'NRIG.cf Docket Nos.:
50-528, 50-529 APR 20 1984 t/Ir. E.
E.
Van Brunt, Jr.
Vice President - Nuclear Projects Arizona Public Service Company Post Office Box 21666
'Phoenix, Arizona 85036
Dear Mr. Van Brunt:
DISTRIBUTION M~50-520/529/550'RC PDR Local PDR NSIC PRC System LBII3 Reading JLee EALicitra EJordan NGrace
- Attorney, OELD ACRS (16)
Subject:
Request for Additional Information - Initial Test Program for Palo Verde As a result of our continuing review of the Palo Verde FSAR through Amendment No. 12, we have identified the need for additional information relating to the initial test program description.
The specific information required is identified in the enclosure.
He ask that you provide responses to the enclosed request.
I/lithin two weeks of receipt of this letter, we request that you advise us as to when the information will be provided.
If you have any questions regarding this letter, you should contact Manny Licitra, the Licensin'g Project Manager.
Sincerely,
Enclosure:
As stated ORIGINALSIGNED BY George It. Knighton, Chief Licensing Branch No.
3 Division of Licensing cc:
See next page DL:L843gf D
EALicitra yt i
ton 4/lf/84 4/Pl/84
I J J
il
'J i
II
PALO VERDE RE(UEST FOR ADDITIONAL INFORMATION 640.15 In response to Item 640.2 (guestion 14A.3), you stated that the response will be provided on the CESSAR docket.
Provide a specific reference for that response.
640.16 In response to Item 640.5 (guestion 14A.6), you committed to provide copies of'tartup test procedures to NRC for review at least 60 days prior to fuel loading.
FSAR Section 14.2.11 should be revised to be consistent with this commitment (Amendment 12 modification).
640.17 In the FSAR, Chapter 14 Table of figures, FSAR Figures 14.2-1 and 14.2-2 state that they will be provided later.
Figure 14.2-1 is referenced in FSAR Subsection 14.2.2.11 (Organizational Responsibilities),
while Figure 14.2-2 is, not referenced in the current FSAR Chapter 14 submittal.
The figures should be provided or deleted (Amendment 12 modification).
640.18 a.
In response to Item 640.10 (5) part 2 (guestion 14A.15), you committed to revise the 125V,DC Power System test (Appendix 14B.4) to demonstrate that the DC loads will function as necessary to assure plant safety at a battery terminal voltage equal to the acceptance criterion that has been established for minimum battery terminal voltage for the discharge load test.
Revise Appendix 14B.4 to demonstrate that all DC loads required for safe
- shutdown, as installed, will function properly at the minimum battery terminal voltage.(Amendment 12 modification).
b.
Provide assurance that voltage measurements will be taken at each load required for safe shutdown to assure an acceptable voltage drop from the appropriate Class IE bus to each load.
Palo Verde Hr. E.
E.
Van Brunt, Jr.
Vice President - Nuclear Projects Arizona Public Service Company P. 0.
Box 21666 Phoenix, Arizona 85036 Arthur C. Gehr, Esq.
Snell tm llilmer 3100 Valley Center Phoenix, Arizona 85073 Hr. James M. Flenner, Chief Counsel Arizona Corporation Commission 1200 West Washington Phoenix, Arizona 85007 Charles R. Kocher, Esq. Assistant Counsel James A. Boeletto, Esq.
Southern California Edison Company P. 0. Box 800
- Rosemead, California 91770 Ms. Margaret Walker Deputy Director of Energy Programs Economic Planning and Development Office 1700 West Washington H
Phoenix, Arizona 85007 Hr.
Rand L. Greenfield Assistant Attorney General Bataan t~emorial Building Santa Fe, New Mexico 87503 Resident Inspector Palo Verde/NPS U.S. Nuclear Regulatory Commission P. 0.
Box 21324 Phoenix, Arizona 85001 Hs. Patricia Lee Hourihan 6413 S. 26th Street Phoenix, Arizona 85040 Regional Administrator - Region V
U. S. Nuclear Regulatory Commission 1450 Maria Lane Suite 210 Walnut Creek, California 94596 Kenneth Berlin, Esq.
Winston 8 Strawn Suite 500 2550 M Street, NW Washington, DC 20037 Hs.
Lynne Bernahei Government Accountability Pro,iect of the Institute for Policy Studies 1901 Oue Street, NW Washington, OC 20009