Docket Nos.:
50-528, 50-529 and 50-530 MAY 3 5 1984 APPLICANT:
Arizona Public Service Company FACILITY:
Palo Verde, Units 1,.2 and 3
SUBJECT:
SUMMARY
OF MEETING TO DISCUSS GEOTECHNICAL INFORMATION FOR PALO VERDE A meeting was held on May 8, 1984 in Bethesda, Maryland with representatives of the applicant and Bechtel.
The purpose of the meeting was to discuss the staff's request for additional information, dated February 29, 1984, regarding the staff's evaluation of the effects a break in temporary water lines under Palo Verde structures.
The applicant's assessment of this occurrence was provided in a Final Report (DER 81-35) submitted along with the supporting documentation.
Enclosure 1 lists the meeting attendees and the meeting is summarized as follows:
~Summa r The staff informed the applicant that it is reviewing the applicant's Final Report on DER 81-35 in order to determine whether there are any safety considerations to concerns, expressed by a member of the public regarding the effects of the broken water'ines.
As a result of the review, the staff had requested additional information of the applicant (letter dated February 29, 1984).
- During the meeting, the applicant asked questions about the staff's request 'in order to better understand what information was needed to respond to the request.
Following these discussions, the applicant stated that it would be able to
'espond'y, June 15, 1984.
The staff'stated that it is in the process of obtaining technical assistance from the Corps of Engineering (COE) in order to complete its review of this matter.
It is" expected. that COE will assign a reviewer by mid June 1984.
After COE has had an oppor'tunity to review the applicant's Final Report and the responses to the staff request, another meeting with the applicant and COE may be necessary to 8406040373 840S2S PDR ADOCK OSOOOM8 A
N NN, I 4
t
,,4 Ih 41 I
4
- 81 4 N1">>
t 0
I
\\
N N
h I
f,h Pth r
I N
V
1 complete the review.
The staff stated that it would inform the applicant about the date for such a.meeting.
I
Enclosure:
1.
Meeting Attendees cc:
See next page E. A. Licitra, Project Manager Licensing Branch No.
3 Division of Licensing DL:LBg3 I D
EALicit a7yt Gl ton 5/RI//84 5/
/84
I tl I
~
I I,
~
)EAlt I
1 tn I
II t 4 art P
I n
't H,
i'
Palo Verde Mr. E.
E.
Van Brunt, Jr.
Vice President - Nuclear Projects Arizona Public Service Company P. 0.
Box 21666
- Phoenix, Arizona 85036 Arthur C. Gehr, Esq.
Snell 8 Wilmer 3100 Valley Center Phoenix, Arizona 85073 Mr. James M. Flenner, Chief Counsel Arizona Corporation Commission 1200 West Washington Phoenix, Arizona 85007 Charles R. Kocher, Esq. Assistant Counsel James A. Boeletto, Esq.
Southern California Edison Company P. 0. Box 800
- Rosemead, Ca 1 ifornia 91770 Ms. Margaret Walker Deputy Director of Energy Programs Economic Planning and Development Office 1700 West Washington Phoenix, Arizona 85007 Mr. Rand L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Resident Inspector Palo Verde/NPS U.S. Nuclear Regulatory Commission P. 0.
Box 21324 Phoenix, Arizona 85001 Ms. Patricia Lee Hourihan 6413 S. 26th Street
- Phoenix, Arizona 85040 Regional Administrator - Region V
U. S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Kenneth Berlin, Esq.
Winston 5 Strawn Suite 500 2550 M Street, NW Washington, DC 20037 Ms. Lynne Bernabei Government Accountability Project of the Institute for Policy Studies 1901 gue Street, NW Washington, DC 20009 Ms. Jill Morrison 522 E. Colgate Tempi, Arizona 85238
A p
. ~
Meeting Attendees Palo Verde DER 81-35 NRC Manny Licitra Lyman M. Heller APS Bill quinn Bechtel Steve Shepherd Michael Wolff Ken Schechter
0 0
1 II
MAY 2 5 1984 MEETING
SUMMARY
DISTRIBUTION et No(s):
50.-.528/529/530 Kf PDR Local PDR NSIC PRC System LB3 Reading
- Attorney, OELD GWKnighton Project Manager E
JLee NRC PARTICIPANTS Manny Licitra LYman W. Heller bcc:
Applicant
& Service List
e 'l K
F pl Ih