ML17298A733
| ML17298A733 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 12/29/1983 |
| From: | Licitra E Office of Nuclear Reactor Regulation |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8401090174 | |
| Download: ML17298A733 (3) | |
Text
Docket Nos.:
50-528 50-529 and 50-530 pygmy 9 $83
'RIBUTION ument=Control=(50=928/529/53 0)
N C
PDQ PRC System LB¹3 Reading JLee MLici tra GHKnighton TNovak
- Attorney, OELD MEMORANDUM FOR:
Darrell G. Eisenhut.
Director Division of Licensing THRU:
FROM:
SUBJECT:
Thomas M. Novak, Assistant Director for Licensing Division of Licensing George Ll. Knighton, Chief Licensing Branch No.
3 Division of Licensing Emanuel A. Licitra, Project Manager Licensing Branch No.
3 Division of Licensing BACKFITTING ISSUE ON PALO VERDE The attachment provides information regarding the "backfitting" issue that has been identified for Paulo Verde.
Attachment:
As stated Orfglftal al~.l.",1 by:
George tK linlgl:tan
~
~
~
~
~
p Emanuel A. Licitra, Project Manager Licensing Branch No.
3 Division of Licens'>Wg 8401090174 831229 PDR ADOCN 05000528 PDR L;LB¹3......
ML>citra ft DATE P
~
~ ~ ~ ~ ~ ~ ~ ~ o'Y
~ ~ ~ ~ ~
~
~
~
0 ~
ghton
'~pcs NRG FORM 818 uo-80) NRCM 0240 L
~ ~ ~ tO i
~
)i
~\\ ~ ~ ~ ~
TPI
~ ~ ~\\
~i~ ~ O~+fgP 0 ~ ~ ~ ~
)~ /pjY
~Il~ ~ ~ t ~I ~ ~ ~ ~ I~
~ ~ ~
~
OF i= IC IAL R ECOR D COPY USGPO: 1981~@960
0 v>
t 1
BACKFITTIHG I'SSOES I. D. 0:
L-83-6 Plant:
Palo Verde Pro'ect Mana dr Branch E. Licitra (LB-3)
Backfit Issue:
Applicant should provide a source range neutron flux monitor in the remote shutdown panel for direct indication of reactivity to satisfy Appendix R requirements.
Licensee s Position:
Applicant disagrees with requirement.
Feels that Appendix R does not apply to OLs.
Milestones:
- 7/ll/82; NRC sent requirement letter to applicant
- 5/17/83; Applicant responded that it disagreed w/requirement
- 7/28/83; Staff replied by stating position again
- ll/23/83; Applicant responded that it is not required
- Applicant will revise response because of error A
licabilit to other facilities:
May be applicable to other facilities Next Scheduled Action:
Applicant to revise latest response.
Schedule date unkown.