTAINMENT HVAC TENDON GALLERY 6c PENETRATION COOLING SYSTEMS 1.0 TEST OBJECTIVES
1.1 Objectives
.1.1.1 Demonstrate the manual operation of the tendon gallery normal supply fan.
1.1.2 Demonstrate the manual operation of the tendon gallery normal exhaust fan.
1.1.3 Demonstrate the operation of the penetration cooling normal exhaust fans.
1.1.4 Demonstrate the manual and automatic operation of the penetration cooling supply fans and their exhaust dampers.
2.0 PREREOUISITES 2.1 Construction activities completed.
2.2 Component testing and instrument calibration completed; 2.3 Support systems available.
2.4 Test instrumentation available and calibrated.
3.0 TEST METHOD 3.1 Demonstrate automatic and manual system
'controls.
3.2 Verify and record delay times when fans start on automatic.
3.3 Verify and record alarms, indicating instruments and status lights are functional Amendment 6 14B-60 October 1981
~ ~
PVNGS FSAR APPEND IX 143 4.0 ACCEPTANCE CRITERIA 4.1 The tendon gallery normal supply fan will start and stop by actuation of handswitch in room.
the'ontrol 4e2 The tendon gallery normal exhaust fan will start and stop by actuation of handswitch in the control room.
4e3 Penetration cooling exhaust fans will start and stop by actuation of handswitches at the local panel.
4.4 Penetration cooling supply fans will start and stop by actuation of handswitchespa0 +he.
(c co.( c.~+~l Paced ~
4e5 Penetration cooling supply fans start automati-cally after a 60-second time delay upon receipt o fa low dp signal.
4.6 Penetration cooling .supply dampers open and shut as their respective fans start and stop.
4e7 Heat removal capability will be verified for the Tendon Gallery System.
4.8 Heat removal capability will be verified for the Penetration Cooling System.
October 1981 14B-61 Amendment 6
il
'I l
I l
t
PVNGS FSAR APPENDIX 14B 14B.46 RADWASTE BLDG HVAC 1.0 OBJECTIVE 1.1 To demonstrate design air quantities and a controlled airflow pattern from areas of low potential radioactivity to areas of increasingly higher radioactivity to prevent the spread of airborne radioactivity during normal operation of Bldg HVAC Supply Systems (HRN-A01 A & B),
Exhaust Systems (HRN-J01 A & B) and Radwaste
'Bldg Control Room Normal Air Handler (HRN-A02).
1.2 To demonstrate the~
H-t~~e per~S~
fe r~aa&ag tt~he-pl ank~xhaus t~
1.3 To demonstrate a negative building pressure of 0.25" W.C. to prevent exfiltration of condi-tioned space air to the atmosphere.
1.4 To demonstrate the Radwaste Bldg Control Room Air Handler recirculates conditioned airflow at prescribed temperatures using chill water or electric heating. <he pc opec 1.5 To demonstrate operation of A~~ i+
oil impingement filters+ and'ir washer pump' (HPN-P01 A & B).
1.6 To demonstrate appropriate operation and position of automatic dampers (HRN-M01 to M06).
1.7 To demonstr" he appropriate operation, indication g)'%kern and temperature rise of electric duct heaters (HRN-E01 A & B).
Ci 1'IT'nH en mg ~neck Air. pn< V( cu/cd% 4 HEi R g lRri 464~e pneeinq '4 Amendment 6 t4~ pl~a e.~~~-~+
14B-64
~+<< October 1981
(
I i
(
PVNGS r SAR APPENDIX 142 1.8 To demonstrate annunciation and indication of all alarms and,design operation of temperature controls.
- 2. 1 Construction, inspection, testing, completion and release of Radwaste HVAC Systems according to specification.
2.2 HR-01 and HR-02 Phase 1 testing complete.
~E LE~K5 'IA 2.4 Release of supporting and interfacing construc-tion systems required to implement start-up test activities to include:
2.4.1 DS-05 Domestic Water and WCOl Chill Water.
2.4.2 E-NHN-M14 & M27 480 Volt MCC.
2.4.3 E-NGN-L05 & L16 480 Volt Load Center.
2.4.4 E-NKN-D42 & D-43 DC Distribution Panel.
2.4.5 RE01 Annunciator.
2.4.6 Appropriate valve lineup and breaker and control switch positions for BLDG HVAC r Systems'.1 3.0 TEST METHOD Actuate handswitches (HS-1, 2, 30, 31, 60) to verify design operation, indication and status of HVAC rotating units.
October 1983. 14B-65 Amendment 6
PVNGS FSAR APPENDIX 14B 302 g
Cy e temperature and pressure controllers to verify status modal operation of HVAC rotating units d dampers (HRN-MOl to M06).
