Forwards Rev 5 to Emergency Action Levels.Rev Addresses Comments Raised at 840731 Meeting Re Security,External Events & Challenge/Failure of Fission Product Barriers
ML17298B193
Person / Time
Site: Palo Verde  
Issue date: 08/16/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Knighton G
Office of Nuclear Reactor Regulation
Shared Package
ML17298B194 List:
References
ANPP-30268-EEVB, NUDOCS 8408200217
Download: ML17298B193 (7)


Text

Pl

,REGULATORY INFORMATION DISTRIBUTION S STEM (RIDS)

DOCKET 05000528 05000529 05000530 ACCESSION NBR 8 l08200? 17 DOC ~ DATE ~ 84/08/16 NOTARIZED YES FACIL~STN-50-528'Palo Verde Nuclear Stations Unit li Arizona Publi STN 50-529 Palo Verde Nuclear Station~

Un) t 2i Arjzona Publ i STN 50 530 Palo Ver de Nuclear Stations Unit 3i Arizona Publ i AUTH~NAME, AUTHOR AFFILIATION VAN BRUNTiE ~ ED Arizona Pub'lic Service Co.

RECIP ~ NAME RECIPIENT AFFILIATION KNIGHTONjG~,

. 'icensing Branch '3

SUBJECT:

Forwards Rev 5 to emergency action

'levels;Rev addresses comments raised

=at 840731 meeting re secur ityiexternal, events hallenge/fail re of fissio product barriers'ISTRIBUTION CODE.

A045S COKIE RKCEf V D:LTR ENCL 3 SIZE';

2 m fa7/M TITLE! OR Submittal Emergency Prep Correspondence NOTES:Standardized plant+

'Standardized plant.

Standardized plant ~

05000528 05000529 05000530 RECIPIENT ID CODE/NAME NRR LB3 BC LICITRAgE 01 INTERNAL'DM LFMB IE/DEPER/IR8 12 NRR/DSI/RAB RGN5 COPIES LTTR ENCL 1

1 i

0 1

1 1

1 1

1 RECIPIENT ID CODE/NAME NRR LB3 LA IE/DEPER/EPB 06 B

04 RGN2/DRSS/EPRPB COPIES LTTR ENCL 1

0 2

2 1

1 1

1 1

1 EXTERNAL: FEMA TECH HAZ NRC PDR 0?

NTIS 05 1

1 1

1 1

LPDR NSIC 03 1

1 1

1

'TOTAL NUMBER OF COPIES REQUIRED',,

LTTR 17 ENCL 15

1

'1 t

~ ',

v g

I 7>>E 5<< ~ Ia f I>>>>

1 1

Qf

)i 1>>

~

I a>>

1)k" 1

f ar M

~ ~

I

)f," <5 5

a

~ >>l j

'I M

vE'>>

(E>>

M') f

<),>> n

~ a a)f)

I' Ik

+E M

)Ma Chf)a

~

" ~ ') 5 f>>'"I )>>

\\

1 v)>>>>I

~ a ')

)

'1 1>>

f )M, y ~M),)~,

f l')<<)" fe 4

~, l I I') a

!)vaa)MM a

.'I'>> )f 4t l')>>E l>>) "'<

~ 'v f r

1 04 4'>>I

>>)~>> I ca rfa fi, J

E (, l v) a> )I

~

a f f M l>>M f

I

>>M f tva>>, f )>>

15M ft 1>>,

.9>>

1 f

)

M M~r, af.<<(>>.)

~

~ l r>>ya f ')

I M>> f M ') faa r),, l

<<'f

>>,Tii I

f f 'I l) f l 1 f

f

'<<5 Ia ff.'1 I

I f

t

<<<<X>>Ol)X <> <<hfdf.M)X 1

l)*'>>

fan%

)

j )

<<IM a aa g(

MA

,'. )>>>> Ii'>>

a>>

Mp a

M fj~ )

a v

It

Arizona Public Service Company ANPP-30268-EEVBJr/GEC August 16, 1984 Director of Nuclear Reactor Regulation Attention:

Mr. George Knighton, Chief Licensing Branch No. 3 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3

Emergency Action Levels Docket Nos.

STN 50-528/529/530 File:

84-056-026 G.1.01.10

Reference:

.Letter from E. E.

Van Brunt, Jr.,

APS, to G.

W. Knighton, NRC, dated August 15, 1984 (ANPP-30209-SRF/GEC)

Subject:

Submittal of Emergency Plan Revision Emergency Action Levels.

Dear Mr. Knighton:

Arizona Public Service Company (APS) recently submitted Revision 4 to the PVNGS Emergency Plan (refer to the above referenced letter).

This submittal consisted of a revised Chapter 5 that updated our Emergency Action Levels.

A meeting was held in our offices on July 31, 1984, which included Mannie Licitra and Perry Robinson of the NRC staff as well as Dave Schultz, NRC, consultant, to discuss the Revision 4 submittal.

The attached submittal addresses comments ari.sing from that meeting.

With regard to the comment concerning security and external events, Chapter 5 of the PVNGS Emergency Plan defines fission product barriers and challenge/failure of these barriers.

Physical conditions such as fire and security are defined and addressed in the. second paragraph of Section 5.2, Page 6 of Table 5.1-1, and Page 4 of Table 5.3-1 i.e.,

based on the Shift Supervisor's (SS) discretion, the event is classified/

upgraded based on the magnitude of the event and the impact on a fission product barrier.

Moreover, specific guidance (including examples) is given in training as well as EPIP-02 (Appendix B and C) e.g.,

any declared security emergency will be classified as a Notification of Unusual Event.

Should any plant damage, loss of facility control, or loss of accessability result from a degraded security condition (or fire),

guidelines for upgrading the'emergency classification are in EPIP-02, Appendix B, Tables 3 and 5.

Should a security compromise further degrade such that a substantial reduction in the level of plant safety occurs, an Alert classification is appropriate.

The SS/Emergency Coordinator's judgement will be required to determine the severity of the security intrusion and the likelihood that a fission product barrier might be challenged to warrant the upgrade of the emergency classification.

8408200217 840816 IIIeW PDR ADOCK 05000528 PDR oI

l

(

0

Mr. George Knighto~

Emergency Action Le~s ANPP-30268 Page 2

If you have any questions, please contact Mr. Gary Clyde at (602) 943-7200, extension 6187.

Very truly ours CIA~ n~

E. E.

Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVBJr/GEC/mb Attachment cco E. A. Licitra (w/a)

A. C. Gehr (w/a)

P.

D. Robinson (w/a)

R.

Zimmerman (w/a)

r r

ANPP-30268-STATE OF ARIZONA

)

) st COUNTY OF MARICOPA)

I, Edwin E.

Van Brunt, Jr.,

represent that I am Vice President, Nuclear Production of -Arizona Public Service

Company, that the foregoing document has been signed by me on behalf of Arizona Public Service Company with full authority to do so, that I have read such document and know its
contents, and that to the best of my knowledge and belief, the statements made therein are true.

I Edwin E. Van Brunt, Jr.