i no'NOLA mlAO Ob 9OO
",<O g) IA
~O lA lAM OU OO IAA MCC 0IAOK NA
'(9L,N llPR 9 9 'l994 DISTRIBUTION 50~0
.1-00-520/529/500 NRC PDR L PDR PRC System LB¹3 Reading JLee EALicitra
- Attorney, OELD NGrace EJordan
Dear Mr. Van Brunt:
ACRS (16)
Subject:
Request for Additional Information
-,, APS Organizational Structure Docket Nos.:
50-528, 50-529 and 50-530 Mr. E.
E.
Van Brunt, Jr.
Vice President - Nuclear Projects Arizona Public Service Company Post Office Box 21666 Phoenix, Arizona 85036 As a result of our continuing review of Chapters 13 and 14 of the Palo Verde FSAR through Amendment No. 12, the staff has identified the need for additional information relating to the Arizona Public Service Company organizational structure and qualification requirements for certain personnel.
The specific information required is identified in'the enclosure.
We ask that you provide responses to the enclosed request.
Within two weeks of receipt of this letter, we request that you advise us as to when the required information will be submitted.
If you have any questions regarding this letter, you should contact Manny Licitra, the Licensing Project Manager.
Sincerely, Aa<'7
Enclosure:
As stated George W. Knighton, Chief Licensing Branch No.
3 Division of Licensing cc:
See next page DL:LB¹3 DL'LB¹3 EALicitra/yt GWKnjghton 4//P/84 4/ (3/84
Pal o Verde Mr. E.
E.
Van Brunt, Jr.
Vice President - Nuclear Projects Arizona Public Service Company P. 0.
Box 21666 Phoenix, Arizona 85036 Arthur C. Gehr',
Esq.
Snell 5 Hilmer 3100 Valley Center Phoenix, Arizona 85073 Mr. James M. Flenner, Chief Counsel Arizona Corporation Commission 1200 West Washington Phoenix, Arizona 85007 Charles R. Kocher, Esq. Assistant Counsel James A. Boeletto, Esq.
Southern California Edison Company P. 0.
Box 800
- Rosemead, California 91770 Ms. Margaret Walker Deputy Director of Enerqy Programs Economic Planning and Development Office 1700 Hest Washington Phoenix, Arizona, 85007 Mr. Rand L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 Resident Inspector Palo Verde/NPS U.S. Nuclear Regulatory Commission P. 0. Box 21324 Phoenix, Arizona 85001 Ms. Patricia Lee Hourihan 6413 S. 26th Street Phoenix, Arizona 85040 Regional Administrator - Region V
U. S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, Gal iforni a 94596 Kenneth Berlin, Esq.
Winston 5 Strawn Suite 500 2550 M Street, NW Washington, DC 20037 Ms. Lynne Bernabei Government Accountability Project of the Institute for Policy Studies 1901 gue Street, NW Washington, DC 20009
Enclosure Request for Additional Information Palo Verde Nuclear Generating Station Docket.Nos. 50-528, 50-529 and 50-530 We note numerous apparent errors or. inconsistencies between job titles used in FSAR Section 13.1.2 and Figure 13.1-6.
We also note other areas where superseded titles remain, e.g.,
"Vice President of Nuclear Operations" in Sections 13.4', 14.2.2.3.1, and 13.1.1.2.2; and "Manager of Nuclear Operations" in sections 14.2.2.11, 14.2.2.12.1.B.3, 13.1.1.2.2, 13.1.3.1 and 17.2.1.1.3.
Please provide replacement FSAR pages which are appropriately "marked-up" to correct those errors and clarify the actual organizational structure and interrelationships.
/
- k
~MOM Vlh Section 13.1.2.2.3.
This section states the Operations Manager is responsible for operation and maintenance of plant systems.
In view of the latest change in organizational structure, the inclusion of a maintenance responsibility appears to be an error.
Please confirm this, or correct our understanding of the organization.