'.3 Verify cor:trol logic un extreme pressure and temperature design tolerances btain pre-determined indications.
3.4 Verify alarm annunciation in response to selected alarm signals.
3.5 Verify design air 8 water flow paths, quantities and temperatures to distribution and metering devices.
3.6 ACCEPTANCE CRITERIA Appropriate installation and operation according to speci fications, submitt a 1s (vendor, manu facturer, engineering) and design drawings (instrument, electrical and mechanical) verified.
p g
%~~pe.-abide.
) ~~+ ~y yg Pi I+okc% QA<
Qs. Q,lSQU&Md tn. MQ+l~
Cqc(e c.Ac@'Le <~ 4 ve i'.Q (ro pc-opq;g.h~ ~g Qq p+ y9ciWg uriH rcmp<~~ (HRH hhOX h 1<~<).
De.ace<haL C v~O.V C cc~be (6.
Amendment 6 14B-66 October 1981
I PVNGS FSAR APPENDIX 14B TURBINE BLDG HVAC 1-0 OBJECTIVE 1.1 To demonstrate that the Turbine Bldg Normal Supply (HTN-A01 & A02, A, B, C) and General Exhaust Systems (HTN-J01A,', C, D; HTN-J01B, A, B; HTN-J04; HTN-J03 A & B and HTN-J02 A and B) provide the designed environment for personnel and equipment during normal operation and shutdown, and appropriate exhaust for battery rooms, lube oil area, demineralizer room and switchgear rooms.
- 2. 1 Construction, activities completed 2.2 IA08 Instrument and service air available 2.3 E-NGN-L08 & L15 Class IE 480 volt load center available 2.4 E-NHN-M02, M07, Mll, M12, M22, M23 Non-Class IE 480 volt MCC available 2.5 NK01 Non-Class IE 125 V-DC power distribution system available 2.6 RK01 annunciator available
- 2. 7 Valve lineup (initial) and breaker and control switch positions for Bldg HVAC Systems completed 3.0 TEST METHOD 3.1 Actuate hand switches (HS-1, 2, 3, 4, 5, 6, 85, 86, 87, 88, 89) to verify design operation, indication and status of HVAC Rotating Supply and Exhaust Systems.
'October l981 149-67 Amendment 6
C.
l
PVNGS FSAR APPENDIX 14B
- 3. 2 Cycle tempereture (rp-7, 6, 9, 10, 11, 12, 60,
,61, 62, 63, 64, 65, 67) rb to verify a-2 (
HT' operation of HVAC units and .Jumpers (MM01, h M02, M07, M09, M010,
) ~
HO% Mog No5 NC4>
+ol&, Ho.lQ~ hholS 3.3 Verify manual and automatic operation of duct heaters (HTN-E01, E02, E03, E04, E05, E06).
3.4 u
6Q pate& ccrc'tYG ls ~
3.5 Verify alarm annunciation in response to selected alarm signals.
3.6 Verify design air paths, guantities, and temperatures to distribution and metering devt.ces Y9I1IFY
~ pQ+~Q pf7 the.
of oil impingement filteree9'nd C).
3.8 4.0 ACCEPTANCE CRITERIA Appropriate installation and operation according to specifications, submittals (vendor, manufacturer and engineering) and design drawings (instrument, electrical and mechanical) verified.
Amendment 6 148-68 October 1981
PVNGS FSAR
) 88.~9 APPENDIX 14""
LI UID RADWASTE SYSTEM 1.0 OBJECTIVE 1'.1 To demonstrate that the system will:
1.1.1 Collect and process radioactive and potentially radioactive liquid waste.
1.1.2 Process liquid waste to a high degree of purity necessary for recycle into the plant.
1.1.3 Minimize the quantity of liquid waste transferred to the solid radwaste system.
2.1 Construction is completed and the system is turned over for operation in accordance with the approved procedures.
2.2 Required test instruments are calibrated and installed.
2.3 Required support systems are operable.
2.4 All generic and integrated tests are completed.
3.0 TEST METHOD
+ha WaW ~ J c~~.-:q o( sg'> ~ p-p'.
3.1 Verify 3.2 Verify ~P across heat exchangers, demineral-izers, and filters at rated flow.
3.3 Verify proper operation of automatic and manual system controls.
3.4 Verify logic, interlocks, alarms and status lights are per design.
October 1981 14B-71 Amendment 6
PVNGS F SAR ~D CH~~& <i Tc <H~ ~ PAC~
APPENDIX 14B 4.0 ACCEPTANCE CRITERIA The system operates as described in Section 11.2.2.3 of the FSAR when using the above test. methods.
Amendment 6 14B-72 October 1981
'I