Please supply Statements of Qualifications/Resume's for the current incumbents of the following positions:
Executive Vice President - ANPP, Vice President - Nuclear, Assistant Vice President - Nuclear, Nuclear Engineering
- Manager, Startup Manager, Transition Manager, Nuclear Operations Licensing Supervisor, Director of Nuclear Operations,'echnical Support Manager, Operations
- Manager, Maintenance
- Manager, Administrative Support Manager, Security Manager, Training Manager, Fire Protection Manager, Unit Operations Superintendents, Compliance Supervisor, STA/ISEG Supervisor and NSG Supervisor.
Please supply Figures 14.2-1 and 14.2-2 (Startup Organization) which are referenced in the text but not provided in the FSAR.
Please supply the correct reference in paragraph 14.2.2.12.1.A.3.
The indicated paragraphs do not exist.
Please define the factors to be considered and acceptance criteria to be used in performiAg the case-by-case qualification of otherwise unqualified startup personnel as described in section 14.2.2.12.1.B.3.
Please supply information concerning the duties, responsibilities and qualifications of the Operations Support Superintendent shown in Figure 13.1-6 reporting to the Operations Manager.
Please provide the information requested in question 7 for the Day Shift.
Supervisor shown in Figure 13.1-6 reporting to the Unit 2 (sic)
'perations Superintendent(s).
Also, please clari'Ey whether the Day Shift Supervisor is a staff or line position.
~ ~
g (
9.
Please identify the organization staffed with qualified inspectors of safety-related maintenance, and show the relationship of this organization to those of the Director of Nuclear Operations, the PVNGS Opex'ations QA/QC Manager and the Corporate Quality Assurance Manager.
10.
11.
Please furnish copies of corporate safety policies 726B and 726C, revised to reflect the current organizational structure.
We interpret ANSI/ANS 3.1-1978, paragraph 4.2.1 to mean that principal alternates shall have the same training and experience required of the plant manager, including the "experience and equivalent training normally required to be eligible for a Senior Reactor Operator's license whether or not an examination is taken."
Please confirm your agreement with this interpretation as applied to FSAR paragraph 13.1.3.1 and the note "principal alternate" following the position titles Operations Manager and Technical Support Manager.
12.
-13.
Please confirm the Unit Operations Superintendents will meet the qualifications of ANSI/ANS 3.1-1978, paragraph 4.2.2, Operations Manager.
i Please update the table of qualifications given in FSAR Section 13.1.3.1 using current position titles.
Also, please add the qualification requirements (per ANSI/ANS 3.1-1978) for the Day Shift Supervisor.
14.
In the response to Question 9 given in your letter of September 30, 1981 (Van Brunt, APS to Tedesco, NRR), you state, "Training in mitigating core damage will be given to STA's and operating personnel from the Manager of Nuclear Operations through the operations chain to and including the licensed operators."
Please confirm this commitment now applies to the equivalent position in the revised organization, i.e., the Director of Nuclear Operations.
15.
FSAR Section 13.4.1 states, "A detailed description of the PRB is provided in the PVNGS Technical Specification...."
A similar statement is made in Section 13.4.2 regarding the NSG.
Section 16.6 of the FSAR (Technical Specifications Administrative Controls),
- however, does not provide any description of the PRB, and refers to the SAC instead of the NSG.
- Further, the description of the SAC given in FSAR Section 16.6.5.2 does not agree with the description of the NSG given in FSAR Section 13.4.2.
Please clarify these matters for the record.
16.
FSAR Section 13.4 does not address the review function of the STA/ISEG.
This function should be described in this section of the FSAR or reference should be made to an applicable description of your commitments in this area.
Please revise Section 13.4 to address this concern.
17.
Please confirm the qualifications of members of the Nuclear Safety Group and of the Group Supervisor will conform to the requirements set forth in paragraphs 4.7.1 and 4.7.2 of ANSI/ANS 3.1-1978.
~
~
18.
Section 13A of the PSAR p'resents APS responses to earlier requests for information.
Please provide revised responses where the responses
'currently in Section 13A are no longer accurate or no longer represent APS commitments.
19.
For those items not, covered in Section 13A of the CESAR, please update (as needed) the response given in letters E. E. Van Brunt to R. L. Tedesco, dated August 7; September 14 and 30; October 20 and 27; and December 3,
1981.
Responses may reference current or revised
'FSAR sections as appropriate.